← Back
Primarily 4 family with 1 store or office
3106 FULTON STREET
BROOKLYN · BIN 3088187
💬 Discuss this project
1920Year Built
3Stories
S4Building Class
R6BZoning
4,500 sfGross Floor Area
5Units
Rent Stabilized13 Open Violations 12 unresolved · 1 paperwork only ▸
Primarily 4 family with 1 store or office · 1,790 sf lot · 2.51 FAR built · Flood zone X
Locations of Work
ArchitectureElectrical
Cellar3p · 1 filing · 6 docs
Basement1p · 1 filing · 6 docs
1 job · most recent 06/17/2026
Masonry Wood
FiledStatusContractorScope
06/17/2026——Masonry, Wood
1 job · most recent 06/17/2026
Fence
FiledStatusContractorScope
06/17/2026——Fence
Building Lifecycle
All (62)Filed (2)Violation (35)Objection (16)Special Inspection (9)
08/18/2026
Objection resolved — Resolved
08/18/2026
Objection resolved — Resolved
07/20/2026
Objection resolved — Resolved
07/20/2026
Objection resolved — Resolved
07/20/2026
Objection resolved — Resolved
07/17/2026
Objection raised — Scope
07/17/2026
Objection raised — Scope
07/17/2026
Objection raised — Scope
07/17/2026
Objection raised — Scope
07/17/2026
Objection raised — Inspections
07/17/2026
Objection raised — Scope
07/17/2026
Objection raised — Scope
07/17/2026
Objection resolved — Resolved
07/16/2026
Objection raised — Scope
07/16/2026
Objection raised — Scope
07/16/2026
Objection raised — Scope
06/17/2026
Filed — Alteration
Emergency installation of temporary CONSTRUCTION FENCE per DOB IED dated 05/21/2026 due to partial collapse of the rear one-story roof section. No change in use, egress, or occupancy.
B01407607-I1
06/17/2026
Filed — Alteration
Emergency installation of temporary CONSTRUCTION FENCE per DOB IED dated 05/21/2026 due to partial collapse of the rear one-story roof section. No change in use, egress, or occupancy.
B01407607-S1
06/16/2026
Special inspection requirement — Energy Code Compliance Inspections
06/16/2026
Special inspection requirement — Structural Wood Frame
06/10/2026
Special inspection requirement — Tenant Protection Plan Compliance
06/10/2026
Special inspection requirement — Wood – Seismic Resistance
06/08/2026
Violation issued (ECB, open)
Construction
06/08/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
06/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/08/2026
Special inspection requirement — Masonry
05/27/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/26/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
05/26/2026
Special inspection requirement — Final
05/21/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/21/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/21/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/21/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/20/2026
Violation issued (ECB, open)
Construction
05/04/2026
Violation issued (HPD, open)
A
06/09/2025
Violation issued (HPD, open)
A
11/26/2024
Violation issued (HPD, closed)
I
04/10/2024
Violation issued (HPD, open)
A
03/23/2023
Violation issued (HPD, open)
A
11/07/2022
Violation issued (HPD, closed)
I
02/24/2022
Violation issued (HPD, open)
A
04/09/2021
Violation issued (HPD, open)
A
10/30/2019
Violation issued (HPD, closed)
I
11/22/2017
Violation issued (HPD, closed)
I
11/09/2016
Violation issued (HPD, closed)
I
09/24/2012
Violation issued (ECB, closed)
Plumbing
07/15/1993
Violation issued (HPD, closed)
C
07/15/1993
Violation issued (HPD, closed)
B
07/15/1993
Violation issued (HPD, closed)
C
07/15/1993
Violation issued (HPD, closed)
C
10/18/1983
Violation issued (HPD, closed)
B
10/18/1983
Violation issued (HPD, closed)
B
10/18/1983
Violation issued (HPD, closed)
B
10/18/1983
Violation issued (HPD, closed)
B
10/18/1983
Violation issued (HPD, closed)
B
10/18/1983
Violation issued (HPD, closed)
B
10/18/1983
Violation issued (HPD, closed)
B
10/18/1983
Violation issued (HPD, closed)
C
10/05/1982
Violation issued (HPD, closed)
B
10/05/1982
Violation issued (HPD, closed)
B
Latest 60 of 62 events.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RLD3 ENGINEERING PLLC206/17/2026
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
06/16/2026Energy Code Compliance Inspections—progress
06/16/2026Structural Wood Frame—progress
06/10/2026Tenant Protection Plan Compliance—special
06/10/2026Wood – Seismic Resistance—special
06/08/2026Exterior Insulation and Finish Systems (EIFS)—special
06/08/2026Fire-Resistant Penetrations and Joints—special
06/08/2026Masonry—special
05/26/2026Structural Stability – Alterations of existing buildings—special
05/26/2026Final—progress
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/16/2026B01407607-S1Request digital key ↗
08/15/2026B01407607-I1Request digital key ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/16/2026B01407607-S1Open ↗
08/16/2026B01407607-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/15/2026B01407607-I1Open ↗
▸Other Documents1
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/15/2026B01407607-I1Open ↗