← Back
Miscellaneous religious facility
590 LIVONIA AVENUE
BROOKLYN · BIN 3085024
💬 Discuss this project
1930Year Built
2Stories
M9Building Class
R7AZoning
7,313 sfGross Floor Area
1Units
1 Open Violation ▸FDNY Report ↗
Miscellaneous religious facility · Owner of record: 590 LIVONIA LLC · 4,875 sf lot · 1.5 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ICHB LLC103/22/2026
MELAMED CONSTRUCTION103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SKYPEAK LLC211/20/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
INSHA BUILDING CONSULTANTS403/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BUILDTECH ENGINEERING6369111/20/2025
Building Lifecycle
All (16)Filed (2)Violation (2)Objection (10)Special Inspection (2)
12/17/2025
Objection resolved — Resolved
12/16/2025
Objection raised — Cost
11/26/2025
Objection resolved — Addressed
11/26/2025
Objection resolved — Addressed
11/20/2025
Filed — Alteration
FILING STRUCTURAL WORK TYPE TO SHOW THE REMOVAL OF THE I BEAM, AND THE METAL STAIRS USED FOR MEZZANINE LEVEL INSIDE 1ST FL COMMERCIAL SPACE. WORK AS PER PLANS IN CONJUNCTION WITH GC DEMOLITION APPLICATION# B01192926-I1.
B01192926-S1
11/20/2025
Special inspection requirement — Structural Steel - Details
Luis Pichardo
10/28/2025
Special inspection requirement — Final
RONALD VILLANO
10/13/2025
Objection resolved — Addressed
10/13/2025
Objection resolved — Addressed
08/28/2025
Objection raised — Scope
08/28/2025
Objection raised — Scope
08/28/2025
Objection raised — Scope
08/28/2025
Objection raised — Scope
08/19/2025
Filed — Alteration
FILING STRUCTURAL WORK TYPE TO SHOW THE REMOVAL OF THE I BEAM, AND THE METAL STAIRS USED FOR MEZZANINE LEVEL INSIDE 1ST FL COMMERCIAL SPACE. WORK AS PER PLANS IN CONJUNCTION WITH GC DEMOLITION APPLICATION# B01192926-I1.
B01192926-I1
09/16/2024
Violation issued (ECB, open)
Construction
01/13/1998
Violation issued (ECB, closed)
Construction
Nothing on file for this building.
1 project · most recent 11/20/2025
Steel
FiledStatusContractorScope
11/20/2025——Steel
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
11/20/2025Structural Steel - DetailsLuis Pichardospecial
10/28/2025FinalRONALD VILLANOprogress
▾Documents — 11 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/20/2026B01192926-S1Request digital key ↗
08/20/2026B01192926-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/20/2026B01192926-S1Open ↗
08/20/2026B01192926-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/28/2026B01192926-S1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/28/2026B01192926-S1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/20/2026B01192926-S1Open ↗
08/20/2026B01192926-I1Open ↗
▸DOB NOWOER: Notice to Proceed2
08/13/2026B01192926-I1Open ↗
08/13/2026B01192926-S1Open ↗
▸DOB NOWOER: Notice of Satisfaction1
08/13/2026B01192926-S1Open ↗