← Back
One story - permanent living quarter
670 PINE STREET
BROOKLYN · BIN 3098540
💬 Discuss this project
1940Year Built
1Stories
A2Building Class
R5Zoning
720 sfGross Floor Area
1Units
One story - permanent living quarter · 3,000 sf lot · 0.24 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralLandscape
Roof1p · 1 filing · 14 docs
Floor 41p · 1 filing · 13 docs
Floor 3
Floor 21p · 2 filings · 20 docs
Floor 12p · 2 filings · 20 docs
Cellar7p · 2 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ALICO DESIGN AND CONSTRUCTION MANAG103/19/2026
ARC-HI-TECT ASSOCIATE INC211/04/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARCHITECTURAL DESIGN SOLUTIONS103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ARC-HI-TECH ASSOCIATES IN6963211/04/2025
Building Lifecycle
All (61)Filed (3)Objection (28)Special Inspection (30)
07/23/2026
Special inspection requirement — Maintenance information
07/22/2026
Objection resolved — Addressed
07/22/2026
Objection resolved — Addressed
07/22/2026
Objection resolved — Addressed
07/22/2026
Objection resolved — Resolved
07/22/2026
Special inspection requirement — Fenestration areas
07/22/2026
Special inspection requirement — Electric vehicle service equipment requirements
07/20/2026
Special inspection requirement — Masonry
07/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/19/2026
Special inspection requirement — Subgrade Inspections
06/12/2026
Objection raised — Scope
06/12/2026
Objection raised — Scope
06/12/2026
Objection raised — Scope
06/12/2026
Objection raised — Scope
06/12/2026
Objection raised — Scope
06/12/2026
Objection raised — Scope
06/12/2026
Objection raised — Scope
06/12/2026
Objection raised — Cost
06/12/2026
Objection raised — Scope
06/12/2026
Objection raised — Scope
06/05/2026
Special inspection requirement — Metering
05/20/2026
Special inspection requirement — Concrete - Cast-In-Place
05/20/2026
Special inspection requirement — Energy Code Compliance Inspections
05/20/2026
Special inspection requirement — Fire-Resistance Rated Construction
05/20/2026
Special inspection requirement — Structural Wood Frame
05/20/2026
Special inspection requirement — Air barrier - visual inspection
05/20/2026
Special inspection requirement — Insulation placement and R values
04/10/2026
Objection resolved — Open
04/08/2026
Objection raised — Scope
04/03/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
04/03/2026
Special inspection requirement — Permanent certificate
04/03/2026
Special inspection requirement — Interior lighting power
03/19/2026
Filed — Alteration CO
TO PROPOSE HORIZONTAL AND VERTICAL EXTENSION FOR EXISTING ONE FAMILY HOUSE CONVERT 2 FAMILY DWELLING UNIT WITH GENERAL CONSTRUCTION AND PLUMBING WORKS AS PER PLAN FILED HEREWITH OBTAIN NEW CERTIFICATE OF OCCUPANCY.
B01372057-I1
03/13/2026
Special inspection requirement — Footing and Foundation
03/13/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
03/13/2026
Special inspection requirement — Final
02/27/2026
Objection raised — Scope
01/08/2026
Objection resolved — Addressed
01/08/2026
Objection resolved — Addressed
12/22/2025
Objection resolved — Addressed
12/22/2025
Objection resolved — Addressed
12/10/2025
Objection resolved — Addressed
12/02/2025
Objection raised — Scope
12/02/2025
Objection raised — Scope
11/13/2025
Objection raised — Scope
11/13/2025
Objection raised — Scope
11/13/2025
Objection raised — Scope
11/13/2025
Objection raised — Scope
11/04/2025
Filed — Alteration CO
Plumbing work conjunction with GC application.
B00561597-P1
10/31/2025
Special inspection requirement — Insulation placement and R values
IGOR LISOVENKO
10/31/2025
Special inspection requirement — Fenestration air leakage
IGOR LISOVENKO
10/31/2025
Special inspection requirement — Concrete - Cast-In-Place
IGOR LISOVENKO
10/31/2025
Special inspection requirement — Protection of exposed foundation insulation
IGOR LISOVENKO
10/31/2025
Special inspection requirement — Lighting in dwelling units
IGOR LISOVENKO
10/31/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
IGOR LISOVENKO
10/31/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
IGOR LISOVENKO
10/31/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
IGOR LISOVENKO
10/31/2025
Special inspection requirement — Masonry
IGOR LISOVENKO
10/31/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
10/31/2025
Special inspection requirement — Subgrade Inspections
IGOR LISOVENKO
Latest 60 of 61 events.
Nothing on file for this building.
1 project · most recent 03/19/2026
Concrete Masonry
FiledStatusContractorScope
03/19/2026——Concrete, Masonry
▾Special Inspection Requirements (DOB NOW) — 42
DateRequirementInspectorRole
07/23/2026Maintenance information—energy_progress
07/22/2026Fenestration areas—energy_progress
07/22/2026Electric vehicle service equipment requirements—energy_progress
07/20/2026Masonry—special
07/19/2026Fire-Resistant Penetrations and Joints—special
07/19/2026Subgrade Inspections—special
06/05/2026Metering—energy_progress
05/20/2026Concrete - Cast-In-Place—special
05/20/2026Energy Code Compliance Inspections—progress
05/20/2026Fire-Resistance Rated Construction—progress
05/20/2026Structural Wood Frame—progress
05/20/2026Air barrier - visual inspection—energy_progress
05/20/2026Insulation placement and R values—energy_progress
04/03/2026Fenestration and door U-factor and product ratings—energy_progress
04/03/2026Permanent certificate—energy_progress
04/03/2026Interior lighting power—energy_progress
03/13/2026Footing and Foundation—progress
03/13/2026Structural Stability – Alterations of existing buildings—special
03/13/2026Final—progress
10/31/2025Insulation placement and R valuesIGOR LISOVENKOenergy_progress
10/31/2025Fenestration air leakageIGOR LISOVENKOenergy_progress
10/31/2025Concrete - Cast-In-PlaceIGOR LISOVENKOspecial
10/31/2025Protection of exposed foundation insulationIGOR LISOVENKOenergy_progress
10/31/2025Lighting in dwelling unitsIGOR LISOVENKOenergy_progress
10/31/2025Excavations - Sheeting, Shoring, and BracingIGOR LISOVENKOspecial
Latest 25 of 42.
▾Documents — 27 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/20/2026B00561597-I1Request digital key ↗
08/17/2026B01372057-I1Request digital key ↗
08/14/2026B00561597-P1Request digital key ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram2
08/17/2026B01372057-I1Open ↗
08/13/2026B01372057-I1Open ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/20/2026B00561597-P1Open ↗
08/20/2026B00561597-I1Open ↗
08/17/2026B01372057-I1Open ↗
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/20/2026B00561597-I1Open ↗
08/14/2026B00561597-P1Open ↗
08/13/2026B01372057-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/20/2026B00561597-I1Open ↗
08/17/2026B01372057-I1Open ↗
08/14/2026B00561597-P1Open ↗
▸Inspections & Test Reports1
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026B01372057-I1Open ↗
▸Other Documents12
▸DOB NOWSite Survey: Initial3
08/17/2026B01372057-I1Open ↗
08/13/2026B01372057-I1Open ↗
08/13/2026B00561597-P1Open ↗
▸DOB NOWPlot Diagram3
08/13/2026B00561597-P1Open ↗
08/13/2026B01372057-I1Open ↗
08/13/2026B00561597-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/17/2026B01372057-I1Open ↗
08/13/2026B00561597-P1Open ↗
08/13/2026B00561597-I1Open ↗
▸DOB NOWFinal Survey2
08/13/2026B00561597-I1Open ↗
08/13/2026B01372057-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/17/2026B01372057-I1Open ↗