← Back
Two family brick
261 MILFORD STREET
BROOKLYN · BIN 3095288
💬 Discuss this project
1910Year Built
2Stories
B1Building Class
R5Zoning
1,920 sfGross Floor Area
2Units
1 Open Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Two family brick · 2,000 sf lot · 0.96 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
1 job · most recent 01/21/2024
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
01/21/2024——Heating and Air Conditioning Systems
Heat / Cool
Gree 4LIV09HP230V1AH 9,000 BTU · Heat Pump Outdoor ×9
MULTI36HP230V1EO 36,000 BTU · Condensing Unit ×3
Building Lifecycle
All (7)Filed (1)Violation (1)Special Inspection (5)
01/21/2024
Filed — Alteration
INTERIOR RENOVATION WORK AT EXISTING 2 FAMILY HOUSE AS PER PLAN. REPAIR EXISTING FACADE TO ADDRESS ECB VIOLATION #34542002L. PLUMBING WORK WILL BE FILED SUBSEQUENTLY WITH THIS APPLICATION. NO CHANGE IN USE, EGRESS, OR OCCUPANCY IN THIS APPLICATION.
B00989521-I1
01/12/2024
Special inspection requirement — Mechanical Systems
XIU CHEN
01/12/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIU CHEN
01/12/2024
Special inspection requirement — Final
XIU CHEN
01/12/2024
Special inspection requirement — Energy Code Compliance Inspections
XIU CHEN
01/12/2024
Special inspection requirement — Fire-Resistance Rated Construction
XIU CHEN
09/21/2006
Violation issued (ECB, open)
Construction
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
XC ENGINEERING PC101/21/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
STUDIO HUASHI203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
XC ENGINEERING PC6692101/21/2024
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
01/12/2024Mechanical SystemsXIU CHENspecial
01/12/2024Fire-Resistant Penetrations and JointsXIU CHENspecial
01/12/2024FinalXIU CHENprogress
01/12/2024Energy Code Compliance InspectionsXIU CHENprogress
01/12/2024Fire-Resistance Rated ConstructionXIU CHENprogress
▾Documents — 5 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/26/2026B00989521-I1Request digital key ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026B00989521-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/02/2026B00989521-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/02/2026B00989521-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B00989521-I1Open ↗