One family attached or semi-detached
317 ETNA STREET
BROOKLYN · BIN 3091026
💬 Discuss this project
1920Year Built
2Stories
A5Building Class
R5Zoning
1,466 sfGross Floor Area
1Units
One family attached or semi-detached · Owner of record: INFINITE PROPS LLC · 1,406 sf lot · 1.04 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 210p · 1 filing · 20 docs
Floor 113p · 1 filing · 20 docs
Cellar15p · 3 filings · 20 docs
2 jobs · most recent 07/25/2025
Gas Water/Sanitary
FiledStatusContractorScope
07/25/2025Signed-offM & M PIPING AND HEATINGGas, Water/Sanitary
04/16/2021——Gas, Water/Sanitary
2 jobs · most recent 10/13/2025
General Wiring
FiledStatusContractorScope
10/13/2025CompleteSUPREME ELECTRIC CORPGeneral Wiring
01/19/2022CompleteR.A. PHILLIPS ELEC'L CONTGeneral Wiring
Building Lifecycle
All (37)Filed (6)Permit Issued (2)Signed Off (1)Inspection (12)Objection (7)Special Inspection (9)
05/28/2026
Signed off — Alteration CO
Plumbing work for a renovation & conversion from 1 to 2 family dwelling as per submitted drawing.
B00539945-S1
12/15/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
12/15/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/02/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
11/24/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/01/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
07/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
GLEN LANGER
07/28/2025
Special inspection requirement — Maintenance information
GLEN LANGER
07/25/2025
Filed — Alteration CO
Plumbing work for a renovation & conversion from 1 to 2 family dwelling as per submitted drawing.
B00539945-P3
07/23/2025
Special inspection requirement — Maintenance information
GLEN LANGER
07/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
GLEN LANGER
03/24/2025
Filed — Alteration CO
Plumbing work for a renovation & conversion from 1 to 2 family dwelling as per submitted drawing.
B00539945-P2
02/13/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
01/31/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/31/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/31/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/14/2025
Permit issued — General Construction
B00539945-I1-GC
12/11/2024
Permit issued — Plumbing
B00539945-S1-PL
12/03/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
11/15/2024
Filed — Alteration CO
Plumbing work for a renovation & conversion from 1 to 2 family dwelling as per submitted drawing.
B00539945-S1
10/31/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/23/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/19/2021
Filed — Alteration CO
Plumbing work for a renovation & conversion from 1 to 2 family dwelling as per submitted drawing.
B00539945-I1
04/20/2021
Objection raised — Scope
04/20/2021
Objection resolved — Addressed
04/20/2021
Objection raised — Fire_Protection
04/20/2021
Objection resolved — Addressed
04/20/2021
Objection raised — Energy
04/20/2021
Objection resolved — Addressed
04/20/2021
Objection raised — Other
04/16/2021
Filed — Alteration
INTERIOR RENOVATION. NEW WALL PARTITIONS, NEW FINISHES ON FLOORS AND CEILINGS. 1 FAMILY CONVERSION TO 2 FAMILY (NEW CO). NO CHANGE TO BUILDING BULK.
B00448887-I1
04/16/2021
Filed — Alteration
INSTALL NEW GAS COMBI-BOILER HOT WATER HEATER IN CELLAR. REPLACE/ RELOCATE PLUMBING FIXTURES ON EXISTING FLOORS. NEW KITCHEN SINK
B00449926-I1
01/08/2021
Special inspection requirement — Air barrier - visual inspection
ANTHONY VILLANO
01/08/2021
Special inspection requirement — Interior lighting power
ANTHONY VILLANO
01/06/2021
Special inspection requirement — Insulation placement and R values
ANTHONY VILLANO
01/06/2021
Special inspection requirement — Energy Code Compliance Inspections
ANTHONY VILLANO
01/06/2021
Special inspection requirement — Energy Code Compliance
ANTHONY VILLANO
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
A FINAL TOUCH CONSTRUCTION1104/09/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/23/2024$600K—317 ETNA STREET LLC → INFINITE PROPS LLC$409/sf building
11/25/2020$580K—Private party → 317 ETNA STREET LLC$396/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SOUTHERN CONSULTING ENGINEERING PC407/25/2025
ACV DESIGN LTD204/16/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JARED ASSOCIATE CONSULTING803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KAIETEUR CONSTRUCTION INC.General Contractor104/09/2026
M & M PIPING AND HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
S&S CONCRETE & SOIL TESTI1008407/25/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedKAIETEUR CONSTRUCTION INC01/14/2025
DOB NOWPlumbingSigned-offM & M PIPING AND HEATING12/11/2024
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
12/15/2025Fail-Final CND-Occupancy InspectionFailView ↗
12/15/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/02/2025Fail-Final CND-Occupancy InspectionFailView ↗
11/24/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/01/2025Fail-Final CND-Occupancy InspectionFailView ↗
02/13/2025Fail-Final CND-Occupancy InspectionFailView ↗
01/31/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/31/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/31/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/03/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/31/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/23/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
07/28/2025Fire-Resistant Penetrations and JointsGLEN LANGERspecial
07/28/2025Maintenance informationGLEN LANGERenergy_progress
07/23/2025Maintenance informationGLEN LANGERenergy_progress
07/23/2025Fire-Resistant Penetrations and JointsGLEN LANGERspecial
01/08/2021Air barrier - visual inspectionANTHONY VILLANOenergy_progress
01/08/2021Interior lighting powerANTHONY VILLANOenergy_progress
01/06/2021Insulation placement and R valuesANTHONY VILLANOenergy_progress
01/06/2021Energy Code Compliance InspectionsANTHONY VILLANOprogress
01/06/2021Energy Code ComplianceANTHONY VILLANOprogress
▾Documents — 33 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch4
09/01/2026B00539945-P2Request digital key ↗
09/01/2026B00539945-P3Request digital key ↗
09/01/2026B00539945-S1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - General Construction1
08/15/2026B00448887-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
08/14/2026B00449926-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
09/01/2026B00539945-I1Open ↗
▸Seals & Professional Certifications15
▸DOB NOWProgress Inspector Seal & Signature7
08/30/2026B00539945-P3Open ↗
08/28/2026B00448887-I1Open ↗
08/28/2026B00448887-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/01/2026B00448887-I1Open ↗
09/01/2026B00449926-I1Open ↗
09/01/2026B00539945-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/30/2026B00539945-P3Open ↗
08/27/2026B00539945-S1Open ↗
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist2
09/01/2026B00539945-P2Open ↗
09/01/2026B00539945-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00539945-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
09/01/2026B00539945-P2Open ↗
09/01/2026B00539945-S1Open ↗
09/01/2026B00539945-I1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
09/01/2026B00539945-I1Open ↗
▸Other Documents3
▸DOB NOWWaiver Document2
08/13/2026B00539945-I1Open ↗
08/13/2026B00539945-P2Open ↗
▸DOB NOWFinal Survey1