← Back
Primarily 2 family with 1 store or office
3149 FULTON STREET
BROOKLYN · BIN 3092003
💬 Discuss this project
1920Year Built
3Stories
S2Building Class
R6BZoning
3,949 sfGross Floor Area
3Units
2 Open Violations 1 unresolved · 1 paperwork only ▸FDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: XING RONG, INC. · 1,723 sf lot · 2.29 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Permit Issued — active, not yet Signed-off
Floor 3Under Construction11p · 2 filings · 20 docs
Floor 2Under Construction4p · 1 filing · 20 docs
Floor 1Under Construction6p · 1 filing · 10 docs
CellarUnder Construction14p · 2 filings · 20 docs
1 job · most recent 05/14/2025
Gas Water/Sanitary
FiledStatusContractorScope
05/14/2025Permit IssuedWATSON'S PLBG, HTG, & BDGGas, Water/Sanitary
2 jobs · most recent 04/29/2025
General Wiring
FiledStatusContractorScope
04/29/2025Permit IssuedHI-RITE ELECTRIC CORPGeneral Wiring
03/28/2018Permit IssuedROBERT S. COVELLO—
1 job · most recent 02/06/2026
Masonry Wood
FiledStatusContractorScope
02/06/2026Permit IssuedNY PROCONSTRUCITON INCMasonry, Wood
Building Lifecycle
All (74)Filed (6)Permit Issued (7)Signed Off (1)Violation (12)Objection (22)Special Inspection (26)
09/11/2026
Permit issued — Plumbing
B01205688-S1-PL
05/01/2026
Permit issued — Plumbing
B01205688-S1-PL
04/29/2026
Permit issued — General Construction
B01205688-I1-GC
04/16/2026
Special inspection requirement — Masonry
XIUCHENG LI
04/16/2026
Special inspection requirement — Final
XIUCHENG LI
04/16/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
XIUCHENG LI
04/16/2026
Special inspection requirement — Wood – Seismic Resistance
04/01/2026
Objection resolved — Addressed
04/01/2026
Objection resolved — Addressed
04/01/2026
Objection resolved — Addressed
04/01/2026
Objection resolved — Addressed
04/01/2026
Objection resolved — Addressed
03/30/2026
Objection raised — Scope
03/30/2026
Objection raised — Scope
03/16/2026
Objection raised — Cost
03/16/2026
Objection raised — Scope
02/24/2026
Objection raised — Scope
02/06/2026
Filed — Alteration
STRUCTURAL WORK FOR REPLACING/ REINFORCING EXISTING DILAPIDATED 3RD FLOOR JOISTS. REPAIR/ REINFORCE CRACKS OF THE EXISTING BRICK WALL IN THE CELLAR. REMOVE LALLY COLUMNS IN THE CELLAR AND REPLACE WITH NEW STEEL COLUMNS AND STEEL SUPPORT BEAM.
B01252946-P1
01/17/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
XIUCHENG LI
01/17/2026
Special inspection requirement — Final
XIUCHENG LI
01/17/2026
Special inspection requirement — Masonry
XIUCHENG LI
01/17/2026
Special inspection requirement — Wood – Seismic Resistance
12/26/2025
Permit issued — Structural
B01252946-I1-GC-CX
12/09/2025
Violation issued (ECB, closed)
Construction
12/09/2025
Violation issued (ECB, open)
Construction
12/09/2025
Violation issued (ECB, closed)
Construction
12/09/2025
Violation issued (ECB, closed)
Construction
09/18/2025
Objection resolved — Addressed
09/04/2025
Objection resolved — Addressed
09/04/2025
Objection resolved — Addressed
08/19/2025
Objection raised — Scope
08/19/2025
Objection raised — Scope
08/05/2025
Objection resolved — Addressed
08/05/2025
Objection resolved — Addressed
08/04/2025
Objection resolved — Addressed
07/25/2025
Objection raised — Scope
07/25/2025
Objection raised — Scope
07/25/2025
Objection raised — Scope
07/25/2025
Objection raised — Scope
07/16/2025
Filed — Alteration
STRUCTURAL WORK FOR REPLACING/ REINFORCING EXISTING DILAPIDATED 3RD FLOOR JOISTS. REPAIR/ REINFORCE CRACKS OF THE EXISTING BRICK WALL IN THE CELLAR. REMOVE LALLY COLUMNS IN THE CELLAR AND REPLACE WITH NEW STEEL COLUMNS AND STEEL SUPPORT BEAM.
B01252946-I1
06/04/2025
Violation issued (ECB, closed)
Unknown
06/04/2025
Violation issued (ECB, closed)
Unknown
06/04/2025
Violation issued (ECB, closed)
Construction
06/03/2025
Violation issued (ECB, closed)
Construction
06/03/2025
Violation issued (ECB, closed)
Construction
06/03/2025
Violation issued (ECB, open)
Construction
05/16/2025
Special inspection requirement — HVAC-R and service water heating system controls
BRIAN ILL
05/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
BRIAN ILL
05/16/2025
Special inspection requirement — Energy Code Compliance Inspections
BRIAN ILL
05/16/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
BRIAN ILL
05/16/2025
Special inspection requirement — Maintenance information
BRIAN ILL
05/16/2025
Special inspection requirement — HVAC-R and service water heating equipment
BRIAN ILL
05/14/2025
Filed — Alteration
FILE PL WORKTYPE IN CONJUNCTION WITH JOB#B01205688
B01205688-P1
05/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
BRIAN ILL
05/14/2025
Special inspection requirement — Energy Code Compliance Inspections
BRIAN ILL
05/14/2025
Special inspection requirement — HVAC-R and service water heating system controls
BRIAN ILL
05/14/2025
Special inspection requirement — Maintenance information
BRIAN ILL
05/14/2025
Special inspection requirement — HVAC-R and service water heating equipment
BRIAN ILL
05/14/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
BRIAN ILL
04/28/2025
Permit issued — Plumbing
B01205688-S1-PL
Latest 60 of 74 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HI-RITE ELECTRIC CORP103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BAYSIDE ENGINEERING PC202/06/2026
BRIAN ILL DEVELOPMENT LLC305/14/2025
LEON SKVIRSKY PE103/12/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AMERILAND BROOK LLC603/21/2026
BUILDING BROTHERS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NY PROCONSTRUCITON INCGeneral Contractor507/08/2026
XH&RC PLBG AND HTG INCPlumbing207/08/2026
ROBERT S. COVELLOElectrical103/22/2026
ROOPCHAND SINGHElectrical103/21/2026
ON GUK TSEElectrical103/21/2026
WATSON'S PLBG, HTG, & BDGPlumbing109/13/2026
PAUL SIGNSScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SD TESTING & INSPECTION S7010202/06/2026
BRIAN ILL DEVELOPMENT LLC1402305/14/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedWATSON'S PLBG, HTG, & BDG09/11/2026
DOB NOWPlumbingPermit IssuedXH&RC PLBG AND HTG INC05/01/2026
DOB NOWGeneral ConstructionPermit IssuedNY PROCONSTRUCITON INC04/29/2026
DOB NOWStructuralPermit IssuedNY PROCONSTRUCITON INC12/26/2025
DOB NOWPlumbingPermit IssuedXH&RC PLBG AND HTG INC04/28/2025
DOB NOWGeneral ConstructionPermit IssuedNY PROCONSTRUCITON INC04/21/2025
DOB NOWSignSigned-offPAUL SIGNS, INC03/20/2018
BISFPISSUEDNEW YORK BUSINESS FIRE SYS. INC.04/11/2007
BISEQISSUED55C CONSTRUCTION CORP03/16/2007
BISPLISSUEDPLUMBING & HTG DOCTOR INC03/12/2007
BISMHISSUEDUNIVERSAL_CONSTRUCTION CONSULT03/08/2007
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
04/16/2026MasonryXIUCHENG LIspecial
04/16/2026FinalXIUCHENG LIprogress
04/16/2026Structural Stability – Alterations of existing buildingsXIUCHENG LIspecial
04/16/2026Wood – Seismic Resistance—special
01/17/2026Structural Stability – Alterations of existing buildingsXIUCHENG LIspecial
01/17/2026FinalXIUCHENG LIprogress
01/17/2026MasonryXIUCHENG LIspecial
01/17/2026Wood – Seismic Resistance—special
05/16/2025HVAC-R and service water heating system controlsBRIAN ILLenergy_progress
05/16/2025Fire-Resistant Penetrations and JointsBRIAN ILLspecial
05/16/2025Energy Code Compliance InspectionsBRIAN ILLprogress
05/16/2025HVAC-R and service water piping design and insulationBRIAN ILLenergy_progress
05/16/2025Maintenance informationBRIAN ILLenergy_progress
05/16/2025HVAC-R and service water heating equipmentBRIAN ILLenergy_progress
05/14/2025Fire-Resistant Penetrations and JointsBRIAN ILLspecial
05/14/2025Energy Code Compliance InspectionsBRIAN ILLprogress
05/14/2025HVAC-R and service water heating system controlsBRIAN ILLenergy_progress
05/14/2025Maintenance informationBRIAN ILLenergy_progress
05/14/2025HVAC-R and service water heating equipmentBRIAN ILLenergy_progress
05/14/2025HVAC-R and service water piping design and insulationBRIAN ILLenergy_progress
04/12/2025Fire-Resistant Penetrations and JointsBRIAN ILLspecial
04/12/2025HVAC-R and service water heating equipmentBRIAN ILLenergy_progress
04/12/2025HVAC-R and service water heating system controlsBRIAN ILLenergy_progress
04/12/2025Permanent certificateBRIAN ILLenergy_progress
04/12/2025HVAC-R and service water piping design and insulationBRIAN ILLenergy_progress
Latest 25 of 26.
▾Documents — 35 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
09/03/2026B00023126-I1Request digital key ↗
08/21/2026B01205688-I1Request digital key ↗
08/21/2026B01205688-S1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications25
▸DOB NOWProgress Inspector Seal & Signature14
09/02/2026B01205688-P1Open ↗
09/02/2026B01205688-P1Open ↗
09/02/2026B01205688-P1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/03/2026B00023126-I1Open ↗
08/21/2026B01205688-P1Open ↗
08/21/2026B01205688-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/02/2026B01205688-P1Open ↗
09/01/2026B01252946-P1Open ↗
08/28/2026B01252946-I1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
09/03/2026B00023126-I1Open ↗
08/21/2026B01205688-I1Open ↗
08/15/2026B01252946-P1Open ↗
Showing 3 of 4 on file for this type