← Back
Walk-up apt, over six families with stores
213 JAMAICA AVENUE
BROOKLYN · BIN 3086382
💬 Discuss this project
1903Year Built
5Stories
C7Building Class
R4Zoning
17,010 sfGross Floor Area
19Units
Rent Stabilized49 Open Violations 48 unresolved · 1 paperwork only ▸FDNY Report ↗
Walk-up apt, over six families with stores · Owner of record: CYPRESS COURT ASSOCIATES L.P. · 4,525 sf lot · 3.76 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof4p · 1 filing · 16 docs
Bulkhead2p · 1 filing · 16 docs
Cellar6p · 1 filing · 16 docs
1 job · most recent 03/03/2025
Gas Water/Sanitary
FiledStatusContractorScope
03/03/2025——Gas, Water/Sanitary
Building Lifecycle
All (118)Filed (5)Violation (60)Objection (29)Special Inspection (24)
05/05/2026
Violation issued (HPD, closed)
A
04/23/2026
Violation issued (ECB, open)
Construction
04/14/2026
Violation issued (HPD, open)
B
04/14/2026
Violation issued (HPD, open)
C
04/14/2026
Violation issued (HPD, closed)
A
04/14/2026
Violation issued (HPD, open)
C
04/14/2026
Violation issued (HPD, open)
B
04/02/2026
Objection resolved — Resolved
03/31/2026
Violation issued (HPD, open)
C
03/31/2026
Violation issued (HPD, open)
B
03/31/2026
Violation issued (HPD, open)
A
03/12/2026
Violation issued (HPD, open)
A
03/12/2026
Violation issued (HPD, open)
A
03/12/2026
Violation issued (HPD, open)
A
03/12/2026
Violation issued (HPD, open)
B
03/12/2026
Violation issued (HPD, open)
B
03/12/2026
Violation issued (HPD, open)
A
03/12/2026
Violation issued (HPD, closed)
C
03/12/2026
Violation issued (HPD, open)
A
01/29/2026
Objection raised — Admin
01/29/2026
Objection resolved — Addressed
01/14/2026
Objection resolved — Addressed
01/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
01/13/2026
Objection resolved — Addressed
11/12/2025
Objection raised — Other
11/12/2025
Objection resolved — Addressed
10/02/2025
Objection resolved — Addressed
06/10/2025
Violation issued (HPD, closed)
A
03/20/2025
Special inspection requirement — Post-installed Anchors
03/11/2025
Objection raised — Fire_Protection
03/11/2025
Objection raised — Plumbing
03/03/2025
Filed — Alteration
INSTALL NEW BOILER FOR DOMESTIC HOT WATER WITH NEW RADIATORS, CONTROLS, ACCESSORIES & EXHAUST GRILLES & FANS AS PER PLANS FILED.
B01135242-S2
02/19/2025
Objection raised — Other
02/19/2025
Objection raised — Mechanical
02/19/2025
Objection raised — Fire_Protection
02/12/2025
Filed — Alteration
INSTALL NEW BOILER FOR DOMESTIC HOT WATER WITH NEW RADIATORS, CONTROLS, ACCESSORIES & EXHAUST GRILLES & FANS AS PER PLANS FILED.
B01135242-S3
01/21/2025
Objection raised — Other
01/21/2025
Objection resolved — Addressed
01/21/2025
Objection raised — Scope
01/21/2025
Objection resolved — Addressed
01/21/2025
Objection raised — Structural
01/21/2025
Objection resolved — Addressed
01/21/2025
Objection raised — Energy
01/21/2025
Objection resolved — Addressed
01/21/2025
Objection raised — Scope
01/21/2025
Objection resolved — Addressed
01/21/2025
Objection raised — Mechanical
01/21/2025
Objection resolved — Addressed
01/21/2025
Objection raised — Structural
01/21/2025
Objection resolved — Addressed
01/21/2025
Objection raised — Inspections
01/21/2025
Objection resolved — Addressed
01/16/2025
Filed — Alteration
INSTALL THREE NEW BOILERS, PUMPS, FLUES AND ASSOCIATED PIPING AND EQUIPMENT AND REMOVE 1 EXISTING BOILER AS PER PLANS FILED.
B01165574-I1
01/10/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
01/10/2025
Special inspection requirement — HVAC-R and service water heating system controls
01/10/2025
Special inspection requirement — Maintenance information
01/10/2025
Special inspection requirement — Heating Systems
01/10/2025
Special inspection requirement — Tenant Protection Plan Compliance
01/10/2025
Special inspection requirement — HVAC-R and service water heating equipment
12/17/2024
Special inspection requirement — HVAC-R and service water heating equipment
Latest 60 of 118 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CYPRESS COURT ASSOCIATES LP303/22/2026
CYPRESS WEST HDFC203/22/2026
THE OWNER OF103/22/2026
PITKIN-BERRIMAN HDFC503/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LORING CONSULTING ENGINEERS, INC.303/03/2025
ESKW/A212/03/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BETRO DESIGN GROUP503/21/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISEQISSUEDS & Z CONST CORP04/15/1999
BIS—ISSUEDS7Z CONSTRUCTION CORP.04/15/1999
BISEQISSUEDS & Z CONST CORP11/19/1998
BISPLISSUEDMASTER MECHANICAL PLUMB & HETG10/19/1998
BIS—ISSUEDS7Z CONSTRUCTION CORP.07/30/1998
BISBLISSUEDAGEE HEATING SVC CORP12/20/1996
BISOTISSUEDLILLY CONSTRUCTION CO. INC.08/19/1996
BISEQISSUEDSIDIG CONSTRUCTION CORPORATION03/24/1995
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
01/14/2026Fire-Resistant Penetrations and Joints—special
03/20/2025Post-installed Anchors—special
01/10/2025HVAC-R and service water piping design and insulation—energy_progress
01/10/2025HVAC-R and service water heating system controls—energy_progress
01/10/2025Maintenance information—energy_progress
01/10/2025Heating Systems—special
01/10/2025Tenant Protection Plan Compliance—special
01/10/2025HVAC-R and service water heating equipment—energy_progress
12/17/2024HVAC-R and service water heating equipment—energy_progress
12/17/2024HVAC-R and service water piping design and insulation—energy_progress
12/17/2024Shutoff dampers—energy_progress
12/17/2024Tenant Protection Plan Compliance—special
12/17/2024Heating Systems—special
12/17/2024Mechanical Systems—special
12/17/2024Tenant Protection Plan Compliance—special
12/17/2024Energy Code Compliance Inspections—progress
12/17/2024Final—progress
12/17/2024HVAC-R and service water heating system controls—energy_progress
12/17/2024Maintenance information—energy_progress
11/13/2024Structural Stability – Alterations of existing buildings—special
11/13/2024Masonry—special
11/13/2024Structural Steel - Details—special
11/13/2024Tenant Protection Plan Compliance—special
11/13/2024Final—progress
▾Documents — 16 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/23/2026B01135242-S1Request digital key ↗
08/23/2026B01135242-I1Request digital key ↗
08/23/2026B01165574-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/23/2026B01135242-S1Open ↗
08/23/2026B01135242-I1Open ↗
08/23/2026B01135242-S3Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs5
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter5
08/13/2026B01165574-I1Open ↗
08/13/2026B01135242-S2Open ↗
08/13/2026B01135242-S1Open ↗
Showing 3 of 5 on file for this type
▸Other Documents1
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B01135242-I1Open ↗