← Back
Health center, child center, clinic
1063 LIBERTY AVENUE
BROOKLYN · BIN 3093584
💬 Discuss this project
1992Year Built
1Stories
I5Building Class
R5Zoning
2,500 sfGross Floor Area
1Units
Health center, child center, clinic · Owner of record: PICASSO REALTY, CORP. · 2,500 sf lot · 1 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanical
Roof1p · 1 filing · 3 docs
Floor 13p · 3 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
YOUN DESIGN CORP.105/03/2025
POLY ENGINEER PC101/28/2025
CHANDA ENGINEERING CONSULTANT PC401/10/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AN TONG FAN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CT IDEAL SUPPRESSIONGeneral Contractor303/21/2026
ZH RESTORATION INCGeneral Contractor204/09/2026
MARTINEZ, JOSEElectrical103/21/2026
MCKENNA, KERWINElectrical103/21/2026
M & M PIPING AND HEATINGPlumbing107/08/2026
NEPTUNE SIGNS AWNINGSScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
POLY ENGINEER, P.C.6110101/28/2025
CHANDA ENG. CONSULTANT PC6842301/10/2025
Building Lifecycle
All (27)Filed (6)Permit Issued (5)Signed Off (5)Inspection (4)Special Inspection (7)
06/11/2026
Signed off — Alteration
APPLICATION FILE TO RENOVATE EXISTING RETAIL STORE ON FIRST FLOOR. INSTALL NEW PLUMBING FIXTURES, 3-COMPARTMENT SINK, TOILET, GREASE TRAP, COMMERCIAL KITCHEN AS PER PLAN.
B01111452-S1
03/09/2026
Signed off — Alteration
Interior renovation, remove partitions drywalls, drop ceiling tiles and floor tiles at 1st floor areas. no change in use, egress, bulk and occupancy
B01096225-I1
03/09/2026
Signed off — Alteration
APPLICATION FILE TO RENOVATE EXISTING RETAIL STORE ON FIRST FLOOR. INSTALL NEW PLUMBING FIXTURES, 3-COMPARTMENT SINK, TOILET, GREASE TRAP, COMMERCIAL KITCHEN AS PER PLAN.
B01111452-I1
11/24/2025
Signed off — Alteration
INSTALLATION OF AN ILLUMINATED BUSINESS ACCESSORY SIGN . NO CHANGE IN USE, EGRESS OR OCCUPANCY
B01217870-I1
06/20/2025
Signed off — Alteration
B01134545-I1
06/06/2025
Inspection — Pass-Final Sign Permit Inspection
Pass
View inspection ↗
05/20/2025
Permit issued — Sign
B01217870-I1-SG
05/03/2025
Filed — Alteration
INSTALLATION OF AN ILLUMINATED BUSINESS ACCESSORY SIGN . NO CHANGE IN USE, EGRESS OR OCCUPANCY
B01217870-I1
02/21/2025
Permit issued — Mechanical Systems
B01134545-I1-MS
01/28/2025
Filed — Alteration
B01134545-I1
01/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
KARTIK CHANDA
01/10/2025
Filed — Alteration
APPLICATION FILE TO RENOVATE EXISTING RETAIL STORE ON FIRST FLOOR. INSTALL NEW PLUMBING FIXTURES, 3-COMPARTMENT SINK, TOILET, GREASE TRAP, COMMERCIAL KITCHEN AS PER PLAN.
B01111452-P1
01/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
KARTIK CHANDA
10/17/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/17/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/17/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/01/2024
Permit issued — Plumbing
B01111452-S1-PL
09/29/2024
Filed — Alteration
APPLICATION FILE TO RENOVATE EXISTING RETAIL STORE ON FIRST FLOOR. INSTALL NEW PLUMBING FIXTURES, 3-COMPARTMENT SINK, TOILET, GREASE TRAP, COMMERCIAL KITCHEN AS PER PLAN.
B01111452-S1
09/26/2024
Permit issued — General Construction
B01111452-I1-GC
09/15/2024
Filed — Alteration
APPLICATION FILE TO RENOVATE EXISTING RETAIL STORE ON FIRST FLOOR. INSTALL NEW PLUMBING FIXTURES, 3-COMPARTMENT SINK, TOILET, GREASE TRAP, COMMERCIAL KITCHEN AS PER PLAN.
B01111452-I1
09/15/2024
Special inspection requirement — Fire-Resistance Rated Construction
KARTIK CHANDA
09/15/2024
Special inspection requirement — Energy Code Compliance Inspections
KARTIK CHANDA
09/15/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
KARTIK CHANDA
09/15/2024
Special inspection requirement — Interior lighting power
KARTIK CHANDA
09/14/2024
Special inspection requirement — Final
KARTIK CHANDA
09/05/2024
Permit issued — General Construction
B01096225-I1-GC
08/15/2024
Filed — Alteration
Interior renovation, remove partitions drywalls, drop ceiling tiles and floor tiles at 1st floor areas. no change in use, egress, bulk and occupancy
B01096225-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offNEPTUNE SIGNS&AWNINGS INC05/20/2025
DOB NOWMechanical SystemsSigned-offCT IDEAL SUPPRESSION02/21/2025
DOB NOWPlumbingSigned-offM & M PIPING AND HEATING10/01/2024
DOB NOWGeneral ConstructionSigned-offZH RESTORATION INC09/26/2024
DOB NOWGeneral ConstructionSigned-offZH RESTORATION INC09/05/2024
BISEQISSUEDMARTE DEVELOPMENT LLC11/28/2012
BISOTISSUEDMARTE DEVELOPMENT LLC11/28/2012
1 project · most recent 04/03/2025
FiledStatusContractorScope
04/03/2025CompleteJONG HYUN KIM—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
06/06/2025Pass-Final Sign Permit InspectionPassView ↗
10/17/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/17/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/17/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
01/14/2025Fire-Resistant Penetrations and JointsKARTIK CHANDAspecial
01/10/2025Fire-Resistant Penetrations and JointsKARTIK CHANDAspecial
09/15/2024Fire-Resistance Rated ConstructionKARTIK CHANDAprogress
09/15/2024Energy Code Compliance InspectionsKARTIK CHANDAprogress
09/15/2024Fire-Resistant Penetrations and JointsKARTIK CHANDAspecial
09/15/2024Interior lighting powerKARTIK CHANDAenergy_progress
09/14/2024FinalKARTIK CHANDAprogress
▾Documents — 33 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/24/2026B01096225-I1Request digital key ↗
08/24/2026B01111452-I1Request digital key ↗
08/24/2026B01111452-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits3
▸BISWORK PERMIT APPLICATION2
11/29/2012320582767Open ↗
11/29/2012320582767Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
09/12/2012320582767Open ↗
▸Seals & Professional Certifications15
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/24/2026B01096225-I1Open ↗
08/24/2026B01111452-P1Open ↗
08/24/2026B01111452-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/25/2026B01111452-I1Open ↗
08/25/2026B01111452-I1Open ↗
08/25/2026B01111452-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/31/2026B01111452-S1Open ↗
08/26/2026B01111452-P1Open ↗
08/25/2026B01111452-I1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
11/29/2012320582767Open ↗
11/29/2012320582767Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
09/12/2012320582767Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/24/2026B01096225-I1Open ↗
08/24/2026B01111452-I1Open ↗
08/24/2026B01111452-P1Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
11/29/2012320582767Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
09/12/2012320582767Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
09/12/2012320582767Open ↗