← Back
Five to six families
486 GLENMORE AVENUE
BROOKLYN · BIN 3083880
💬 Discuss this project
1930Year Built
3Stories
C2Building Class
R5BZoning
5,250 sfGross Floor Area
6Units
Rent Stabilized334 Open Violations 326 unresolved · 8 paperwork only ▸FDNY Report ↗
Five to six families · Owner of record: 486 GLENMORE EPA INC. · 2,500 sf lot · 2.1 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Roof1p · 1 filing · 12 docs
Floor 34p · 2 filings · 11 docs
Floor 24p · 1 filing · 4 docs
Floor 15p · 3 filings · 20 docs
Cellar5p · 2 filings · 11 docs
Basement1p · 1 filing · 12 docs
1 job · most recent 05/11/2024
FiledStatusContractorScope
05/11/2024Permit IssuedRICHARD NEU—
1 job · most recent 02/22/2024
Wood
FiledStatusContractorScope
02/22/2024Permit IssuedDIOMEDES E ARBOLEDAWood
2 jobs · most recent 05/26/2026
Sidewalk Shed
FiledStatusContractorScope
05/26/2026Permit IssuedLAKHI GENERAL CONTRACTORSidewalk Shed
05/02/2024Signed-offPARK CONTRACTING GROUPSidewalk Shed
1 job · most recent 12/17/2025
Full Demolition Notification
FiledStatusContractorScope
12/17/2025Signed-offGRANITE ENVIRONMENT, LLCFull Demolition Notification
Building Lifecycle
All (104)Filed (6)Permit Issued (8)Signed Off (2)Violation (60)Inspection (1)Objection (22)Special Inspection (5)
08/11/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/26/2026
Violation issued (ECB, open)
Construction
06/26/2026
Violation issued (ECB, open)
Construction
05/28/2026
Permit issued — Sidewalk Shed
B01377308-I1-SH
05/26/2026
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01377308-I1
05/22/2026
Signed off — Alteration
B00986422-I1
05/19/2026
Signed off — Full Demolition
Full demolition of 3 story multi-family dwelling to comply with NYC HPD Emergency Declaration, DEC# 19775
B01328793-I1
05/07/2026
Permit issued — Sidewalk Shed
B01044885-I1-SH
05/04/2026
Violation issued (HPD, open)
A
04/10/2026
Permit issued — Full Demolition
B01328793-I1-FD
03/06/2026
Permit issued — Construction Fence
B00986422-I1-FN
02/27/2026
Filed — Alteration
B00986422-I1
02/05/2026
Objection resolved — Addressed
01/07/2026
Objection raised — Other
12/17/2025
Filed — Full Demolition
Full demolition of 3 story multi-family dwelling to comply with NYC HPD Emergency Declaration, DEC# 19775
B01328793-I1
12/05/2025
Special inspection requirement — Demolition
THOMAS WENDEL
12/05/2025
Special inspection requirement — Structural Stability – Alterations of existing Buildings
THOMAS WENDEL
11/26/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/26/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/18/2025
Violation issued (HPD, open)
I
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/18/2025
Violation issued (ECB, open)
Construction
09/18/2025
Violation issued (ECB, open)
Zoning
09/18/2025
Violation issued (ECB, open)
Construction
06/09/2025
Violation issued (HPD, open)
A
05/07/2025
Permit issued — Sidewalk Shed
B01044885-I1-SH
11/26/2024
Permit issued — General Construction
B01011667-I1-GC
11/26/2024
Violation issued (HPD, open)
I
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/10/2024
Permit issued — Sidewalk Shed
B01044885-I1-SH
05/02/2024
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B01044885-I1
04/24/2024
Permit issued — Structural
B00998034-I1-GC-CX
04/10/2024
Violation issued (HPD, open)
A
03/26/2024
Objection resolved — Addressed
03/26/2024
Objection resolved — Addressed
03/26/2024
Objection resolved — Addressed
03/26/2024
Objection resolved — Addressed
03/26/2024
Objection resolved — Addressed
03/26/2024
Objection resolved — Addressed
03/26/2024
Objection resolved — Addressed
03/26/2024
Objection resolved — Addressed
03/26/2024
Objection resolved — Addressed
03/25/2024
Objection resolved — Addressed
03/04/2024
Filed — Alteration
B01011667-I1
02/28/2024
Objection raised — Scope
02/28/2024
Objection raised — Other
02/28/2024
Objection raised — Other
02/28/2024
Objection raised — Structural
02/28/2024
Objection raised — Cost
02/28/2024
Objection raised — Scope
02/28/2024
Objection raised — Admin
02/28/2024
Objection raised — Scope
02/28/2024
Objection raised — Structural
02/28/2024
Objection raised — Admin
02/22/2024
Filed — Alteration
Exterior Facade repair work along Exposure 1, 3 & 4. Wall repair work along exposure 3. Structural framing reinforcement as per plans.
B00998034-I1
01/30/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
01/30/2024
Special inspection requirement — Final
NAVEEN KUMAR
01/30/2024
Special inspection requirement — Structural Wood Frame
Younes Abouyaala
11/17/2023
Violation issued (HPD, open)
I
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Latest 60 of 104 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LAKHI GENERAL CONTRACTOR208/29/2026
MNK ENTERPRISES NY607/08/2026
HOUSING PRESERVATION DEVELOPMENT704/12/2026
486 GLENMORE EPA INC.403/22/2026
486 GLENMORE CORP503/22/2026
HAROLD ADAR LLC603/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/11/2024$50K—TGA REALTY LLC → 486 GLENMORE EPA INC.$10/sf building
06/30/2023$690K—Private party → TGA REALTY, LLC$131/sf building
04/11/2019$15K—— → —$3/sf building
04/11/2019$35K—— → —$7/sf building
02/07/2018$40K—486 GLENMORE CORP → GLENMORE PROPERTIES LLC$8/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HIRANI ENGINEERING LAND SURVEY203/21/2026
GERALD J. CALIENDO R.A., P.C.103/21/2026
XPEDITE203/21/2026
GERALD J CALIENDO R A P C103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DIOMEDES E ARBOLEDAGeneral Contractor303/21/2026
GRANITE ENVIRONMENT, LLCGeneral Contractor204/12/2026
PARK CONTRACTING GROUPGeneral Contractor207/08/2026
T&J CONTRACTING INCGeneral Contractor203/21/2026
LAKHI GENERAL CONTRACTORGeneral Contractor107/08/2026
MNK ENTERPRISES NY INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HIRANI ENGINEERING & LAND679112/17/2025
AA BUILDING & INSPECTION1519102/22/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedLAKHI GENERAL CONTRACTOR05/28/2026
DOB NOWSidewalk ShedSigned-offPARK CONTRACTING GROUP05/07/2026
DOB NOWFull DemolitionSigned-offGRANITE ENVIRONMENT, LLC04/10/2026
DOB NOWConstruction FenceSigned-offGRANITE ENVIRONMENT, LLC03/06/2026
DOB NOWSidewalk ShedSigned-offPARK CONTRACTING GROUP05/07/2025
DOB NOWGeneral ConstructionPermit IssuedT&J CONTRACTING INC11/26/2024
DOB NOWSidewalk ShedSigned-offMNK ENTERPRISES NY INC05/10/2024
DOB NOWStructuralPermit IssuedDIOMEDES E ARBOLEDA04/24/2024
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
08/11/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
12/05/2025DemolitionTHOMAS WENDELspecial
12/05/2025Structural Stability – Alterations of existing BuildingsTHOMAS WENDELspecial
01/30/2024Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
01/30/2024FinalNAVEEN KUMARprogress
01/30/2024Structural Wood FrameYounes Abouyaalaprogress
▾Documents — 31 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/25/2026B00998034-I1Request digital key ↗
08/25/2026B01011667-I1Request digital key ↗
08/25/2026B01044885-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/25/2026B00998034-I1Open ↗
08/25/2026B01011667-I1Open ↗
08/25/2026B01044885-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/28/2026B00998034-I1Open ↗
08/27/2026B01328793-I1Open ↗
08/27/2026B01328793-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/28/2026B00998034-I1Open ↗
08/28/2026B00998034-I1Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWElectric Cut-Off1
08/13/2026B01328793-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026B01328793-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026B01328793-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026B01328793-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/25/2026B00998034-I1Open ↗
08/25/2026B01011667-I1Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/19/2026B01328793-I1Open ↗
▸DOB NOWRodent Control1
08/13/2026B01328793-I1Open ↗
▸Other Documents8
▸DOB NOWHPD4: CONH Pilot Program6
08/16/2026B01377308-I1Open ↗
08/13/2026B01011667-I1Open ↗
08/13/2026B00986422-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026B01328793-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/19/2026B01328793-I1Open ↗