← Back
Other miscellaneous
434 RIVERDALE AVENUE
BROOKLYN · BIN 3085343
💬 Discuss this project
0Year Built
—Stories
Z9Building Class
M1-1Zoning
0 sfGross Floor Area
1Units
2 Open Violations 1 unresolved · 1 paperwork only ▸FDNY Report ↗
Other miscellaneous · Owner of record: 434 RIVERDALE AVE LLC · 9,000 sf lot · 0 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
434 RIVERDALE AVENUE2604/09/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FOCUS STRUCTURAL ENGINEERING302/26/2026
TOMONORI TSUJITA ARCHITECT PLLC412/02/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MICROGRID NETWORKS1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
VERDE ELECTRIC CORPGeneral Contractor504/09/2026
CORZO, GENAROElectrical103/21/2026
KNOTT, MELVINElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JAJ ENGINEERING PLLC930402/26/2026
Building Lifecycle
All (50)Filed (7)Permit Issued (5)Violation (2)Objection (6)Special Inspection (30)
03/12/2026
Special inspection requirement — Subgrade Inspections
Joseph Jabour
03/12/2026
Special inspection requirement — Footing and Foundation
Joseph Jabour
03/12/2026
Special inspection requirement — Final
Joseph Jabour
03/12/2026
Special inspection requirement — Preliminary
Joseph Jabour
03/12/2026
Special inspection requirement — Post-installed Anchors
Joseph Jabour
03/12/2026
Special inspection requirement — Structural Steel - High Strength Bolting
Joseph Jabour
03/12/2026
Special inspection requirement — Helical Piles Foundation (BB # 2014-020)
03/12/2026
Special inspection requirement — Underpinning
Joseph Jabour
03/12/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
Joseph Jabour
03/12/2026
Special inspection requirement — Masonry
Joseph Jabour
03/12/2026
Special inspection requirement — Structural Steel - Details
Joseph Jabour
03/12/2026
Special inspection requirement — Structural Steel - Welding
Joseph Jabour
03/12/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Joseph Jabour
03/12/2026
Special inspection requirement — Concrete - Cast-In-Place
Joseph Jabour
02/26/2026
Filed — Alteration
STRUCTURAL WORK as per plans filed herewith. Concrete supports for energy storage system and structural steel framing system for NFPA 15. no change in use, egress or occupancy
B01013074-P2
02/13/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
Joseph Jabour
02/13/2026
Special inspection requirement — Concrete - Cast-In-Place
Joseph Jabour
02/13/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Joseph Jabour
02/13/2026
Special inspection requirement — Masonry
Joseph Jabour
02/13/2026
Special inspection requirement — Post-installed Anchors
Joseph Jabour
02/13/2026
Special inspection requirement — Structural Steel - Details
Joseph Jabour
02/13/2026
Special inspection requirement — Structural Steel - High Strength Bolting
Joseph Jabour
02/13/2026
Special inspection requirement — Structural Steel - Welding
Joseph Jabour
02/13/2026
Special inspection requirement — Subgrade Inspections
Joseph Jabour
02/13/2026
Special inspection requirement — Underpinning
Joseph Jabour
02/13/2026
Special inspection requirement — Helical Piles Foundation (BB # 2014-020)
02/13/2026
Special inspection requirement — Final
Joseph Jabour
02/13/2026
Special inspection requirement — Footing and Foundation
Joseph Jabour
02/13/2026
Special inspection requirement — Preliminary
Joseph Jabour
02/06/2026
Permit issued — Earth Work
B01013074-I1-GC
12/29/2025
Permit issued — General Construction
B01013074-I1-GC
12/29/2025
Permit issued — Earth Work
B01013074-I1-ST
12/29/2025
Permit issued — Earth Work
B01013074-I1-EA
12/29/2025
Permit issued — General Construction
B01013074-I1-FO
12/11/2025
Special inspection requirement — Metering
12/11/2025
Special inspection requirement — Interior lighting power
12/02/2025
Filed — Alteration
INSTALLATION OF NEW ELECTRICAL VAULT(MANHOLE). NO CHANGE IN USE, EGRESS OR OCCUPANCY
B00981085-P2
04/24/2025
Filed — Alteration
INSTALLATION OF NEW ELECTRICAL VAULT(MANHOLE). NO CHANGE IN USE, EGRESS OR OCCUPANCY
B00981085-P1
01/20/2025
Filed — Alteration
B01136353-I1
06/07/2024
Objection resolved — Addressed
05/17/2024
Objection resolved — Addressed
04/29/2024
Objection raised — Other
04/29/2024
Objection raised — Other
04/29/2024
Objection raised — Other
04/29/2024
Objection raised — Other
04/25/2024
Filed — Alteration
INSTALLATION OF NEW ELECTRICAL VAULT(MANHOLE). NO CHANGE IN USE, EGRESS OR OCCUPANCY
B00981085-S1
04/10/2024
Filed — Alteration
INSTALLATION OF NEW ELECTRICAL VAULT(MANHOLE). NO CHANGE IN USE, EGRESS OR OCCUPANCY
B00981085-I1
03/29/2024
Filed — Alteration
STRUCTURAL WORK as per plans filed herewith. Concrete supports for energy storage system and structural steel framing system for NFPA 15. no change in use, egress or occupancy
B01013074-I1
03/15/2010
Violation issued (ECB, open)
Construction
11/05/1990
Violation issued (DOB, open)
VP-VIOLATION UNSERVED ECB-ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWEarth WorkPermit IssuedVERDE ELECTRIC CORP02/06/2026
DOB NOWGeneral ConstructionPermit IssuedVERDE ELECTRIC CORP12/29/2025
DOB NOWEarth WorkPermit IssuedVERDE ELECTRIC CORP12/29/2025
DOB NOWEarth WorkPermit IssuedVERDE ELECTRIC CORP12/29/2025
DOB NOWGeneral ConstructionPermit IssuedVERDE ELECTRIC CORP12/29/2025
BIS—ISSUEDTOMONORI TSUJITA ARCHITECT PLLC09/19/2024
2 projects · most recent 02/26/2026
Steel Concrete Masonry
FiledStatusContractorScope
02/26/2026Permit IssuedVERDE ELECTRIC CORPSteel, Concrete, Masonry
12/02/2025——3 scope_items
▾Special Inspection Requirements (DOB NOW) — 45
DateRequirementInspectorRole
03/12/2026Subgrade InspectionsJoseph Jabourspecial
03/12/2026Footing and FoundationJoseph Jabourprogress
03/12/2026FinalJoseph Jabourprogress
03/12/2026PreliminaryJoseph Jabourprogress
03/12/2026Post-installed AnchorsJoseph Jabourspecial
03/12/2026Structural Steel - High Strength BoltingJoseph Jabourspecial
03/12/2026Helical Piles Foundation (BB # 2014-020)—special
03/12/2026UnderpinningJoseph Jabourspecial
03/12/2026Subsurface Conditions – Fill Placement & In-Place DensityJoseph Jabourspecial
03/12/2026MasonryJoseph Jabourspecial
03/12/2026Structural Steel - DetailsJoseph Jabourspecial
03/12/2026Structural Steel - WeldingJoseph Jabourspecial
03/12/2026Excavations - Sheeting, Shoring, and BracingJoseph Jabourspecial
03/12/2026Concrete - Cast-In-PlaceJoseph Jabourspecial
02/13/2026Subsurface Conditions – Fill Placement & In-Place DensityJoseph Jabourspecial
02/13/2026Concrete - Cast-In-PlaceJoseph Jabourspecial
02/13/2026Excavations - Sheeting, Shoring, and BracingJoseph Jabourspecial
02/13/2026MasonryJoseph Jabourspecial
02/13/2026Post-installed AnchorsJoseph Jabourspecial
02/13/2026Structural Steel - DetailsJoseph Jabourspecial
02/13/2026Structural Steel - High Strength BoltingJoseph Jabourspecial
02/13/2026Structural Steel - WeldingJoseph Jabourspecial
02/13/2026Subgrade InspectionsJoseph Jabourspecial
02/13/2026UnderpinningJoseph Jabourspecial
02/13/2026Helical Piles Foundation (BB # 2014-020)—special
Latest 25 of 45.
▾Documents — 45 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/23/2026B01136353-I1Request digital key ↗
08/19/2026B00981085-I1Request digital key ↗
08/19/2026B00981085-S1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION3
02/14/2025340913569Open ↗
07/26/2024322117062Open ↗
07/24/2024322117062Open ↗
▸BISWORK PERMIT APPLICATION1
09/19/2024322117062Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
02/28/2025340913569Open ↗
▸Seals & Professional Certifications17
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/23/2026B01136353-I1Open ↗
08/19/2026B00981085-I1Open ↗
08/19/2026B00981085-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/14/2026B00981085-S1Open ↗
08/31/2026B01136353-I1Open ↗
08/24/2026B01013074-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/14/2026B00981085-S1Open ↗
08/31/2026B01136353-I1Open ↗
08/24/2026B01013074-P2Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
02/14/2025340913569Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
02/14/2025340913569Open ↗
▸Safety & Tenant Protection1
▸BISBPP: STREET TREES SITE PLAN1
02/14/2025340913569Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/23/2026B01136353-I1Open ↗
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/13/2026B01013074-I1Open ↗
08/13/2026B01013074-P2Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
02/14/2025340913569Open ↗
▸Approvals, Objections & Sign-offs4
▸BISSCHEDULE A - OCCUPANCY / USE2
07/26/2024322117062Open ↗
07/24/2024322117062Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
02/25/2025340913569Open ↗
▸DOB NOWOTCR Letter of Conditional Acceptance1
08/13/2026B00981085-I1Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT ESTIMATE: (PW3)1
09/09/2024322117062Open ↗
▸Filing & Intake Forms3
▸BISADDITIONAL INFORMATION2
02/25/2025340913569Open ↗
09/09/2024322117062Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
02/14/2025340913569Open ↗
▸Other Documents3
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
02/14/2025340913569Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
02/25/2025340913569Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B01013074-I1Open ↗