1930Year Built
2Stories
B1Building Class
R6Zoning
2,400 sfGross Floor Area
2Units
18 Open Violations 17 unresolved · 1 paperwork only ▸FDNY Report ↗
Two family brick · 2,518 sf lot · 0.95 FAR built · Flood zone X500
Locations of Work
ArchitectureMechanicalFire Protection
Permit Issued — active, not yet Signed-off
Floor 2Under Construction2p · 1 filing · 20 docs
Floor 1Under Construction1p · 1 filing · 20 docs
BasementUnder Construction2p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ADB ASSOCIATES409/17/2026
VASILIOS ARTEMIOU PE101/11/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYC DESIGN FILE403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BH GENERAL CONTRACTING INGeneral Contractor105/29/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SHAHRISH SHUVO ENGINEERIN8524309/17/2026
Building Lifecycle
All (100)Filed (5)Permit Issued (1)Violation (22)Objection (42)Special Inspection (30)
09/17/2026
Filed — Alteration CO
Filing to install mechanical system subsequent to primary approved application B00939795-I1
B00939795-P1
09/16/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
09/15/2026
Special inspection requirement — Air barrier - visual inspection
Shahrish Shuvo
09/15/2026
Special inspection requirement — Interior lighting power
Shahrish Shuvo
09/15/2026
Special inspection requirement — Metering
Shahrish Shuvo
09/15/2026
Special inspection requirement — Permanent certificate
Shahrish Shuvo
09/15/2026
Special inspection requirement — Maintenance information
Shahrish Shuvo
09/15/2026
Special inspection requirement — Fenestration areas
Shahrish Shuvo
09/15/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Shahrish Shuvo
09/15/2026
Special inspection requirement — Insulation placement and R values
Shahrish Shuvo
09/15/2026
Special inspection requirement — Fire-Resistance Rated Construction
Shahrish Shuvo
09/15/2026
Special inspection requirement — Energy Code Compliance Inspections
Shahrish Shuvo
09/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
09/15/2026
Special inspection requirement — Fenestration air leakage
Shahrish Shuvo
09/15/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Shahrish Shuvo
05/28/2026
Permit issued — General Construction
B00939795-I1-GC
04/29/2026
Violation issued (HPD, open)
B
04/29/2026
Violation issued (HPD, closed)
C
04/29/2026
Violation issued (HPD, open)
B
04/29/2026
Violation issued (HPD, open)
A
04/28/2026
Violation issued (HPD, closed)
C
04/10/2026
Violation issued (HPD, open)
B
04/10/2026
Violation issued (HPD, open)
B
09/02/2025
Violation issued (HPD, open)
I
08/30/2025
Violation issued (HPD, closed)
C
08/30/2025
Violation issued (HPD, open)
B
08/30/2025
Violation issued (HPD, open)
B
08/30/2025
Violation issued (HPD, open)
B
08/30/2025
Violation issued (HPD, open)
B
08/30/2025
Violation issued (HPD, open)
B
04/10/2024
Objection resolved — Addressed
03/18/2024
Objection resolved — Addressed
02/26/2024
Objection resolved — Addressed
02/20/2024
Objection resolved — Addressed
02/20/2024
Objection resolved — Addressed
02/20/2024
Objection resolved — Addressed
02/20/2024
Objection resolved — Addressed
02/20/2024
Objection resolved — Addressed
02/16/2024
Objection raised — Zoning
02/16/2024
Objection raised — Fire_Protection
02/16/2024
Objection raised — Scope
02/16/2024
Objection raised — Energy
02/14/2024
Objection resolved — Addressed
02/13/2024
Objection raised — Fire_Protection
02/13/2024
Objection raised — Energy
02/13/2024
Objection raised — Scope
02/13/2024
Objection raised — Other
02/12/2024
Objection raised — Scope
02/12/2024
Objection resolved — Addressed
02/12/2024
Objection resolved — Addressed
02/09/2024
Filed — Alteration CO
Filing to install mechanical system subsequent to primary approved application B00939795-I1
B00939795-S1
02/09/2024
Filed — Alteration CO
Filing to install mechanical system subsequent to primary approved application B00939795-I1
B00939795-S2
02/08/2024
Special inspection requirement — Maintenance information
02/08/2024
Special inspection requirement — Permanent certificate
Shahrish Shuvo
02/08/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
02/08/2024
Special inspection requirement — Heating Systems
Shahrish Shuvo
02/08/2024
Special inspection requirement — Post-installed Anchors
Shahrish Shuvo
02/08/2024
Special inspection requirement — Fire-Resistance Rated Construction
02/08/2024
Special inspection requirement — HVAC-R and service water heating system controls
Shahrish Shuvo
02/08/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Shahrish Shuvo
Latest 60 of 100 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedBH GENERAL CONTRACTING IN05/28/2026
1 project · most recent 09/17/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/17/2026Permit IssuedBH GENERAL CONTRACTING INHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin RXS12LVJU 60,000 BTU · Heat Pump Outdoor ×10
2MXS18NMVJUA 54,000 BTU · Heat Pump Outdoor ×6
Ventilation
Nutone AEN110 50 CFM · Exhaust Fan ×16
QTXEN150 100 CFM · Kitchen Exhaust ×16
1 project · most recent 09/17/2026
Sprinkler System
FiledStatusContractorScope
09/17/2026——Sprinkler System
1 project · most recent 09/17/2026
Water/Sanitary
FiledStatusContractorScope
09/17/2026——Water/Sanitary
1 project · most recent 09/17/2026
Wood
FiledStatusContractorScope
09/17/2026Permit IssuedBH GENERAL CONTRACTING INWood
▾Special Inspection Requirements (DOB NOW) — 47
DateRequirementInspectorRole
09/16/2026Structural Stability – Alterations of existing buildings—special
09/15/2026Air barrier - visual inspectionShahrish Shuvoenergy_progress
09/15/2026Interior lighting powerShahrish Shuvoenergy_progress
09/15/2026MeteringShahrish Shuvoenergy_progress
09/15/2026Permanent certificateShahrish Shuvoenergy_progress
09/15/2026Maintenance informationShahrish Shuvoenergy_progress
09/15/2026Fenestration areasShahrish Shuvoenergy_progress
09/15/2026Fenestration and door U-factor and product ratingsShahrish Shuvoenergy_progress
09/15/2026Insulation placement and R valuesShahrish Shuvoenergy_progress
09/15/2026Fire-Resistance Rated ConstructionShahrish Shuvoprogress
09/15/2026Energy Code Compliance InspectionsShahrish Shuvoprogress
09/15/2026Fire-Resistant Penetrations and JointsShahrish Shuvospecial
09/15/2026Fenestration air leakageShahrish Shuvoenergy_progress
09/15/2026Exterior Insulation and Finish Systems (EIFS)Shahrish Shuvospecial
02/08/2024Maintenance information—energy_progress
02/08/2024Permanent certificateShahrish Shuvoenergy_progress
02/08/2024Fire-Resistant Penetrations and JointsShahrish Shuvospecial
02/08/2024Heating SystemsShahrish Shuvospecial
02/08/2024Post-installed AnchorsShahrish Shuvospecial
02/08/2024Fire-Resistance Rated Construction—progress
02/08/2024HVAC-R and service water heating system controlsShahrish Shuvoenergy_progress
02/08/2024HVAC-R and service water piping design and insulationShahrish Shuvoenergy_progress
02/08/2024HVAC-R and service water heating equipmentShahrish Shuvoenergy_progress
02/08/2024Maintenance informationShahrish Shuvoenergy_progress
02/08/2024Fire-Resistant Penetrations and Joints—special
Latest 25 of 47.
▾Documents — 33 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/15/2026B00939795-S1Request digital key ↗
08/15/2026B00939795-I1Request digital key ↗
08/14/2026B00939795-S3Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications24
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/22/2026B00939795-P3Open ↗
09/22/2026B00939795-P4Open ↗
09/22/2026B00939795-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/23/2026B00939795-P4Open ↗
09/23/2026B00939795-P3Open ↗
09/23/2026B00939795-P3Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/23/2026B00939795-P1Open ↗
09/23/2026B00939795-P4Open ↗
09/23/2026B00939795-P2Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/22/2026B00939795-P1Open ↗
09/22/2026B00939795-S4Open ↗
08/15/2026B00939795-I1Open ↗
▸Other Documents2
▸DOB NOWProperty Ownership Certification2
09/22/2026B00939795-P1Open ↗
08/15/2026B00939795-I1Open ↗