← Back
Two family frame
88 MILLER AVENUE
BROOKLYN · BIN 3083202
💬 Discuss this project
1901Year Built
2Stories
B2Building Class
R4Zoning
1,560 sfGross Floor Area
2Units
Two family frame · 2,500 sf lot · 0.62 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
1 job · most recent 06/08/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/08/2026Signed-offURENA CONST & DESIGN INCHeating and Air Conditioning Systems
Heat / Cool
Daikin 4MXS36RMVJU 36,000 BTU · Condensing Unit ×1
5MXS48TVJU 48,000 BTU · Condensing Unit ×1
Cmna DLFSHCH09XAK 9,000 BTU · Fan Coil Indoor ×4
DLCMHBH36DAK 36,000 BTU · Condensing Unit ×2
DLFSHCH18XAK 18,000 BTU · Fan Coil Indoor ×2
DLCSRBH12AAK 12,000 BTU · Condensing Unit ×1
DLFSHCH12XAK 12,000 BTU · Fan Coil Indoor ×1
1 job · most recent 06/08/2026
Gas Water/Sanitary
FiledStatusContractorScope
06/08/2026Signed-offINFINITI ESC PLUMBING CORGas, Water/Sanitary
1 job · most recent 03/28/2025
General Wiring
FiledStatusContractorScope
03/28/2025CompleteDD&G ELECTRICAL CORPGeneral Wiring
1 job · most recent 06/08/2026
Wood
FiledStatusContractorScope
06/08/2026Signed-offURENA CONST & DESIGN INCWood
Building Lifecycle
All (78)Filed (4)Permit Issued (3)Inspection (8)Objection (44)Special Inspection (19)
06/19/2026
Objection resolved — Addressed
06/11/2026
Objection raised — Scope
06/08/2026
Filed — Alteration
RENOVATION OF EXISTING TWO FAMILY. WORK INCLUDES REMOVAL OF FLOORING, NON LOAD BEARING WALL, NEW FLOOR, CEILING , PARTITION. NO CHANGE IN USE, EGRESS OR OCCUPACY
B00917743-P1
04/30/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Hackjong Choi
04/21/2026
Special inspection requirement — HVAC-R and service water heating equipment
Hackjong Choi
04/21/2026
Special inspection requirement — Maintenance information
Hackjong Choi
04/21/2026
Special inspection requirement — HVAC-R and service water heating system controls
Hackjong Choi
04/21/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Hackjong Choi
04/21/2026
Special inspection requirement — Energy Code Compliance Inspections
Hackjong Choi
09/15/2025
Permit issued — Mechanical Systems
B00917743-S4-MS
05/22/2025
Objection resolved — Addressed
03/04/2025
Objection raised — Zoning
02/28/2025
Filed — Alteration
RENOVATION OF EXISTING TWO FAMILY. WORK INCLUDES REMOVAL OF FLOORING, NON LOAD BEARING WALL, NEW FLOOR, CEILING , PARTITION. NO CHANGE IN USE, EGRESS OR OCCUPACY
B00917743-S4
02/27/2025
Special inspection requirement — Maintenance information
Hackjong Choi
02/27/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Hackjong Choi
02/27/2025
Special inspection requirement — HVAC-R and service water heating equipment
Hackjong Choi
02/27/2025
Special inspection requirement — HVAC-R and service water heating system controls
Hackjong Choi
02/18/2025
Special inspection requirement — Mechanical Systems
Hackjong Choi
02/18/2025
Special inspection requirement — Final
Hackjong Choi
01/08/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
11/22/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/25/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/25/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/25/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/20/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/13/2024
Permit issued — Plumbing
B00917743-S3-PL
09/05/2024
Objection resolved — Addressed
09/05/2024
Objection resolved — Addressed
08/23/2024
Objection resolved — Addressed
08/22/2024
Objection resolved — Addressed
08/22/2024
Objection resolved — Addressed
08/12/2024
Objection resolved — Addressed
08/07/2024
Filed — Alteration
RENOVATION OF EXISTING TWO FAMILY. WORK INCLUDES REMOVAL OF FLOORING, NON LOAD BEARING WALL, NEW FLOOR, CEILING , PARTITION. NO CHANGE IN USE, EGRESS OR OCCUPACY
B00917743-S3
08/07/2024
Objection raised — Scope
08/07/2024
Objection raised — Scope
08/07/2024
Objection raised — Inspections
08/07/2024
Objection raised — Admin
08/07/2024
Objection raised — Admin
08/07/2024
Objection raised — Admin
07/31/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/13/2024
Permit issued — Structural
B00917743-I1-GC-CX
05/10/2024
Objection resolved — Addressed
05/10/2024
Objection resolved — Addressed
04/29/2024
Objection resolved — Addressed
04/17/2024
Objection raised — Zoning
04/08/2024
Objection resolved — Addressed
04/02/2024
Objection raised — Admin
03/21/2024
Objection resolved — Addressed
03/21/2024
Objection resolved — Addressed
03/21/2024
Objection resolved — Addressed
03/21/2024
Objection resolved — Addressed
03/21/2024
Objection resolved — Addressed
03/21/2024
Objection resolved — Addressed
03/21/2024
Objection resolved — Addressed
03/21/2024
Objection resolved — Addressed
03/21/2024
Objection resolved — Addressed
10/19/2023
Objection raised — Structural
10/19/2023
Objection raised — Structural
10/19/2023
Objection raised — Admin
Latest 60 of 78 events.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/29/2017$160K—Private party → Private party$103/sf building
07/13/2015$410K—— → —$263/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HC ARCHITECT, PC406/08/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CH CORNERSTONE DESIGN303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DD&G ELECTRICAL CORPElectrical103/22/2026
IFLOODED SERVICES INCGeneral Contractor107/08/2026
URENA CONST & DESIGN INCGeneral Contractor104/09/2026
INFINITI ESC PLUMBING CORPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BEYOND ARCH LLC3600406/08/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offURENA CONST & DESIGN INC09/15/2025
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR09/13/2024
DOB NOWStructuralSigned-offIFLOODED SERVICES06/13/2024
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
04/30/2026Pass-Final General Construction Non-Directive 14PassView ↗
01/08/2025Fail-Final General Construction Non-Directive 14FailView ↗
11/22/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/25/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/25/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/25/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/20/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/31/2024Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
04/21/2026Fire-Resistant Penetrations and JointsHackjong Choispecial
04/21/2026HVAC-R and service water heating equipmentHackjong Choienergy_progress
04/21/2026Maintenance informationHackjong Choienergy_progress
04/21/2026HVAC-R and service water heating system controlsHackjong Choienergy_progress
04/21/2026HVAC-R and service water piping design and insulationHackjong Choienergy_progress
04/21/2026Energy Code Compliance InspectionsHackjong Choiprogress
02/27/2025Maintenance informationHackjong Choienergy_progress
02/27/2025HVAC-R and service water piping design and insulationHackjong Choienergy_progress
02/27/2025HVAC-R and service water heating equipmentHackjong Choienergy_progress
02/27/2025HVAC-R and service water heating system controlsHackjong Choienergy_progress
02/18/2025Mechanical SystemsHackjong Choispecial
02/18/2025FinalHackjong Choiprogress
08/22/2023Energy Code Compliance InspectionsHackjong Choiprogress
08/22/2023Lighting in dwelling unitsHackjong Choienergy_progress
08/16/2023Fenestration and door U-factor and product ratingsHackjong Choienergy_progress
08/16/2023Fire-Resistant Penetrations and JointsHackjong Choispecial
08/16/2023Fenestration areasHackjong Choienergy_progress
08/10/2023Structural Stability – Alterations of existing buildingsHackjong Choispecial
08/10/2023FinalTae Chongprogress
▾Documents — 28 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/16/2026B00917743-S4Contact architect ↗
08/16/2026B00917743-S3Contact architect ↗
08/16/2026B00917743-S2Contact architect ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWRestrictive Declaration/Easement 14
08/14/2026B00917743-P1Open ↗
08/13/2026B00917743-S3Open ↗
08/13/2026B00917743-S2Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications14
▸DOB NOWProgress Inspector Seal & Signature7
08/24/2026B00917743-I1Open ↗
08/24/2026B00917743-I1Open ↗
08/24/2026B00917743-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/16/2026B00917743-P1Open ↗
08/13/2026B00917743-S3Open ↗
08/13/2026B00917743-S4Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/24/2026B00917743-I1Open ↗
08/24/2026B00917743-S4Open ↗
08/23/2026B00917743-P1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/14/2026B00917743-P1Open ↗
08/13/2026B00917743-S2Open ↗
08/13/2026B00917743-S4Open ↗
Showing 3 of 5 on file for this type