← Back
Two family frame
82 NICHOLS AVENUE
BROOKLYN · BIN 3091210
💬 Discuss this project
1901Year Built
2Stories
B2Building Class
R5Zoning
1,720 sfGross Floor Area
2Units
3 Open Violations ▸FDNY Report ↗
Two family frame · 1,800 sf lot · 0.96 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 23p · 2 filings · 12 docs
Floor 13p · 2 filings · 12 docs
Cellar3p · 2 filings · 12 docs
1 job · most recent 10/16/2023
Gas Water/Sanitary
FiledStatusContractorScope
10/16/2023Permit IssuedTRI CITY MECHANICAL GROUPGas, Water/Sanitary
1 job · most recent 08/16/2024
General Wiring
FiledStatusContractorScope
08/16/2024CompleteASCUATECH ELECTRICAL CORPGeneral Wiring
2 jobs · most recent 07/20/2026
Steel
FiledStatusContractorScope
07/20/2026——Steel
07/01/2026——Steel
Building Lifecycle
All (26)Filed (6)Permit Issued (2)Violation (3)Inspection (7)Objection (1)Special Inspection (7)
08/07/2026
Objection raised — Other
07/20/2026
Filed — Alteration
Erection of Gazebo structure tied to OATH summons 039177511Z
B01433720-I1
07/20/2026
Special inspection requirement — Structural Steel - Details
07/20/2026
Special inspection requirement — Final
07/20/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
07/20/2026
Special inspection requirement — Structural Steel - Welding
07/01/2026
Filed — Alteration
B01397622-I1
07/01/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
07/01/2026
Special inspection requirement — Structural Steel - Welding
07/01/2026
Special inspection requirement — Structural Steel - Details
02/17/2026
Violation issued (ECB, open)
Construction
08/23/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/11/2024
Filed — Alteration
GENERAL INTERIOR RENOVATIONS ON 1ST AND 2ND FLOORS KITCHENS, BATHROOMS WINDOWS AND 2ND FLOOR REINFORCEMENTS.
B00925370-P1
06/04/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
05/29/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/09/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/01/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/01/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/01/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/07/2024
Filed — Alteration
GENERAL INTERIOR RENOVATIONS ON 1ST AND 2ND FLOORS KITCHENS, BATHROOMS WINDOWS AND 2ND FLOOR REINFORCEMENTS.
B00925370-S1
01/16/2024
Permit issued — Plumbing
B00941794-I1-PL
10/20/2023
Permit issued — General Construction
B00925370-I1-GC
10/16/2023
Filed — Alteration
GENERAL INTERIOR RENOVATIONS ON 1ST AND 2ND FLOORS KITCHENS, BATHROOMS WINDOWS AND 2ND FLOOR REINFORCEMENTS.
B00925370-I1
10/16/2023
Filed — Alteration
FILING TO PERFOM INTERIOR PLUMBING WORK
B00941794-I1
07/15/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/14/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
THE ORDERING FORCE507/20/2026
HANSA BUILDING ENGINEERING SERVICES110/16/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PM MECHANICAL GROUP CORPGeneral Contractor303/21/2026
TRI CITY MECHANICAL GROUP CORPPlumbing107/08/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedFLAVIO MECHANICAL CORP01/16/2024
DOB NOWGeneral ConstructionPermit IssuedPM MECHANICAL GROUP CORP10/20/2023
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
08/23/2024Pass-Final CND-Occupancy InspectionPassView ↗
06/04/2024Fail-Final General Construction Non-Directive 14FailView ↗
05/29/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/09/2024Pass-Final CND-Occupancy InspectionPassView ↗
03/01/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/01/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/01/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
07/20/2026Structural Steel - Details—special
07/20/2026Final—progress
07/20/2026Structural Stability – Alterations of existing buildings—special
07/20/2026Structural Steel - Welding—special
07/01/2026Structural Stability – Alterations of existing buildings—special
07/01/2026Structural Steel - Welding—special
07/01/2026Structural Steel - Details—special
▾Documents — 16 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/26/2026B00941794-I1Request digital key ↗
08/26/2026B00925370-I1Request digital key ↗
08/26/2026B00925370-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/26/2026B00925370-P1Open ↗
08/26/2026B00925370-S1Open ↗
08/26/2026B00925370-I1Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/26/2026B00925370-S1Open ↗
08/26/2026B00925370-I1Open ↗
08/26/2026B00925370-P1Open ↗
Showing 3 of 4 on file for this type