← Back
Primarily 2 family with 1 store or office
1217 LIBERTY AVENUE
BROOKLYN · BIN 3094134
💬 Discuss this project
1920Year Built
3Stories
S2Building Class
R5Zoning
3,300 sfGross Floor Area
3Units
Rent Stabilized31 Open Violations ▸FDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: RANAPING PROPERTIES LLC · 2,252 sf lot · 1.47 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 12p · 1 filing · 20 docs
Cellar5p · 2 filings · 20 docs
3 jobs · most recent 06/22/2023
General Wiring
FiledStatusContractorScope
06/22/2023Permit IssuedACCURATE ELEC'L CORP.General Wiring
05/13/2022CompleteFIBERTEK DATA & ELEC CORP4 meters, 3 new_meters
01/19/2018CompleteELECTROTEC OF NY ELECL IN—
Building Lifecycle
All (110)Filed (7)Permit Issued (2)Signed Off (1)Violation (60)Inspection (6)Objection (4)Special Inspection (30)
05/14/2026
Special inspection requirement — Exterior lighting power
LESLIE GOOD
05/14/2026
Special inspection requirement — Tenant Protection Plan Compliance
NOEL WONG
05/14/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
NOEL WONG
05/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
NOEL WONG
05/14/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
LESLIE GOOD
05/14/2026
Special inspection requirement — Fenestration air leakage
LESLIE GOOD
05/14/2026
Special inspection requirement — Maintenance information
LESLIE GOOD
05/14/2026
Special inspection requirement — Insulation placement and R values
LESLIE GOOD
05/14/2026
Special inspection requirement — Lighting controls
LESLIE GOOD
05/14/2026
Special inspection requirement — Interior lighting power
LESLIE GOOD
05/14/2026
Special inspection requirement — Fenestration areas
LESLIE GOOD
05/14/2026
Special inspection requirement — Metering
LESLIE GOOD
05/14/2026
Special inspection requirement — Air barrier - visual inspection
LESLIE GOOD
05/11/2026
Objection resolved — Addressed
05/08/2026
Filed — Alteration CO
EXISTING 3 STORY MIXED-USE BUILDING. PROPOSED INTERIOR RENOVATION AT 1st FLOOR TO CONVERT STORE TO ADULT DAYCARE.
B00984870-P7
05/08/2026
Objection raised — Other
05/08/2026
Special inspection requirement — Interior lighting power
LESLIE GOOD
05/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
NOEL WONG
05/08/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
NOEL WONG
05/08/2026
Special inspection requirement — Tenant Protection Plan Compliance
05/08/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
LESLIE GOOD
05/08/2026
Special inspection requirement — Insulation placement and R values
LESLIE GOOD
05/08/2026
Special inspection requirement — Fenestration air leakage
LESLIE GOOD
05/08/2026
Special inspection requirement — Fenestration areas
LESLIE GOOD
05/08/2026
Special inspection requirement — Air barrier - visual inspection
LESLIE GOOD
05/08/2026
Special inspection requirement — Metering
LESLIE GOOD
05/08/2026
Special inspection requirement — Lighting controls
LESLIE GOOD
05/08/2026
Special inspection requirement — Maintenance information
LESLIE GOOD
05/08/2026
Special inspection requirement — Exterior lighting power
LESLIE GOOD
04/24/2026
Violation issued (HPD, closed)
A
04/24/2026
Violation issued (HPD, closed)
A
04/24/2026
Violation issued (HPD, open)
B
04/14/2026
Filed — Alteration CO
EXISTING 3 STORY MIXED-USE BUILDING. PROPOSED INTERIOR RENOVATION AT 1st FLOOR TO CONVERT STORE TO ADULT DAYCARE.
B00984870-P6
04/13/2026
Special inspection requirement — Interior lighting power
LESLIE GOOD
04/13/2026
Special inspection requirement — Tenant Protection Plan Compliance
04/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
NOEL WONG
04/13/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
NOEL WONG
03/19/2026
Filed — Alteration CO
EXISTING 3 STORY MIXED-USE BUILDING. PROPOSED INTERIOR RENOVATION AT 1st FLOOR TO CONVERT STORE TO ADULT DAYCARE.
B00984870-P5
01/27/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/20/2025
Signed off — Alteration
PLUMBING WORK AT 1st FLOOR AS PER PLAN
B00984857-I1
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/30/2025
Filed — Alteration CO
EXISTING 3 STORY MIXED-USE BUILDING. PROPOSED INTERIOR RENOVATION AT 1st FLOOR TO CONVERT STORE TO ADULT DAYCARE.
B00984870-P4
09/29/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/03/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/24/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/21/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/21/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/06/2025
Filed — Alteration CO
EXISTING 3 STORY MIXED-USE BUILDING. PROPOSED INTERIOR RENOVATION AT 1st FLOOR TO CONVERT STORE TO ADULT DAYCARE.
B00984870-P1
01/22/2025
Permit issued — Plumbing
B00984857-I1-PL
10/08/2024
Permit issued — General Construction
B00984870-I1-GC
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/09/2024
Objection resolved — Addressed
06/10/2024
Violation issued (HPD, closed)
B
01/11/2024
Objection raised — Scope
01/05/2024
Filed — Alteration
PLUMBING WORK AT 1st FLOOR AS PER PLAN
B00984857-I1
01/05/2024
Filed — Alteration CO
EXISTING 3 STORY MIXED-USE BUILDING. PROPOSED INTERIOR RENOVATION AT 1st FLOOR TO CONVERT STORE TO ADULT DAYCARE.
B00984870-I1
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Latest 60 of 110 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GREENLINE BLDG CONSULTANTS1009/13/2026
RANAPING PROPERTIES LLC703/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/15/2016$775K—UDDIN BROTHERS LLC → RANAPING PROPERTIES LLC$235/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ADB ASSOCIATES605/08/2026
LESLIE M. GOOD ARCHITECTS101/05/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EMPIRE ERECTORS & ELECTRIElectrical103/21/2026
MORALES, WILLIAMElectrical103/21/2026
L&T CONSULTANTS LLCGeneral Contractor107/08/2026
AL PLUMBING & CONT. INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AURORA BUILDING CONSULTAN9710605/08/2026
ACV DESIGN LTD3864102/06/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAL PLUMBING & CONT. INC01/22/2025
DOB NOWGeneral ConstructionPermit IssuedL&T CONSULTANTS LLC10/08/2024
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
01/27/2026Pass-Final CND-Occupancy InspectionPassView ↗
09/29/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/03/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/24/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/21/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/21/2025Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 53
DateRequirementInspectorRole
05/14/2026Exterior lighting powerLESLIE GOODenergy_progress
05/14/2026Tenant Protection Plan ComplianceNOEL WONGspecial
05/14/2026Structural Stability – Alterations of existing buildingsNOEL WONGspecial
05/14/2026Fire-Resistant Penetrations and JointsNOEL WONGspecial
05/14/2026Fenestration and door U-factor and product ratingsLESLIE GOODenergy_progress
05/14/2026Fenestration air leakageLESLIE GOODenergy_progress
05/14/2026Maintenance informationLESLIE GOODenergy_progress
05/14/2026Insulation placement and R valuesLESLIE GOODenergy_progress
05/14/2026Lighting controlsLESLIE GOODenergy_progress
05/14/2026Interior lighting powerLESLIE GOODenergy_progress
05/14/2026Fenestration areasLESLIE GOODenergy_progress
05/14/2026MeteringLESLIE GOODenergy_progress
05/14/2026Air barrier - visual inspectionLESLIE GOODenergy_progress
05/08/2026Interior lighting powerLESLIE GOODenergy_progress
05/08/2026Fire-Resistant Penetrations and JointsNOEL WONGspecial
05/08/2026Structural Stability – Alterations of existing buildingsNOEL WONGspecial
05/08/2026Tenant Protection Plan Compliance—special
05/08/2026Fenestration and door U-factor and product ratingsLESLIE GOODenergy_progress
05/08/2026Insulation placement and R valuesLESLIE GOODenergy_progress
05/08/2026Fenestration air leakageLESLIE GOODenergy_progress
05/08/2026Fenestration areasLESLIE GOODenergy_progress
05/08/2026Air barrier - visual inspectionLESLIE GOODenergy_progress
05/08/2026MeteringLESLIE GOODenergy_progress
05/08/2026Lighting controlsLESLIE GOODenergy_progress
05/08/2026Maintenance informationLESLIE GOODenergy_progress
Latest 25 of 53.
▾Documents — 45 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/26/2026B00984857-I1Request digital key ↗
08/17/2026B00984870-P1Request digital key ↗
08/17/2026B00984870-P4Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00984870-I1Open ↗
▸Seals & Professional Certifications17
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/17/2026B00984870-I1Open ↗
08/17/2026B00984870-P7Open ↗
08/17/2026B00984870-P6Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026B00984870-I1Open ↗
09/01/2026B00984870-I1Open ↗
09/01/2026B00984870-P7Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026B00984870-I1Open ↗
09/01/2026B00984870-P7Open ↗
08/31/2026B00984870-P5Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist6
08/17/2026B00984870-P1Open ↗
08/17/2026B00984870-P6Open ↗
08/17/2026B00984870-P5Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/17/2026B00984870-P6Open ↗
08/17/2026B00984870-P4Open ↗
08/17/2026B00984870-P1Open ↗
Showing 3 of 7 on file for this type
▸Other Documents7
▸DOB NOWProperty Ownership Certification6
08/17/2026B00984870-P1Open ↗
08/17/2026B00984870-P4Open ↗
08/17/2026B00984870-P6Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWFinal Survey1
08/13/2026B00984870-I1Open ↗