Primarily 1 family with 1 store or office
60 LOTT AVENUE
BROOKLYN · BIN 3082713
💬 Discuss this project
1930Year Built
2Stories
S1Building Class
R6Zoning
1,634 sfGross Floor Area
2Units
2 Open Violations ▸FDNY Report ↗
Primarily 1 family with 1 store or office · 1,600 sf lot · 1.02 FAR built · Flood zone X
Locations of Work
StructuralPlumbing
Roof1p · 1 filing · 9 docs
Floor 21p · 1 filing · 20 docs
Floor 11 filing · 20 docs
Cellar1 filing · 20 docs
1 job · most recent 10/29/2024
Gas Water/Sanitary
FiledStatusContractorScope
10/29/2024Signed-offHIGHLAND PLUMBING LLCGas, Water/Sanitary
1 job · most recent 10/26/2021
General Wiring
FiledStatusContractorScope
10/26/2021CompleteMAITLAND ELECTRIC CORP.General Wiring
1 job · most recent 10/29/2024
Steel Masonry Wood
FiledStatusContractorScope
10/29/2024Permit IssuedTHE GAMUT ORGANIZATIONSteel, Masonry, Wood
Building Lifecycle
All (45)Filed (7)Permit Issued (6)Violation (4)Inspection (4)Objection (6)Special Inspection (18)
06/27/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
11/05/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/31/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
IGOR LISOVENKO
10/31/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
IGOR LISOVENKO
10/31/2024
Special inspection requirement — Interior lighting power
IGOR LISOVENKO
10/31/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
IGOR LISOVENKO
10/31/2024
Special inspection requirement — Air barrier - visual inspection
IGOR LISOVENKO
10/29/2024
Filed — Alteration
APPLICATION FOR PLUMBING WORKS ONLY FOREXISTING CELLAR, 1ST FLOOR, & 2ND FLOOR AS PER PLAN OF AN EXISTING MIXED DWELLING. CONSTRUCTION APPLICATION FILED UNDER #B00547877. NO CHANGE IN USE,EGRESS OROCCUPANCY
B00547880-P2
10/29/2024
Filed — Alteration
Subsequent filling to address the structural components of the renovation work of existing house as per the inspection objections and remove stop work order. No change in use egress or occupancy.
B00547877-P2
11/30/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/30/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/24/2023
Permit issued — Plumbing
B00547880-I1-PL
06/15/2023
Permit issued — Plumbing
B00547880-I1-PL
06/06/2023
Permit issued — Structural
B00547877-S1-ST
05/08/2023
Objection resolved — Addressed
05/02/2023
Objection raised — Scope
04/21/2023
Objection resolved — Addressed
04/21/2023
Objection resolved — Addressed
04/20/2023
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
IGOR LISOVENKO
04/19/2023
Objection raised — Inspections
04/19/2023
Objection raised — Scope
04/14/2023
Filed — Alteration
Subsequent filling to address the structural components of the renovation work of existing house as per the inspection objections and remove stop work order. No change in use egress or occupancy.
B00547877-S1
04/10/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
IGOR LISOVENKO
04/10/2023
Special inspection requirement — Concrete - Cast-In-Place
IGOR LISOVENKO
04/10/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
IGOR LISOVENKO
04/10/2023
Special inspection requirement — Structural Wood Frame
IGOR LISOVENKO
04/03/2023
Special inspection requirement — Masonry
IGOR LISOVENKO
04/03/2023
Special inspection requirement — Structural Steel - Details
IGOR LISOVENKO
12/08/2022
Special inspection requirement — Final
IGOR LISOVENKO
11/08/2022
Permit issued — General Construction
B00547877-I1-GC
10/21/2022
Filed — Alteration
Subsequent filling to address the structural components of the renovation work of existing house as per the inspection objections and remove stop work order. No change in use egress or occupancy.
B00547877-P1
10/13/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
IGOR LISOVENKO
10/13/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
IGOR LISOVENKO
10/13/2022
Special inspection requirement — Air barrier - visual inspection
IGOR LISOVENKO
10/13/2022
Special inspection requirement — Interior lighting power
IGOR LISOVENKO
10/13/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
IGOR LISOVENKO
09/08/2022
Filed — Alteration
APPLICATION FOR PLUMBING WORKS ONLY FOREXISTING CELLAR, 1ST FLOOR, & 2ND FLOOR AS PER PLAN OF AN EXISTING MIXED DWELLING. CONSTRUCTION APPLICATION FILED UNDER #B00547877. NO CHANGE IN USE,EGRESS OROCCUPANCY
B00547880-P1
04/26/2022
Permit issued — Plumbing
B00547880-I1-PL
11/08/2021
Permit issued — General Construction
B00547877-I1-GC
07/06/2021
Filed — Alteration
APPLICATION FOR PLUMBING WORKS ONLY FOREXISTING CELLAR, 1ST FLOOR, & 2ND FLOOR AS PER PLAN OF AN EXISTING MIXED DWELLING. CONSTRUCTION APPLICATION FILED UNDER #B00547877. NO CHANGE IN USE,EGRESS OROCCUPANCY
B00547880-I1
07/06/2021
Filed — Alteration
Subsequent filling to address the structural components of the renovation work of existing house as per the inspection objections and remove stop work order. No change in use egress or occupancy.
B00547877-I1
09/24/2014
Violation issued (HPD, open)
C
04/06/2014
Violation issued (DOB, closed)
V%-DOB VIOLATION
12/12/2013
Violation issued (ECB, closed)
Construction
11/10/2007
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
7173 LOTT CORP103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/09/2021$800K—THE GAMUT ORGANIZATION INC → Private party$490/sf building
12/05/2018$175K—— → —$107/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LESLIE M. GOOD ARCHITECTS410/29/2024
JCM ARCHITECTURE PC104/14/2023
ARC-HI-TECT ASSOCIATE INC210/21/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PNP MANAGEMENT AND CONSULTING INC603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
THE GAMUT ORGANIZATIONGeneral Contractor707/08/2026
HIGHLAND PLUMBING LLCPlumbing707/08/2026
PLBG P & H INCPlumbing207/08/2026
GARFIELD MAITLANDElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ARC-HI-TECH ASSOCIATES IN6963410/29/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offHIGHLAND PLUMBING LLC11/24/2023
DOB NOWPlumbingSigned-offPLBG P & H INC06/15/2023
DOB NOWStructuralPermit IssuedTHE GAMUT ORGANIZATION06/06/2023
DOB NOWGeneral ConstructionSigned-offTHE GAMUT ORGANIZATION11/08/2022
DOB NOWPlumbingSigned-offPLBG P & H INC04/26/2022
DOB NOWGeneral ConstructionSigned-offTHE GAMUT ORGANIZATION11/08/2021
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
06/27/2025Pass-Final General Construction Non-Directive 14PassView ↗
11/05/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/30/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/30/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
10/31/2024Structural Stability – Alterations of existing buildingsIGOR LISOVENKOspecial
10/31/2024Fire-Resistant Penetrations and JointsIGOR LISOVENKOspecial
10/31/2024Interior lighting powerIGOR LISOVENKOenergy_progress
10/31/2024Fenestration and door U-factor and product ratingsIGOR LISOVENKOenergy_progress
10/31/2024Air barrier - visual inspectionIGOR LISOVENKOenergy_progress
04/20/2023Subsurface Conditions – Fill Placement & In-Place DensityIGOR LISOVENKOspecial
04/10/2023Structural Stability – Alterations of existing buildingsIGOR LISOVENKOspecial
04/10/2023Concrete - Cast-In-PlaceIGOR LISOVENKOspecial
04/10/2023Fire-Resistant Penetrations and JointsIGOR LISOVENKOspecial
04/10/2023Structural Wood FrameIGOR LISOVENKOprogress
04/03/2023MasonryIGOR LISOVENKOspecial
04/03/2023Structural Steel - DetailsIGOR LISOVENKOspecial
12/08/2022FinalIGOR LISOVENKOprogress
10/13/2022Fire-Resistant Penetrations and JointsIGOR LISOVENKOspecial
10/13/2022Structural Stability – Alterations of existing buildingsIGOR LISOVENKOspecial
10/13/2022Air barrier - visual inspectionIGOR LISOVENKOenergy_progress
10/13/2022Interior lighting powerIGOR LISOVENKOenergy_progress
10/13/2022Fenestration and door U-factor and product ratingsIGOR LISOVENKOenergy_progress
▾Documents — 30 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/28/2026B00547880-P2Request digital key ↗
08/28/2026B00547880-P1Request digital key ↗
08/28/2026B00547880-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications16
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/28/2026B00547880-P2Open ↗
08/28/2026B00547880-P1Open ↗
08/28/2026B00547880-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/01/2026B00547877-I1Open ↗
09/01/2026B00547877-I1Open ↗
09/01/2026B00547877-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026B00547877-I1Open ↗
09/01/2026B00547877-I1Open ↗
08/31/2026B00547877-S1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/28/2026B00547880-P2Open ↗
08/28/2026B00547880-P1Open ↗
08/28/2026B00547880-I1Open ↗
Showing 3 of 7 on file for this type