← Back
Converted dwellings or rooming house
412 CHESTNUT STREET
BROOKLYN · BIN 3094262
💬 Discuss this project
1899Year Built
2Stories
C5Building Class
R5BZoning
2,400 sfGross Floor Area
9Units
Rent Stabilized18 Open Violations 16 unresolved · 2 paperwork only ▸FDNY Report ↗
Converted dwellings or rooming house · 2,000 sf lot · 1.2 FAR built · Flood zone X
Locations of Work
Architecture
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 5 docs
Cellar3p · 1 filing · 7 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/29/2015$535K—— → —$223/sf building
10/23/2014$140K—— → —$58/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ARCALHEK309/26/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A&A BUILDING CONSULTANTS INC.603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BT'S PLUMBING AND HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ARCALHEK PC3340209/26/2025
Building Lifecycle
All (48)Filed (3)Permit Issued (3)Signed Off (2)Violation (27)Inspection (5)Objection (6)Special Inspection (2)
03/05/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
11/24/2025
Violation issued (HPD, open)
I
11/03/2025
Permit issued — General Construction
B01282589-I1-GC
10/21/2025
Objection resolved — Addressed
10/21/2025
Objection resolved — Addressed
10/16/2025
Objection raised — Structural
10/16/2025
Objection raised — Other
09/26/2025
Filed — Alteration
Propose work to repair fire damages in exterior stucco (partial front 2nd floor facade) and patch 2 holes on the roof.
B01282589-I1
09/05/2025
Signed off — Alteration
Application file to legalize construction work to repair fire damages in interior of the house. Cellar to be accessory to the first floor with 3 pc bathroom.
B01193271-I1
09/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
RAYMOND CALAMARI
05/15/2025
Signed off — Alteration
Application file to legalize construction work to repair fire damages in interior of the house. Cellar to be accessory to the first floor with 3 pc bathroom.
B01193271-S1
05/15/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
05/12/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/09/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/09/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/07/2025
Permit issued — General Construction
B01193271-I1-GC
04/30/2025
Permit issued — Plumbing
B01193271-S1-PL
03/27/2025
Objection raised — Fire_Protection
03/27/2025
Objection resolved — Addressed
03/25/2025
Filed — Alteration
Application file to legalize construction work to repair fire damages in interior of the house. Cellar to be accessory to the first floor with 3 pc bathroom.
B01193271-I1
03/25/2025
Filed — Alteration
Application file to legalize construction work to repair fire damages in interior of the house. Cellar to be accessory to the first floor with 3 pc bathroom.
B01193271-S1
03/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
RAYMOND CALAMARI
02/11/2025
Violation issued (ECB, open)
Construction
02/11/2025
Violation issued (ECB, open)
Construction
12/03/2024
Violation issued (HPD, open)
I
03/11/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/11/2024
Violation issued (ECB, closed)
Construction
03/11/2024
Violation issued (ECB, closed)
Construction
03/11/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/28/2023
Violation issued (HPD, open)
I
11/17/2022
Violation issued (HPD, open)
I
03/16/2022
Violation issued (HPD, open)
I
04/21/2021
Violation issued (HPD, open)
I
11/07/2019
Violation issued (HPD, open)
I
01/08/2018
Violation issued (HPD, open)
I
10/26/2009
Violation issued (ECB, closed)
Construction
10/26/2009
Violation issued (ECB, closed)
Construction
10/26/2009
Violation issued (ECB, closed)
Construction
10/23/2009
Violation issued (DOB, closed)
VW*-VIOLATION - WORK W/O PERMIT DISMISSED
06/19/2006
Violation issued (HPD, open)
C
06/19/2006
Violation issued (HPD, open)
B
06/19/2006
Violation issued (HPD, open)
B
06/16/2006
Violation issued (HPD, closed)
B
01/10/2006
Violation issued (HPD, open)
B
01/10/2006
Violation issued (HPD, open)
B
01/10/2006
Violation issued (HPD, open)
A
01/10/2006
Violation issued (HPD, open)
A
01/10/2006
Violation issued (HPD, open)
A
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedNot Applicable11/03/2025
DOB NOWGeneral ConstructionSigned-offNot Applicable05/07/2025
DOB NOWPlumbingSigned-offBT'S PLUMBING AND HEATING04/30/2025
1 project · most recent 08/30/2024
FiledStatusContractorScope
08/30/2024Permit IssuedTRINCITY ELECTRIC, INC3 meters, 3 new_meters
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
03/05/2026Fail-Final General Construction Non-Directive 14FailView ↗
05/15/2025Pass-Final General Construction Non-Directive 14PassView ↗
05/12/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/09/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/09/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
09/05/2025Fire-Resistant Penetrations and JointsRAYMOND CALAMARIspecial
03/11/2025Fire-Resistant Penetrations and JointsRAYMOND CALAMARIspecial
▾Documents — 11 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/20/2026B01282589-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWRestrictive Declaration/Easement 12
08/13/2026B01193271-I1Open ↗
08/13/2026B01193271-S1Open ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/20/2026B01282589-I1Open ↗
08/13/2026B01193271-I1Open ↗
08/13/2026B01193271-S1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026B01282589-I1Open ↗
08/26/2026B01193271-S1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/20/2026B01282589-I1Open ↗
08/13/2026B01193271-S1Open ↗
08/13/2026B01193271-I1Open ↗