Two family brick
594 MILLER AVENUE
BROOKLYN · BIN 3084798
💬 Discuss this project
1910Year Built
2Stories
B1Building Class
R6Zoning
2,400 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family brick · Owner of record: 594 MILLER HOLDINGS LLC · 2,500 sf lot · 0.96 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalFire Protection
Floor 215p · 1 filing · 20 docs
Floor 116p · 1 filing · 20 docs
Basement18p · 1 filing · 20 docs
1 job · most recent 11/13/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
11/13/2025Permit IssuedBUILDERS GROUP USA INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin 2MM18AVJU9 54,000 BTU · Heat Pump Outdoor ×6
RXF12AXVJU 36,000 BTU · Heat Pump Outdoor ×6
3MXM24AVJU9 48,000 BTU · Heat Pump Outdoor ×4
Ventilation
Nutone AEN110 110 CFM · Exhaust Fan ×16
QTXEN150 150 CFM · Exhaust Fan ×16
1 job · most recent 11/13/2025
Storm Water/Sanitary
FiledStatusContractorScope
11/13/2025Signed-offTARGET PIPING NY LLCStorm, Water/Sanitary
2 jobs · most recent 02/27/2025
General Wiring
FiledStatusContractorScope
02/27/2025CompletePOWER DIRECT ELECTRIC INC—
02/27/2025CompletePOWER DIRECT ELECTRIC INCGeneral Wiring
1 job · most recent 11/13/2025
Concrete Masonry Wood
FiledStatusContractorScope
11/13/2025Permit IssuedBUILDERS GROUP USA INCConcrete, Masonry, Wood
1 job · most recent 11/13/2025
Fence
FiledStatusContractorScope
11/13/2025Permit IssuedBUILDERS GROUP USA INCFence
1 job · most recent 11/13/2025
Construction Fence
FiledStatusContractorScope
11/13/2025Permit IssuedBUILDERS GROUP USA INCConstruction Fence
Building Lifecycle
All (100)Filed (10)Permit Issued (7)Signed Off (5)Violation (3)Inspection (9)Objection (36)Special Inspection (30)
07/28/2026
Signed off — Alteration CO
Filing Mechanical drawings subsequent to primary job number B01109818-I1
B01109818-S2
07/28/2026
Signed off — Alteration CO
Filing Mechanical drawings subsequent to primary job number B01109818-I1
B01109818-S3
12/23/2025
Signed off — Alteration CO
Filing Mechanical drawings subsequent to primary job number B01109818-I1
B01109818-S1
12/22/2025
Signed off — Alteration CO
Filing Mechanical drawings subsequent to primary job number B01109818-I1
B01109818-S4
12/16/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/16/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
12/16/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/11/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/01/2025
Signed off — Alteration CO
Filing Mechanical drawings subsequent to primary job number B01109818-I1
B01109818-S5
12/01/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/18/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/13/2025
Filed — Alteration CO
Filing Mechanical drawings subsequent to primary job number B01109818-I1
B01109818-P5
11/12/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
11/12/2025
Special inspection requirement — Permanent certificate
FAHAD FATEH
11/12/2025
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
11/12/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
11/12/2025
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
11/12/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
11/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
11/07/2025
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
11/07/2025
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
11/07/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
11/07/2025
Special inspection requirement — Ventilation and air distribution system
FAHAD FATEH
11/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
11/07/2025
Special inspection requirement — Heating Systems
FAHAD FATEH
11/07/2025
Special inspection requirement — Mechanical Systems
FAHAD FATEH
11/07/2025
Special inspection requirement — Post-installed Anchors
FAHAD FATEH
11/07/2025
Special inspection requirement — Final
FAHAD FATEH
11/07/2025
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
11/07/2025
Special inspection requirement — Permanent certificate
FAHAD FATEH
11/07/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
11/03/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/30/2025
Objection resolved — Addressed
10/29/2025
Objection raised — Energy
10/29/2025
Objection resolved — Addressed
10/28/2025
Objection resolved — Addressed
10/28/2025
Objection resolved — Addressed
10/28/2025
Objection resolved — Addressed
10/27/2025
Objection raised — Cost
10/27/2025
Objection raised — Plumbing
10/27/2025
Objection raised — Scope
10/27/2025
Objection raised — Plumbing
10/22/2025
Filed — Alteration CO
Filing Mechanical drawings subsequent to primary job number B01109818-I1
B01109818-P4
09/16/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/09/2025
Permit issued — General Construction
B01109818-I1-GC
08/01/2025
Permit issued — Construction Fence
B01109818-S5-FN
07/25/2025
Objection resolved — Addressed
07/25/2025
Objection resolved — Addressed
07/25/2025
Objection resolved — Addressed
07/25/2025
Objection resolved — Addressed
07/24/2025
Objection raised — Zoning
07/24/2025
Objection raised — Structural
07/24/2025
Objection raised — Admin
07/24/2025
Objection raised — Admin
07/22/2025
Filed — Alteration CO
Filing Mechanical drawings subsequent to primary job number B01109818-I1
B01109818-S5
07/15/2025
Permit issued — Structural
B01109818-S4-ST
07/09/2025
Special inspection requirement — Final
Shahrish Shuvo
07/09/2025
Special inspection requirement — Concrete - Cast-In-Place
Shahrish Shuvo
07/09/2025
Special inspection requirement — Masonry
Shahrish Shuvo
07/09/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Shahrish Shuvo
Latest 60 of 100 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BUILDERS GROUP USA303/22/2026
594 MILLER HOLDINGS LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/03/2025$750K—— → —$312/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ADB ASSOCIATES811/13/2025
CHUN ENGINEERING CONSULTANT PLLC205/30/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYC DESIGN FILE1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BUILDERS GROUP USA INCGeneral Contractor507/08/2026
B&B MECH PLBG & HTG LLCPlumbing207/08/2026
POWER DIRECT ELECTRIC INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616711/13/2025
SHAHRISH SHUVO ENGINEERIN8524205/30/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedBUILDERS GROUP USA09/09/2025
DOB NOWConstruction FenceSigned-offBUILDERS GROUP USA08/01/2025
DOB NOWStructuralSigned-offBUILDERS GROUP USA07/15/2025
DOB NOWPlumbingSigned-offTARGET PIPING NY LLC03/05/2025
DOB NOWSprinklersSigned-offTARGET PIPING NY LLC03/05/2025
DOB NOWMechanical SystemsSigned-offBUILDERS GROUP USA03/03/2025
DOB NOWGeneral ConstructionPermit IssuedBUILDERS GROUP USA02/27/2025
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
12/16/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/16/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
12/16/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/11/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/01/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/18/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/03/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/16/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/01/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 51
DateRequirementInspectorRole
11/12/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
11/12/2025Permanent certificateFAHAD FATEHenergy_progress
11/12/2025HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
11/12/2025HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
11/12/2025HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
11/12/2025Maintenance informationFAHAD FATEHenergy_progress
11/12/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
11/07/2025HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
11/07/2025HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
11/07/2025HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
11/07/2025Ventilation and air distribution systemFAHAD FATEHenergy_progress
11/07/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
11/07/2025Heating SystemsFAHAD FATEHspecial
11/07/2025Mechanical SystemsFAHAD FATEHspecial
11/07/2025Post-installed AnchorsFAHAD FATEHspecial
11/07/2025FinalFAHAD FATEHprogress
11/07/2025Fire-Resistance Rated ConstructionFAHAD FATEHprogress
11/07/2025Permanent certificateFAHAD FATEHenergy_progress
11/07/2025Maintenance informationFAHAD FATEHenergy_progress
07/09/2025FinalShahrish Shuvoprogress
07/09/2025Concrete - Cast-In-PlaceShahrish Shuvospecial
07/09/2025MasonryShahrish Shuvospecial
07/09/2025Structural Stability – Alterations of existing buildingsShahrish Shuvospecial
07/09/2025Fire-Resistant Penetrations and JointsShahrish Shuvospecial
07/09/2025Raising and Moving of a BuildingShahrish Shuvospecial
Latest 25 of 51.
▾Documents — 50 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/21/2026B01109818-P1Request digital key ↗
08/21/2026B01109818-S4Request digital key ↗
08/21/2026B01109818-S2Request digital key ↗
Showing 3 of 10 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026B01109818-I1Open ↗
08/13/2026B01109818-P1Open ↗
▸Seals & Professional Certifications25
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/21/2026B01109818-P1Open ↗
08/21/2026B01109818-S4Open ↗
08/21/2026B01109818-S3Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/02/2026B01109818-P2Open ↗
09/01/2026B01109818-P5Open ↗
09/01/2026B01109818-P5Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/23/2026B01109818-S3Open ↗
09/02/2026B01109818-P2Open ↗
09/01/2026B01109818-P5Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/21/2026B01109818-S4Open ↗
08/21/2026B01109818-S3Open ↗
08/21/2026B01109818-S2Open ↗
Showing 3 of 10 on file for this type
▸Other Documents3
▸DOB NOWProperty Ownership Certification2
08/21/2026B01109818-P1Open ↗
08/21/2026B01109818-I1Open ↗
▸DOB NOWFinal Survey1
08/21/2026B01109818-I1Open ↗