← Back
Two family brick
165 GRAFTON STREET
BROOKLYN · BIN 3081545
💬 Discuss this project
1930Year Built
2Stories
B1Building Class
R6Zoning
2,080 sfGross Floor Area
2Units
1 Open Violation ▸FDNY Report ↗
Two family brick · Owner of record: GRAFTON SUITES LLC · 2,475 sf lot · 0.84 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction29p · 1 filing · 20 docs
Floor 2Under Construction23p · 1 filing · 20 docs
Floor 1Under Construction26p · 1 filing · 20 docs
BasementUnder Construction27p · 1 filing · 20 docs
1 job · most recent 07/01/2026
Sprinkler System
FiledStatusContractorScope
07/01/2026Signed-offDYNAMIC PLBNG & SPRKR CORSprinkler System
1 job · most recent 07/01/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
07/01/2026Signed-offKISHAN PLUMBING INCGas, Storm, Water/Sanitary
1 job · most recent 03/31/2026
General Wiring
FiledStatusContractorScope
03/31/2026CompleteSHTRAL ELECT'L CONT'G CORGeneral Wiring
1 job · most recent 07/01/2026
FiledStatusContractorScope
07/01/2026Signed-offKISHAN PLUMBING INC1 scope_items
Building Lifecycle
All (127)Filed (10)Permit Issued (8)Signed Off (5)Violation (2)Inspection (10)Objection (78)Special Inspection (14)
08/03/2026
Signed off — Alteration CO
APPLICATION FILED HEREWITH TO CONVERT AN EXISTING THREE STORY TWO FAMILY BUILDING INTO AN EIGHT FAMILY
B01231531-S4
07/29/2026
Signed off — Alteration CO
APPLICATION FILED HEREWITH TO CONVERT AN EXISTING THREE STORY TWO FAMILY BUILDING INTO AN EIGHT FAMILY
B01231531-S3
07/17/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
07/17/2026
Special inspection requirement — Permanent certificate
Shahrish Shuvo
07/17/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Shahrish Shuvo
07/17/2026
Special inspection requirement — HVAC-R and service water heating equipment
Shahrish Shuvo
07/17/2026
Special inspection requirement — HVAC-R and service water heating system controls
Shahrish Shuvo
07/17/2026
Special inspection requirement — Maintenance information
Shahrish Shuvo
07/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
07/17/2026
Special inspection requirement — Post-installed Anchors
Shahrish Shuvo
07/17/2026
Special inspection requirement — Heating Systems
Shahrish Shuvo
07/01/2026
Filed — Alteration CO
APPLICATION FILED HEREWITH TO CONVERT AN EXISTING THREE STORY TWO FAMILY BUILDING INTO AN EIGHT FAMILY
B01231531-P2
07/01/2026
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
06/11/2026
Signed off — Alteration CO
APPLICATION FILED HEREWITH TO CONVERT AN EXISTING THREE STORY TWO FAMILY BUILDING INTO AN EIGHT FAMILY
B01231531-S2
06/11/2026
Signed off — Alteration
APPLICATION FILED HEREWITH FOR INTERIOR DEMOLITION
B01238242-I1
06/11/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/05/2026
Permit issued — Boiler Equipment
B01231531-S4-BE
05/15/2026
Permit issued — Mechanical Systems
B01231531-S2-MS
04/20/2026
Objection resolved — Resolved
04/16/2026
Filed — Alteration CO
APPLICATION FILED HEREWITH TO CONVERT AN EXISTING THREE STORY TWO FAMILY BUILDING INTO AN EIGHT FAMILY
B01231531-S6
04/16/2026
Objection resolved — Resolved
04/16/2026
Objection resolved — Resolved
04/16/2026
Objection resolved — Resolved
04/16/2026
Objection resolved — Resolved
04/14/2026
Signed off — Alteration
APPLICATION FILED HEREWITH FOR INSTALLATION OF A TEMORARY CONSTRUCTION FENCE
B01256950-I1
04/14/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/31/2026
Objection raised — Cost
03/31/2026
Objection raised — Plumbing
03/31/2026
Objection raised — Scope
03/31/2026
Objection raised — Scope
03/31/2026
Objection raised — Scope
03/31/2026
Objection raised — Plumbing
03/31/2026
Objection resolved — Addressed
03/11/2026
Filed — Alteration CO
APPLICATION FILED HEREWITH TO CONVERT AN EXISTING THREE STORY TWO FAMILY BUILDING INTO AN EIGHT FAMILY
B01231531-P1
02/20/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/19/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
02/12/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
02/11/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/04/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
02/04/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/02/2026
Permit issued — General Construction
B01231531-I1-GC
01/30/2026
Permit issued — Construction Fence
B01256950-I1-FN
01/28/2026
Permit issued — Sprinklers
B01231531-S3-EW-SP
01/27/2026
Permit issued — Plumbing
B01231531-S1-PL
01/07/2026
Objection resolved — Addressed
01/05/2026
Objection resolved — Addressed
01/05/2026
Objection resolved — Addressed
01/05/2026
Objection resolved — Addressed
01/05/2026
Objection resolved — Addressed
12/31/2025
Objection raised — Other
12/31/2025
Objection resolved — Addressed
12/23/2025
Objection resolved — Addressed
12/17/2025
Objection resolved — Addressed
12/15/2025
Objection resolved — Addressed
12/11/2025
Objection raised — Fire_Protection
12/11/2025
Objection resolved — Addressed
12/11/2025
Objection raised — Mechanical
12/11/2025
Objection resolved — Addressed
12/11/2025
Objection raised — Accessibility
12/11/2025
Objection raised — Fire_Protection
Latest 60 of 127 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GRAFTON SUITES LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/01/2025$925K—165 GRAFTON LLC → GRAFTON SUITES LLC$445/sf building
06/10/2015$470K—Private party → 165 GRAFTON LLC$226/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
VASILIOS ARTEMIOU PE507/01/2026
SHAHRISH SHUVO ENGINEERING P.C.204/16/2026
AG ENGINEERING PLLC403/11/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
XPDITE GROUP LLC (104)603/21/2026
BMG GROUP USA203/21/2026
XPDITE GROUP LLC 104303/21/2026
XPDITE GROUP LLC 105303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BH GENERAL CONTRACTING INGeneral Contractor307/08/2026
BALICO GENERAL CONTRACTINGeneral Contractor207/08/2026
KISHAN PLUMBING INCPlumbing207/08/2026
DYNAMIC PLBNG & SPRKR CORFire Protection106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SHAHRISH SHUVO ENGINEERIN8524707/01/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offKISHAN PLUMBING INC06/05/2026
DOB NOWMechanical SystemsSigned-offBH GENERAL CONTRACTING IN05/15/2026
DOB NOWGeneral ConstructionPermit IssuedBH GENERAL CONTRACTING IN02/02/2026
DOB NOWConstruction FenceSigned-offBH GENERAL CONTRACTING IN01/30/2026
DOB NOWSprinklersSigned-offCITYWIDE PLBG, HTG &SPRKL01/28/2026
DOB NOWPlumbingPermit IssuedN AND S PLUMBING INC01/27/2026
DOB NOWConstruction FenceSigned-offBALICO GENERAL CONTRACTIN09/03/2025
DOB NOWGeneral ConstructionSigned-offBALICO GENERAL CONTRACTIN07/09/2025
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
07/17/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
07/01/2026Pass-Final Boiler Equipment InspectionPassView ↗
06/11/2026Pass-Final CND-Occupancy InspectionPassView ↗
04/14/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/20/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/19/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
02/12/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
02/11/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/04/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
02/04/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
07/17/2026Permanent certificateShahrish Shuvoenergy_progress
07/17/2026HVAC-R and service water piping design and insulationShahrish Shuvoenergy_progress
07/17/2026HVAC-R and service water heating equipmentShahrish Shuvoenergy_progress
07/17/2026HVAC-R and service water heating system controlsShahrish Shuvoenergy_progress
07/17/2026Maintenance informationShahrish Shuvoenergy_progress
07/17/2026Fire-Resistant Penetrations and JointsShahrish Shuvospecial
07/17/2026Post-installed AnchorsShahrish Shuvospecial
07/17/2026Heating SystemsShahrish Shuvospecial
11/25/2025Post-installed AnchorsShahrish Shuvospecial
07/30/2025Fire-Resistant Penetrations and JointsShahrish Shuvospecial
07/17/2025Post-installed AnchorsShahrish Shuvospecial
07/17/2025Fire-Resistant Penetrations and JointsShahrish Shuvospecial
06/27/2025Sprinkler SystemsShahrish Shuvospecial
06/09/2025FinalPRAMODRAY SHAHprogress
▾Documents — 33 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/21/2026B01231531-S6Contact architect ↗
08/21/2026B01238242-I1Contact architect ↗
08/21/2026B01256950-I1Contact architect ↗
Showing 3 of 10 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026B01231531-P1Open ↗
08/13/2026B01231531-I1Open ↗
▸Seals & Professional Certifications16
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/21/2026B01238242-I1Open ↗
08/21/2026B01256950-I1Open ↗
08/17/2026B01231531-P2Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/23/2026B01231531-S3Open ↗
08/29/2026B01231531-S4Open ↗
08/29/2026B01231531-S4Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/29/2026B01231531-S4Open ↗
08/23/2026B01238242-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/13/2026B01231531-P1Open ↗
08/13/2026B01231531-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/17/2026B01231531-S6Open ↗
▸Other Documents2
▸DOB NOWProperty Ownership Certification2
08/13/2026B01231531-P1Open ↗
08/13/2026B01231531-I1Open ↗