← Back
Over six families without stores
2801 FULTON STREET
BROOKLYN · BIN 3087495
💬 Discuss this project
1930Year Built
4Stories
C1Building Class
R6AZoning
12,950 sfGross Floor Area
16Units
Rent Stabilized34 Open Violations ▸FDNY Report ↗
Over six families without stores · 4,100 sf lot · 3.16 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof4p · 1 filing · 17 docs
Bulkhead1p · 1 filing · 17 docs
Cellar6p · 1 filing · 17 docs
1 job · most recent 03/03/2025
Gas Water/Sanitary
FiledStatusContractorScope
03/03/2025——Gas, Water/Sanitary
1 job · most recent 03/03/2025
Masonry
FiledStatusContractorScope
03/03/2025——Masonry
Building Lifecycle
All (121)Filed (5)Violation (60)Objection (28)Special Inspection (28)
05/04/2026
Violation issued (HPD, closed)
A
03/12/2026
Violation issued (HPD, closed)
B
03/12/2026
Violation issued (HPD, closed)
B
03/12/2026
Violation issued (HPD, closed)
B
03/12/2026
Violation issued (HPD, open)
A
03/12/2026
Violation issued (HPD, closed)
C
03/12/2026
Violation issued (HPD, open)
A
03/12/2026
Violation issued (HPD, closed)
C
03/12/2026
Violation issued (HPD, open)
A
03/12/2026
Violation issued (HPD, closed)
B
03/12/2026
Violation issued (HPD, closed)
B
02/19/2026
Violation issued (FDNY_NOV, closed)
02/08/2026
Violation issued (HPD, open)
B
02/08/2026
Violation issued (HPD, closed)
B
02/08/2026
Violation issued (HPD, closed)
C
02/08/2026
Violation issued (HPD, closed)
B
02/08/2026
Violation issued (HPD, open)
B
02/08/2026
Violation issued (HPD, open)
A
02/08/2026
Violation issued (HPD, closed)
B
01/28/2026
Objection resolved — Addressed
01/20/2026
Objection resolved — Addressed
12/01/2025
Violation issued (ECB, open)
Construction
11/22/2025
Violation issued (HPD, open)
C
10/28/2025
Objection resolved — Addressed
10/28/2025
Objection resolved — Addressed
10/28/2025
Objection resolved — Addressed
06/09/2025
Violation issued (HPD, closed)
A
06/02/2025
Objection resolved — Addressed
04/24/2025
Objection resolved — Addressed
04/08/2025
Objection resolved — Addressed
03/29/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
03/28/2025
Objection resolved — Addressed
03/12/2025
Objection resolved — Addressed
03/12/2025
Objection resolved — Addressed
03/12/2025
Objection resolved — Addressed
03/12/2025
Objection resolved — Addressed
03/12/2025
Objection resolved — Addressed
03/05/2025
Objection raised — Other
03/05/2025
Objection raised — Other
03/03/2025
Filed — Alteration
REMOVED AND REPLACED EXISTING HOT WATER HEATER AND STORAGE TANK AND INSTALL NEW DIRECT HOT WATER HEATER AS PER PLANS FILED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01124836-S2
03/03/2025
Filed — Alteration
REMOVED AND REPLACED EXISTING HOT WATER HEATER AND STORAGE TANK AND INSTALL NEW DIRECT HOT WATER HEATER AS PER PLANS FILED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01124836-S3
02/10/2025
Objection raised — Fire_Protection
02/10/2025
Objection raised — Energy
02/10/2025
Objection raised — Structural
02/10/2025
Objection raised — Accessibility
02/10/2025
Objection raised — Structural
02/03/2025
Filed — Alteration
INSTALL THREE NEW BOILERS, PUMPS, FLUES AND ASSOCIATED PIPING AND EQUIPMENT AND REMOVE 2 EXISTING BOILERS AS PER PLANS FILED.
B01165529-I1
01/10/2025
Special inspection requirement — HVAC-R and service water heating system controls
01/10/2025
Special inspection requirement — HVAC-R and service water heating equipment
01/10/2025
Special inspection requirement — Maintenance information
01/10/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
01/10/2025
Special inspection requirement — Tenant Protection Plan Compliance
01/10/2025
Special inspection requirement — Heating Systems
12/04/2024
Objection raised — Structural
12/04/2024
Objection raised — Structural
12/04/2024
Objection raised — Structural
12/04/2024
Objection raised — Admin
12/04/2024
Objection raised — Structural
12/04/2024
Objection raised — Admin
12/04/2024
Objection raised — Structural
Latest 60 of 121 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CYPRESS CONRERS LP103/22/2026
NYC DEPARTMENT OF HPD903/21/2026
NYCDDC103/21/2026
PITKIN-BERRIMAN HDFC503/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LORING CONSULTING ENGINEERS, INC.303/03/2025
OLD STRUCTURES ENGINEERING112/03/2024
ESKW/A111/06/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BETRO DESIGN GROUP503/21/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BIS—ISSUEDERIN CONSTRUCTION & DEVELOPMENT04/04/2007
BISPLISSUEDAMOK INC03/30/2006
BIS—ISSUEDERIN CONSTRUCTION & DEVELOPMENT03/07/2006
BISEQISSUEDROCKLEDGE SCAFFOLD CORP01/25/2006
BIS—ISSUEDERIN CONSTRUCTION & DEVELOPMENT03/29/2005
BISFSISSUEDGLASS ARMOR OF NEW YORK I12/21/2001
BISOTISSUEDD & N CONST08/10/1998
BISEQISSUEDD & N CONST08/10/1998
BISEQISSUEDSURMART RESTORATION CORP09/30/1994
BISOTISSUEDAPEC CORP11/14/1991
BISPLISSUEDAPEC CORP11/14/1991
BISPLISSUEDST MARKS PLBG CO04/15/1991
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
03/29/2025Structural Stability – Alterations of existing buildings—special
01/10/2025HVAC-R and service water heating system controls—energy_progress
01/10/2025HVAC-R and service water heating equipment—energy_progress
01/10/2025Maintenance information—energy_progress
01/10/2025HVAC-R and service water piping design and insulation—energy_progress
01/10/2025Tenant Protection Plan Compliance—special
01/10/2025Heating Systems—special
12/02/2024Tenant Protection Plan Compliance—special
12/02/2024Mechanical Systems—special
12/02/2024Heating Systems—special
12/02/2024Final—progress
12/02/2024Energy Code Compliance Inspections—progress
12/02/2024HVAC-R and service water heating equipment—energy_progress
12/02/2024Maintenance information—energy_progress
12/02/2024HVAC-R and service water piping design and insulation—energy_progress
12/02/2024HVAC-R and service water heating system controls—energy_progress
12/02/2024Shutoff dampers—energy_progress
11/11/2024Final—progress
11/11/2024Masonry—special
11/11/2024Tenant Protection Plan Compliance—special
10/09/2024Energy Code Compliance Inspections—progress
10/09/2024Final—progress
10/09/2024Fire-Resistant Penetrations and Joints—special
10/09/2024Tenant Protection Plan Compliance—special
10/09/2024Fenestration air leakage—energy_progress
Latest 25 of 28.
▾Documents — 22 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/23/2026B01124836-S3Request digital key ↗
08/23/2026B01124836-I1Request digital key ↗
08/23/2026B01124836-S1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/13/2026B01124836-S1Open ↗
08/13/2026B01124836-I1Open ↗
08/13/2026B01124836-S2Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/13/2026B01165529-I1Open ↗
08/13/2026B01124836-S2Open ↗
08/13/2026B01124836-S3Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B01165529-I1Open ↗
▸Approvals, Objections & Sign-offs5
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter5
08/13/2026B01124836-I1Open ↗
08/13/2026B01124836-S3Open ↗
08/13/2026B01124836-S2Open ↗
Showing 3 of 5 on file for this type
▸Other Documents1
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B01124836-I1Open ↗