← Back
Primarily 2 family with 1 store or office
3290 FULTON STREET
BROOKLYN · BIN 3092683
💬 Discuss this project
1920Year Built
3Stories
S2Building Class
R5Zoning
2,963 sfGross Floor Area
3Units
1 Open Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Primarily 2 family with 1 store or office · 1,699 sf lot · 1.74 FAR built · Flood zone X
Locations of Work
Plumbing
Cellar2p · 1 filing · 17 docs
1 job · most recent 10/30/2021
General Wiring
FiledStatusContractorScope
10/30/2021CompleteJ Y ELECTRIC INCGeneral Wiring
Building Lifecycle
All (24)Filed (3)Permit Issued (2)Signed Off (2)Violation (2)Inspection (6)Special Inspection (9)
02/04/2022
Signed off — Alteration
INSTALL 1 BOILER IN CEL FOR 2ND FLOOR RESIDENTIAL USE. BOILER WORK AS PER PLAN. NO CHANGES TO USE, EGRESS, OR OCCUPANCY.
B00607445-S1
02/04/2022
Signed off — Alteration
INSTALL 1 BOILER IN CEL FOR 2ND FLOOR RESIDENTIAL USE. BOILER WORK AS PER PLAN. NO CHANGES TO USE, EGRESS, OR OCCUPANCY.
B00607445-I1
01/26/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/25/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
01/24/2022
Special inspection requirement — Heating Systems
HO YIN LAW
01/24/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
HO YIN LAW
01/20/2022
Filed — Alteration
INSTALL 1 BOILER IN CEL FOR 2ND FLOOR RESIDENTIAL USE. BOILER WORK AS PER PLAN. NO CHANGES TO USE, EGRESS, OR OCCUPANCY.
B00607445-P1
01/20/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
HO YIN LAW
01/20/2022
Special inspection requirement — Heating Systems
HO YIN LAW
01/05/2022
Permit issued — Boiler Equipment
B00607445-S1-BE
01/04/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/04/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/08/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/08/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/08/2021
Filed — Alteration
INSTALL 1 BOILER IN CEL FOR 2ND FLOOR RESIDENTIAL USE. BOILER WORK AS PER PLAN. NO CHANGES TO USE, EGRESS, OR OCCUPANCY.
B00607445-S1
11/08/2021
Permit issued — Plumbing
B00607445-I1-PL
10/07/2021
Filed — Alteration
INSTALL 1 BOILER IN CEL FOR 2ND FLOOR RESIDENTIAL USE. BOILER WORK AS PER PLAN. NO CHANGES TO USE, EGRESS, OR OCCUPANCY.
B00607445-I1
10/06/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
HO YIN LAW
10/06/2021
Special inspection requirement — Energy Code Compliance Inspections
HO YIN LAW
10/06/2021
Special inspection requirement — HVAC-R and service water heating equipment
HO YIN LAW
10/06/2021
Special inspection requirement — HVAC-R and service water heating system controls
HO YIN LAW
10/06/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
HO YIN LAW
06/05/2020
Violation issued (FDNY_ORDER, closed)
07/16/2018
Violation issued (ECB, open)
Construction
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KL INNOVATIVE DESIGN INC301/20/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BASIC GROUPS603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PIPESTYLISTS, INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KL INNOVATIVE DESIGN INC7225301/20/2022
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offT & T PLUMBING INC01/05/2022
DOB NOWPlumbingSigned-offT & T PLUMBING INC11/08/2021
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
01/26/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/25/2022Pass-Final Boiler Equipment InspectionPassView ↗
01/04/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/04/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/08/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/08/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
01/24/2022Heating SystemsHO YIN LAWspecial
01/24/2022Fire-Resistant Penetrations and JointsHO YIN LAWspecial
01/20/2022Fire-Resistant Penetrations and JointsHO YIN LAWspecial
01/20/2022Heating SystemsHO YIN LAWspecial
10/06/2021Fire-Resistant Penetrations and JointsHO YIN LAWspecial
10/06/2021Energy Code Compliance InspectionsHO YIN LAWprogress
10/06/2021HVAC-R and service water heating equipmentHO YIN LAWenergy_progress
10/06/2021HVAC-R and service water heating system controlsHO YIN LAWenergy_progress
10/06/2021HVAC-R and service water piping design and insulationHO YIN LAWenergy_progress
▾Documents — 17 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
09/01/2026B00607445-I1Request digital key ↗
09/01/2026B00607445-P1Request digital key ↗
09/01/2026B00607445-S1Request digital key ↗
▸Seals & Professional Certifications10
▸DOB NOWSpecial Inspector Seal & Signature5
09/23/2026B00607445-S1Open ↗
09/23/2026B00607445-S1Open ↗
09/01/2026B00607445-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
09/01/2026B00607445-I1Open ↗
09/01/2026B00607445-P1Open ↗
09/01/2026B00607445-S1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026B00607445-I1Open ↗
09/01/2026B00607445-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/01/2026B00607445-P1Open ↗
09/01/2026B00607445-S1Open ↗
09/01/2026B00607445-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
09/01/2026B00607445-I1Open ↗