← Back
One family attached or semi-detached
706 VERMONT STREET
BROOKLYN · BIN 3096576
💬 Discuss this project
1920Year Built
2Stories
A5Building Class
R6Zoning
966 sfGross Floor Area
1Units
Rent Stabilized75 Open Violations 72 unresolved · 3 paperwork only ▸FDNY Report ↗
One family attached or semi-detached · 1,583 sf lot · 0.61 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Permit Issued — active, not yet Signed-off
Floor 21p · 1 filing · 4 docs
Floor 1
CellarUnder Construction14p · 3 filings · 16 docs
1 job · most recent 03/02/2026
Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/02/2026——Heating Systems, Ventilation Systems
Heating
Atlas ×3
Ventilation
Broan BROAN EXHAUST FAN Model # BR 509 862 CFM · Exhaust Fan ×2
1 job · most recent 08/26/2024
Gas Water/Sanitary
FiledStatusContractorScope
08/26/2024——Gas, Water/Sanitary
1 job · most recent 08/14/2025
General Wiring
FiledStatusContractorScope
08/14/2025Permit IssuedK.N.C ELECTRIC INCGeneral Wiring
1 job · most recent 10/11/2024
Wood
FiledStatusContractorScope
10/11/2024Permit IssuedVISION 21 INCWood
Building Lifecycle
All (119)Filed (5)Permit Issued (3)Signed Off (1)Violation (60)Objection (32)Special Inspection (18)
09/22/2026
Permit issued — Structural
B00904766-I1-GC
05/09/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
05/09/2026
Special inspection requirement — HVAC-R and service water heating system controls
05/09/2026
Special inspection requirement — HVAC-R and service water heating equipment
05/06/2026
Objection resolved — Resolved
05/06/2026
Objection resolved — Resolved
05/05/2026
Objection resolved — Resolved
05/05/2026
Objection resolved — Resolved
05/05/2026
Objection resolved — Resolved
05/05/2026
Objection resolved — Resolved
05/05/2026
Objection resolved — Resolved
03/03/2026
Objection raised — Fire_Protection
03/03/2026
Objection raised — Structural
03/03/2026
Objection raised — Structural
03/03/2026
Objection raised — Plumbing
03/03/2026
Objection raised — Energy
03/03/2026
Objection raised — Scope
03/03/2026
Objection raised — Scope
03/03/2026
Objection raised — Admin
03/03/2026
Objection raised — Scope
03/02/2026
Filed — Alteration CO
PROPOSE TO CONVERT EXISTING ONE FAMILY TO FAMILY DWELLING UNIT.INSTALL PARTITIONS, COUNTERS, NEW FLOORING AND PAINTING OF CELLAR,1ST AND 2ND fLOOR
B01341378-I1
02/03/2026
Special inspection requirement — Air barrier - visual inspection
02/03/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
02/03/2026
Special inspection requirement — Lighting in dwelling units
02/03/2026
Special inspection requirement — Interior lighting power
12/31/2025
Special inspection requirement — Mechanical Systems
12/31/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
12/31/2025
Special inspection requirement — Final
11/24/2025
Violation issued (HPD, open)
I
10/21/2025
Permit issued — General Construction
B00904766-I1-GC
02/02/2025
Objection resolved — Addressed
01/21/2025
Objection resolved — Addressed
12/20/2024
Objection resolved — Addressed
12/03/2024
Violation issued (HPD, open)
I
11/18/2024
Objection raised — Other
11/18/2024
Objection raised — Zoning
11/11/2024
Objection resolved — Addressed
10/21/2024
Objection raised — Other
10/11/2024
Filed — Alteration
PROPOSE TO LEGALIZE 3 PIECE BATHROOM IN CELLAR,REPLACE BEAMS DUE TI FIRE DAMAGE AND RENOVATE 1FT FLOOR AND 2ND FLOOR ,INSTALL PARTITIONS AND FLOORING AS PER PLANS. REMOVE ADDITIONAL BATHROOM ON 2ND FLOOR NO CHANGE IN USE,EGRESS OR OCCUPANCY
B00904766-P1
10/11/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
10/11/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Younes Abouyaala
10/11/2024
Special inspection requirement — Final
NAVEEN KUMAR
10/11/2024
Special inspection requirement — Lighting in dwelling units
Younes Abouyaala
10/11/2024
Special inspection requirement — Air barrier - visual inspection
Younes Abouyaala
10/11/2024
Special inspection requirement — Insulation placement and R values
Younes Abouyaala
09/07/2024
Objection resolved — Addressed
09/07/2024
Objection resolved — Addressed
09/07/2024
Objection resolved — Addressed
09/03/2024
Objection raised — Other
09/03/2024
Objection raised — Energy
09/03/2024
Objection raised — Admin
09/03/2024
Objection raised — Admin
08/26/2024
Filed — Alteration
PROPOSE TO LEGALIZE 3 PIECE BATHROOM I,INSTALL NEW HOT WATER HEATER AND BOILER IN CELLAR,REPLACE KITCHEN SINK AND 4 BURNER GAS STOVE ON 1ST FLOOR ON EXISTING RISER.REPLACE 3 PIECE BATHROOM ON 2ND FLOOR ON EXISTING RISER.
B00904776-I1
07/31/2024
Signed off — Alteration
B08039835-I1
06/12/2024
Objection resolved — Addressed
02/12/2024
Permit issued — Structural
B08039835-I1-ST
11/28/2023
Violation issued (HPD, open)
I
11/21/2023
Objection raised — Other
11/14/2023
Filed — Alteration
PROPOSE TO LEGALIZE 3 PIECE BATHROOM IN CELLAR,REPLACE BEAMS DUE TI FIRE DAMAGE AND RENOVATE 1FT FLOOR AND 2ND FLOOR ,INSTALL PARTITIONS AND FLOORING AS PER PLANS. REMOVE ADDITIONAL BATHROOM ON 2ND FLOOR NO CHANGE IN USE,EGRESS OR OCCUPANCY
B00904766-I1
07/15/2023
Special inspection requirement — Tenant Protection Plan Compliance
Latest 60 of 119 events.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RLD3 ENGINEERING PLLC103/02/2026
NYRON HALL ENGINEERING LLC310/11/2024
F.P.VILLANO CONSULTING ENGINEER LLC101/06/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DAY72 BUILDING CONSULTANT103/21/2026
NOEL BUILDING CONSULTING INC803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
VISION 21 INCGeneral Contractor509/23/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519210/11/2024
FP VILLANO CONSULTING ENG8575101/06/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedVISION 21 INC09/22/2026
DOB NOWGeneral ConstructionPermit IssuedVISION 21 INC10/21/2025
DOB NOWStructuralSigned-offVISION 21 INC02/12/2024
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
05/09/2026HVAC-R and service water piping design and insulation—energy_progress
05/09/2026HVAC-R and service water heating system controls—energy_progress
05/09/2026HVAC-R and service water heating equipment—energy_progress
02/03/2026Air barrier - visual inspection—energy_progress
02/03/2026Fenestration and door U-factor and product ratings—energy_progress
02/03/2026Lighting in dwelling units—energy_progress
02/03/2026Interior lighting power—energy_progress
12/31/2025Mechanical Systems—special
12/31/2025Structural Stability – Alterations of existing buildings—special
12/31/2025Final—progress
10/11/2024Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
10/11/2024Fenestration and door U-factor and product ratingsYounes Abouyaalaenergy_progress
10/11/2024FinalNAVEEN KUMARprogress
10/11/2024Lighting in dwelling unitsYounes Abouyaalaenergy_progress
10/11/2024Air barrier - visual inspectionYounes Abouyaalaenergy_progress
10/11/2024Insulation placement and R valuesYounes Abouyaalaenergy_progress
07/15/2023Tenant Protection Plan Compliance—special
07/15/2023Fire-Resistant Penetrations and Joints—special
▾Documents — 18 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/28/2026B08039835-I1Request digital key ↗
08/23/2026B00904766-I1Request digital key ↗
08/15/2026B00904776-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/28/2026B08039835-I1Open ↗
08/23/2026B00904766-I1Open ↗
08/18/2026B01341378-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/23/2026B00904766-P1Open ↗
08/23/2026B00904766-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026B00904766-P1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/15/2026B01341378-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/23/2026B00904766-I1Open ↗
08/13/2026B00904776-I1Open ↗
08/13/2026B00904766-P1Open ↗
▸Other Documents1
▸DOB NOWProperty Ownership Certification1
08/15/2026B01341378-I1Open ↗