← Back
Two family converted from one family
379 EUCLID AVENUE
BROOKLYN · BIN 3093371
💬 Discuss this project
1920Year Built
2Stories
B3Building Class
R5Zoning
1,408 sfGross Floor Area
2Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Two family converted from one family · 1,820 sf lot · 0.77 FAR built · Flood zone X
Locations of Work
Architecture
Cellar1p · 1 filing · 3 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AR ARCHITECT P.C507/07/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADAC CONSTRUCTION1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SIGNORE & SONS PLBG CORPPlumbing307/08/2026
RAJINDRAH RAMRATTANElectrical103/21/2026
STEWARDSON CONSTRUCTIONGeneral Contractor107/08/2026
YAFE MEOD CORPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AR ARCHITECT P.C.1171305/06/2025
Building Lifecycle
All (16)Filed (5)Permit Issued (5)Signed Off (2)Violation (4)
04/02/2026
Signed off — Alteration
RELOCATED GAS STOVE AND KITCHEN SINK ON THE FIRST FLOOR AND RELOCATED LAVATORY, TOILET, SLOP SINK, AND WASHING MACHINE IN CELLAR FLOOR.
B00920033-S1
04/02/2026
Signed off — Alteration
B01242778-I1
08/01/2025
Permit issued — General Construction
B01242778-I1-GC
07/07/2025
Filed — Alteration
B01242778-I1
06/30/2025
Permit issued — Plumbing
B00920033-S1-PL
05/29/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/06/2025
Filed — Alteration
RELOCATED GAS STOVE AND KITCHEN SINK ON THE FIRST FLOOR AND RELOCATED LAVATORY, TOILET, SLOP SINK, AND WASHING MACHINE IN CELLAR FLOOR.
B00920033-P2
04/03/2025
Permit issued — Plumbing
B00920033-S1-PL
12/13/2023
Permit issued — Plumbing
B00920033-S1-PL
12/12/2023
Permit issued — General Construction
B00920033-I1-GC
08/24/2023
Filed — Alteration
RELOCATED GAS STOVE AND KITCHEN SINK ON THE FIRST FLOOR AND RELOCATED LAVATORY, TOILET, SLOP SINK, AND WASHING MACHINE IN CELLAR FLOOR.
B00920033-S1
08/24/2023
Filed — Alteration
RELOCATED GAS STOVE AND KITCHEN SINK ON THE FIRST FLOOR AND RELOCATED LAVATORY, TOILET, SLOP SINK, AND WASHING MACHINE IN CELLAR FLOOR.
B00920033-I1
05/25/2023
Filed — Alteration
B00875009-I1
02/17/2007
Violation issued (DOB, closed)
VW*-VIOLATION - WORK W/O PERMIT DISMISSED
02/17/2007
Violation issued (ECB, closed)
Construction
02/17/2007
Violation issued (ECB, closed)
Quality of Life
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offYAFE MEOD CORP08/01/2025
DOB NOWPlumbingSigned-offSIGNORE & SONS PLBG CORP06/30/2025
DOB NOWPlumbingSigned-offSIGNORE & SONS PLBG CORP04/03/2025
DOB NOWPlumbingSigned-offSIGNORE & SONS PLBG CORP12/13/2023
DOB NOWGeneral ConstructionSigned-offSTEWARDSON CONSTRUCTION12/12/2023
BISOTISSUEDRS CONSTRUCTION & EXPEDITING SER03/02/2007
BISPLISSUEDTHE PLUMBING COMPANY, INC.03/02/2007
1 project · most recent 05/06/2025
Gas Water/Sanitary
FiledStatusContractorScope
05/06/2025Signed-offSIGNORE & SONS PLBG CORPGas, Water/Sanitary
1 project · most recent 12/18/2023
General Wiring
FiledStatusContractorScope
12/18/2023CompleteNEW CENTURY ELEC'L CONTRGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
09/12/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/31/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/10/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
03/07/2024Pass-Final General Construction Non-Directive 14PassView ↗
03/01/2024Fail-Final General Construction Non-Directive 14FailView ↗
02/08/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/08/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
07/21/2025Fire-Resistant Penetrations and JointsANGEL ROJASspecial
04/28/2025Fire-Resistant Penetrations and JointsANGEL ROJASspecial
08/22/2023Fire-Resistant Penetrations and JointsANGEL ROJASspecial
▾Documents — 17 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/27/2026B00875009-I1Request digital key ↗
08/26/2026B00920033-S1Request digital key ↗
08/21/2026B01242778-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/27/2026B00875009-I1Open ↗
08/26/2026B00920033-S1Open ↗
08/26/2026B00920033-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/02/2026B00920033-I1Open ↗
08/25/2026B00920033-P2Open ↗
08/22/2026B00920033-S1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/26/2026B00920033-S1Open ↗
08/21/2026B01242778-I1Open ↗
08/15/2026B00920033-I1Open ↗
Showing 3 of 4 on file for this type