← Back
Two family frame
79 GLEN STREET
BROOKLYN · BIN 3093283
💬 Discuss this project
1910Year Built
2Stories
B2Building Class
R5BZoning
1,995 sfGross Floor Area
2Units
1 Open Violation ▸FDNY Report ↗
Two family frame · 3,750 sf lot · 0.53 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AZAAN PROPERTIES INC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/20/2021$595K—Private party → AZAAN PROPERTIES, INC.$298/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RONALD VILLANO ARCHITECT PC611/16/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MAB CONSULTING SERVICES603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BROTHERS CONSTRUCTION GROGeneral Contractor207/08/2026
HORBRIDGE PLUMBING & HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BUILDTECH ENGINEERING6369111/16/2022
Building Lifecycle
All (91)Filed (6)Permit Issued (3)Signed Off (3)Violation (59)Inspection (4)Objection (12)Special Inspection (4)
12/16/2022
Violation issued (ECB, closed)
Construction
12/05/2022
Signed off — Alteration
REFILING THE JOB APPLICATION TO SHOW THE CELLAR WORK ON THE PLAN AND ON THE PW1 IN RELATED TO THE JOB APPLICATION #B00521016REMOVE NON LOAD BEARING PARTITIONS INSTALL NEW PARTITIONS AND FINISHES NO CHANGE IN USE, BULK OF EGRESS PLUMBING JOB #800521053
B08040717-I1
11/21/2022
Permit issued — General Construction
B08040717-I1-GC
11/16/2022
Filed — Alteration
REFILING THE JOB APPLICATION TO SHOW THE CELLAR WORK ON THE PLAN AND ON THE PW1 IN RELATED TO THE JOB APPLICATION #B00521016REMOVE NON LOAD BEARING PARTITIONS INSTALL NEW PARTITIONS AND FINISHES NO CHANGE IN USE, BULK OF EGRESS PLUMBING JOB #800521053
B08040717-I1
11/16/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Luis Pichardo
11/16/2022
Special inspection requirement — Final
RONALD VILLANO
11/26/2021
Signed off — Alteration
REPLACING OLD FIXTURES WITH NEW ON 2ND FLOOR- 1 WC, 1 LAV, 1 TUB, 1 SINK REPLACING OLD FIXTURES WITH NEW ON 1ST FLOOR- 2 WC, 2 LAV, 2 TUB, 1 SINK. NO CHANGE IN USE, EGRESS OR OCCUPANCY
B00521053-I1
10/25/2021
Filed — Alteration
REPLACING OLD FIXTURES WITH NEW ON 2ND FLOOR- 1 WC, 1 LAV, 1 TUB, 1 SINK REPLACING OLD FIXTURES WITH NEW ON 1ST FLOOR- 2 WC, 2 LAV, 2 TUB, 1 SINK. NO CHANGE IN USE, EGRESS OR OCCUPANCY
B00521053-P3
10/14/2021
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/12/2021
Signed off — Alteration
GENERAL CONSTRUCTION TO RESPOND THE VIUOLATION. WORK WILL INCLUDE REMOVING NON LOAD BEARING WALLS NEW PARTITIONS AND FINISHES AS PER PLAN AT CELL, 2ST AND 2ND. NO CHANGE IN USE OR OCCUPANCY.
B00521016-I1
10/06/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/28/2021
Filed — Alteration
REPLACING OLD FIXTURES WITH NEW ON 2ND FLOOR- 1 WC, 1 LAV, 1 TUB, 1 SINK REPLACING OLD FIXTURES WITH NEW ON 1ST FLOOR- 2 WC, 2 LAV, 2 TUB, 1 SINK. NO CHANGE IN USE, EGRESS OR OCCUPANCY
B00521053-P2
09/20/2021
Objection resolved — Addressed
09/13/2021
Objection raised — Scope
09/09/2021
Filed — Alteration
REPLACING OLD FIXTURES WITH NEW ON 2ND FLOOR- 1 WC, 1 LAV, 1 TUB, 1 SINK REPLACING OLD FIXTURES WITH NEW ON 1ST FLOOR- 2 WC, 2 LAV, 2 TUB, 1 SINK. NO CHANGE IN USE, EGRESS OR OCCUPANCY
B00521053-P1
08/06/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/04/2021
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/07/2021
Permit issued — General Construction
B00521016-I1-GC
07/06/2021
Permit issued — Plumbing
B00521053-I1-PL
06/08/2021
Objection raised — Scope
06/08/2021
Objection resolved — Addressed
05/31/2021
Objection raised — Admin
05/31/2021
Objection resolved — Addressed
05/31/2021
Objection raised — Scope
05/31/2021
Objection resolved — Addressed
05/31/2021
Objection raised — Admin
05/31/2021
Objection resolved — Addressed
05/31/2021
Objection raised — Energy
05/31/2021
Objection resolved — Addressed
05/27/2021
Filed — Alteration
REPLACING OLD FIXTURES WITH NEW ON 2ND FLOOR- 1 WC, 1 LAV, 1 TUB, 1 SINK REPLACING OLD FIXTURES WITH NEW ON 1ST FLOOR- 2 WC, 2 LAV, 2 TUB, 1 SINK. NO CHANGE IN USE, EGRESS OR OCCUPANCY
B00521053-I1
05/20/2021
Filed — Alteration
GENERAL CONSTRUCTION TO RESPOND THE VIUOLATION. WORK WILL INCLUDE REMOVING NON LOAD BEARING WALLS NEW PARTITIONS AND FINISHES AS PER PLAN AT CELL, 2ST AND 2ND. NO CHANGE IN USE OR OCCUPANCY.
B00521016-I1
05/20/2021
Special inspection requirement — Lighting in dwelling units
RONALD VILLANO
05/18/2021
Special inspection requirement — Final
RONALD VILLANO
04/30/2021
Violation issued (ECB, closed)
Construction
04/30/2021
Violation issued (ECB, closed)
Construction
04/30/2021
Violation issued (ECB, closed)
Construction
04/30/2021
Violation issued (ECB, closed)
Construction
04/30/2021
Violation issued (ECB, closed)
Construction
04/29/2021
Violation issued (ECB, closed)
Construction
04/07/2021
Violation issued (ECB, closed)
Construction
03/02/2021
Violation issued (ECB, closed)
Construction
12/29/2020
Violation issued (ECB, closed)
Construction
12/29/2020
Violation issued (ECB, closed)
Construction
12/29/2020
Violation issued (ECB, closed)
Construction
12/29/2020
Violation issued (ECB, closed)
Construction
12/29/2020
Violation issued (ECB, closed)
Construction
09/15/2020
Violation issued (ECB, closed)
Construction
09/15/2020
Violation issued (ECB, closed)
Construction
09/15/2020
Violation issued (ECB, closed)
Construction
09/15/2020
Violation issued (ECB, closed)
Construction
09/15/2020
Violation issued (ECB, closed)
Construction
08/14/2020
Violation issued (ECB, closed)
Construction
02/01/2020
Violation issued (ECB, closed)
Construction
02/01/2020
Violation issued (ECB, closed)
Construction
02/01/2020
Violation issued (ECB, closed)
Construction
02/01/2020
Violation issued (ECB, closed)
Construction
02/01/2020
Violation issued (ECB, closed)
Construction
12/10/2019
Violation issued (ECB, closed)
Construction
12/10/2019
Violation issued (ECB, closed)
Construction
12/10/2019
Violation issued (ECB, closed)
Construction
Latest 60 of 91 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offBROTHERS CONSTRUCTION GRO11/21/2022
DOB NOWGeneral ConstructionSigned-offBROTHERS CONSTRUCTION GRO07/07/2021
DOB NOWPlumbingSigned-offHORBRIDGE PLUMBING & HEAT07/06/2021
BISPLISSUEDCITY TESTING & PLUMBING I02/15/2005
BISOTISSUEDOWNER02/07/2005
BIS—ISSUEDN/A12/20/1991
4 projects · most recent 02/01/2022
General Wiring
FiledStatusContractorScope
02/01/2022CompleteL J ELEC'L SERV. INC.3 meters, 1 new_meters
12/28/2021CompleteL J ELEC'L SERV. INC.General Wiring
12/28/2021CompleteL J ELEC'L SERV. INC.General Wiring
10/01/2019CompleteUL ELECTRICAL CORP.General Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
10/14/2021Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/06/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/06/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/04/2021Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
11/16/2022Fire-Resistant Penetrations and JointsLuis Pichardospecial
11/16/2022FinalRONALD VILLANOprogress
05/20/2021Lighting in dwelling unitsRONALD VILLANOenergy_progress
05/18/2021FinalRONALD VILLANOprogress
▾Documents — 29 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
09/01/2026B00521016-I1Request digital key ↗
08/31/2026B00521053-P2Request digital key ↗
08/31/2026B00521053-P3Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION3
01/23/2020340701725Open ↗
11/20/2019322003381Open ↗
09/04/2019322012166Open ↗
▸DOB NOWHPD - Permit Notice1
08/13/2026B00521016-I1Open ↗
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/28/2026B08040717-I1Open ↗
08/13/2026B00521053-P1Open ↗
08/13/2026B00521016-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026B00521016-I1Open ↗
09/01/2026B00521016-I1Open ↗
08/24/2026B08040717-I1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
11/20/2019322003381Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/24/2026B08040717-I1Open ↗
▸Environmental & Asbestos1
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
11/20/2019322003381Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
11/20/2019322003381Open ↗
09/04/2019322012166Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00521016-I1Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
11/20/2019322003381Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
11/20/2019322003381Open ↗
09/04/2019322012166Open ↗
▸Other Documents1
▸BISPLOT DIAGRAM1
11/20/2019322003381Open ↗