DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION
DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION
DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION
DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION
DOB03/16/2020VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION
DOB01/17/2020VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
DOB01/17/2020VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
DOB10/06/2017FTM.WAREHOUSE TYPE STRUCT W/WOOD BOWSTRING TRUSS ROOF. JOB#321494744 TO RPR TRUSS WAS DISAPPROVED ON 6/23/17.NO SUBSEQUENT APPLICATION HAVE BEEN FILED W/DOB.YOU ARE ON NOTICE THAT A COLL MAY HAPPEN W/O RPRS REMEDY:RPR DWGS PREP BY LIC PE TO BE FILED W/DOB NO LATER 11/3/17.WRK UND PERM BEG BY 11/10/17.WRK BE SUBSTANT COMP&SIGN OFF BY 12/15/17
DOB07/12/2016FM.WAREHOUSE TYPE STRUCTURE W/A WOOD BOWSTRING TRUSS ROOF. WE RECEIVED AN ENGINEERING REPORT PREPARED BY OLD STRUCTURES ON 1/27/16.THE REPORT RECOMMENDS REPAIRS TO THE WOOD BOWSTRING TRUSS ROOF.REMEDY:REPAIR DWGS PREPARED BY A LIC PE ARE TO BE FILED W/THE DOB NO LATER THAN 9/12/16 WORK UNDER PERMIT TO BEGIN NO LATER THAN 9/14/16
DOB09/24/20151 STORY INDUSTRIAL BLDG W/A WOOD BOWSTRING TRUSS ROOF. REMEDY: W/IN 60 DAYS OF DATE OF VIO OWNER TO ENGAGE NYS LIC PE EXP'D W/WOOD TRUSSES TO PROBE & EVAL STRUCTUAL SOUNDNESS OF BOWSTRING USING FIELD VERIFICATION CALCULATIONS PROBES ETC & SUBMIT A REPORT ACCEPTABLE TO THE DEPT. REPR DRWGS TO BE FILED W THE DOB W/IN 45 DAYS AFTER THE INSPECTION
DOB08/01/2014FAILURE TO COMPLY WITH COMMISSIONER'S ORDER. THE BUILDING HAS A WOOD BOWSTRING TRUSS. THE OFFICE ISSUED A VIOL/COMM ORDER TO SUBMIT ENGR REPORT ON THIS BUILDING. VIOLATION WAS ISSUED 5/12/14. NO REPORT WAS RECEIVED. REMEDY: COMPLY WITH THE COMMISSIONER'S ORDER
DOB05/12/201461 CRESCENT ST.IS AN OCCP'D,1STORY,INDUSTRL BLDG/WOOD BOWSTRING TRUSS ROOF.WITHIN 60DAYS OF VIO,OWNER TO ENGAGE NYS LIC.PE EXPERNCD/WOOD TRUSS TO PROBE&EVALUATE STRUCTRL SOUNDNESS OF BOWSTRING USING FIELD VERIFICATIONS,CALCULATIONS,PROBES,ETC. EA.TRUSS&BEARINGS EVAL'D. ANY STRUCTURAL DEFICIENCIES SHORED.REPAIR DRWGS.FILED WITHIN 45 DAYSOF VIO
DOB11/24/2000V-DOB VIOLATION - ACTIVE
Contractors warehouse · Owner of record: CHESTNUT ASSOCIATESLTD · 30,915 sf lot · 0.32 FAR built · Flood zone X