← Back
Cemetery
775 JAMAICA AVENUE
BROOKLYN · BIN 3090739
💬 Discuss this project
1965Year Built
2Stories
Z8Building Class
R3-2Zoning
4,500 sfGross Floor Area
0Units
1 Open Violation ▸FDNY Report ↗
Cemetery · 1,500,000 sf lot · 0 FAR built · Flood zone X
Locations of Work
Architecture
Floor 12p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CONGREGATION EMANU_EL OF THE CITY O1107/08/2026
THE OWNER OF 775 JAMAICA103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GEI CONSULTANTS INC. P.C.404/09/2024
ABEJA ENGINEERING PLLC204/11/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JACK JAFFA & ASSOCIATES403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PRIME PIPING & HEATING INPlumbing607/08/2026
LIONHEART CONSTRUCTION COGeneral Contractor303/21/2026
ENVIRONMENTAL APPRAISER &General Contractor203/21/2026
POSILLICO ENVIRONMENTAL IGeneral Contractor203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GEI CONSULTANTS, INC, PC1047204/09/2024
MUNICIPAL TESTING LABORAT230206/27/2023
ABEJA ENGINEERING PLLC7269204/11/2021
Building Lifecycle
All (39)Filed (6)Permit Issued (4)Signed Off (2)Violation (3)Inspection (3)Special Inspection (21)
05/08/2024
Signed off — Alteration
GENERAL CONSTRUCTION AND STRUCTURAL TYPE WORK TO SUPPORT EXISTING CONCRETE WALL, AS PER PLANS FILED HEREWITH
B01018006-I1
04/26/2024
Permit issued — General Construction
B01018006-I1-GC-CX
04/22/2024
Special inspection requirement — Concrete - Cast-In-Place
Ira Beer
04/22/2024
Special inspection requirement — Final
Ira Beer
04/09/2024
Filed — Alteration
GENERAL CONSTRUCTION AND STRUCTURAL TYPE WORK TO SUPPORT EXISTING CONCRETE WALL, AS PER PLANS FILED HEREWITH
B01018006-P1
04/03/2024
Special inspection requirement — Final
Ira Beer
04/03/2024
Special inspection requirement — Concrete - Cast-In-Place
Ira Beer
03/13/2024
Filed — Alteration
GENERAL CONSTRUCTION AND STRUCTURAL TYPE WORK TO SUPPORT EXISTING CONCRETE WALL, AS PER PLANS FILED HEREWITH
B01018006-I1
01/30/2024
Violation issued (ECB, closed)
Construction
10/10/2023
Signed off — Alteration
Replacement of Collapsed Retaining Wall, and Retaining Wall Repairs/ Bracing
B08027057-I1
06/27/2023
Filed — Alteration
Replacement of Collapsed Retaining Wall, and Retaining Wall Repairs/ Bracing
B08027057-P1
06/27/2023
Special inspection requirement — Structural Steel - High Strength Bolting
STEPHEN LATUS
06/27/2023
Special inspection requirement — Footing and Foundation
STEPHEN LATUS
06/27/2023
Special inspection requirement — Final
Ira Beer
06/27/2023
Special inspection requirement — Concrete - Cast-In-Place
STEPHEN LATUS
06/27/2023
Special inspection requirement — Structural Steel - Details
STEPHEN LATUS
06/27/2023
Special inspection requirement — Structural Steel - Welding
STEPHEN LATUS
06/26/2023
Special inspection requirement — Concrete - Cast-In-Place
STEPHEN LATUS
06/26/2023
Special inspection requirement — Footing and Foundation
STEPHEN LATUS
06/26/2023
Special inspection requirement — Structural Steel - Welding
STEPHEN LATUS
06/26/2023
Special inspection requirement — Final
Ira Beer
06/26/2023
Special inspection requirement — Structural Steel - Details
STEPHEN LATUS
06/26/2023
Special inspection requirement — Structural Steel - High Strength Bolting
STEPHEN LATUS
11/09/2022
Permit issued — Structural
B08027057-I1-GC-CX
10/27/2022
Filed — Alteration
Replacement of Collapsed Retaining Wall, and Retaining Wall Repairs/ Bracing
B08027057-I1
09/22/2021
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/15/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/18/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/11/2021
Permit issued — Plumbing
B00473879-I1-PL
05/20/2021
Permit issued — General Construction
B00473877-I1-GC
04/11/2021
Filed — Alteration
TO RENOVATE THE EXISTING BATHROOMS @ 1ST. FL. INCLUDES REPAIRING FINISHES, PAINTING WALLS AND FLOOR, WIDEN DOOR WAY, AND REPLACE LIGHTING. REPLACING PL. FIXTURES FILED UNDER JOB#B00473879.
B00473877-I1
04/11/2021
Filed — Alteration
B00473879-I1
03/22/2021
Special inspection requirement — Lighting controls
JOHANN VELEZ
02/21/2021
Special inspection requirement — Final
JOHANN VELEZ
02/21/2021
Special inspection requirement — Interior lighting power
JOHANN VELEZ
02/21/2021
Special inspection requirement — Energy Code Compliance Inspections
JOHANN VELEZ
02/21/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHANN VELEZ
02/24/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/13/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offENVIRONMENTAL APPRAISER &04/26/2024
DOB NOWStructuralSigned-offPOSILLICO ENVIRONMENTAL I11/09/2022
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN06/11/2021
DOB NOWGeneral ConstructionPermit IssuedLIONHEART CONSTRUCTION CO05/20/2021
BISFBISSUEDPACIFIC ENERGY CORP06/11/2015
BISBLISSUEDPACIFIC ENERGY CORP06/10/2015
1 project · most recent 08/17/2018
FiledStatusContractorScope
08/17/2018CompleteWILLDAN ELECTRICAL OF NY—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
09/22/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/15/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/18/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
04/22/2024Concrete - Cast-In-PlaceIra Beerspecial
04/22/2024FinalIra Beerprogress
04/03/2024FinalIra Beerprogress
04/03/2024Concrete - Cast-In-PlaceIra Beerspecial
06/27/2023Structural Steel - High Strength BoltingSTEPHEN LATUSspecial
06/27/2023Footing and FoundationSTEPHEN LATUSprogress
06/27/2023FinalIra Beerprogress
06/27/2023Concrete - Cast-In-PlaceSTEPHEN LATUSspecial
06/27/2023Structural Steel - DetailsSTEPHEN LATUSspecial
06/27/2023Structural Steel - WeldingSTEPHEN LATUSspecial
06/26/2023Concrete - Cast-In-PlaceSTEPHEN LATUSspecial
06/26/2023Footing and FoundationSTEPHEN LATUSprogress
06/26/2023Structural Steel - WeldingSTEPHEN LATUSspecial
06/26/2023FinalIra Beerprogress
06/26/2023Structural Steel - DetailsSTEPHEN LATUSspecial
06/26/2023Structural Steel - High Strength BoltingSTEPHEN LATUSspecial
03/22/2021Lighting controlsJOHANN VELEZenergy_progress
02/21/2021FinalJOHANN VELEZprogress
02/21/2021Interior lighting powerJOHANN VELEZenergy_progress
02/21/2021Energy Code Compliance InspectionsJOHANN VELEZprogress
02/21/2021Fire-Resistant Penetrations and JointsJOHANN VELEZspecial
▾Documents — 49 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch4
08/27/2026B08027057-P1Request digital key ↗
08/27/2026B08027057-I1Request digital key ↗
08/25/2026B01018006-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - General Construction1
09/01/2026B00473877-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/01/2026B00473879-I1Request digital key ↗
▸Applications & Permits3
▸BISWORK PERMIT APPLICATION2
06/12/2015321134777Open ↗
06/10/2015321134777Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
05/29/2015321134777Open ↗
▸Seals & Professional Certifications24
▸DOB NOWProgress Inspector Seal & Signature9
08/25/2026B08027057-P1Open ↗
08/25/2026B08027057-P1Open ↗
08/24/2026B01018006-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/01/2026B00473879-I1Open ↗
09/01/2026B00473877-I1Open ↗
08/27/2026B08027057-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/02/2026B01018006-P1Open ↗
08/25/2026B08027057-P1Open ↗
08/24/2026B01018006-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
12/18/2015321134777Open ↗
05/29/2015321134777Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
05/29/2015321134777Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
05/29/2015321134777Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
05/29/2015321134777Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
09/01/2026B00473879-I1Open ↗
09/01/2026B00473877-I1Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
12/18/2015321134777Open ↗
05/29/2015321134777Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
12/18/2015321134777Open ↗
▸Approvals, Objections & Sign-offs8
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter6
09/01/2026B00473879-I1Open ↗
08/25/2026B01018006-P1Open ↗
08/25/2026B01018006-I1Open ↗
Showing 3 of 6 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
12/18/2015321134777Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
12/18/2015321134777Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
05/29/2015321134777Open ↗
▸Other Documents1
▸DOB NOWAdjoining Owners Notification1
08/13/2026B08027057-I1Open ↗