Two family brick
236 EAST 91 STREET
BROOKLYN · BIN 3100389
💬 Discuss this project
1930Year Built
2Stories
B1Building Class
R6Zoning
3,360 sfGross Floor Area
2Units
Rent StabilizedFDNY Report ↗
Two family brick · Owner of record: 236 EAST 91 LLC · 2,483 sf lot · 1.35 FAR built · Flood zone X
Locations of Work
ArchitectureFire Protection
Roof4p · 1 filing · 20 docs
Floor 27p · 1 filing · 20 docs
Floor 14p · 1 filing · 20 docs
Basement6p · 1 filing · 20 docs
1 job · most recent 04/04/2025
Gas Water/Sanitary
FiledStatusContractorScope
04/04/2025Signed-offNESS MECHANICAL P & H INCGas, Water/Sanitary
1 job · most recent 02/25/2025
General Wiring
FiledStatusContractorScope
02/25/2025CompleteS&R ELECTRICAL & MECHANICGeneral Wiring
Building Lifecycle
All (78)Filed (5)Permit Issued (4)Signed Off (4)Inspection (10)Objection (30)Special Inspection (25)
07/09/2025
Signed off — Alteration CO
SPRINKLER APPLICATION FILED HEREWITH IN CONJUNCTION TO ALT-CO APPLICATION # B01081396-I1
B01081396-I1
05/29/2025
Signed off — Alteration CO
SPRINKLER APPLICATION FILED HEREWITH IN CONJUNCTION TO ALT-CO APPLICATION # B01081396-I1
B01081396-S1
05/09/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
05/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
05/09/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
05/09/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
05/09/2025
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
05/09/2025
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
05/05/2025
Objection resolved — Addressed
05/02/2025
Objection raised — Cost
04/30/2025
Signed off — Alteration CO
SPRINKLER APPLICATION FILED HEREWITH IN CONJUNCTION TO ALT-CO APPLICATION # B01081396-I1
B01081396-S3
04/29/2025
Objection resolved — Addressed
04/28/2025
Signed off — Alteration CO
SPRINKLER APPLICATION FILED HEREWITH IN CONJUNCTION TO ALT-CO APPLICATION # B01081396-I1
B01081396-S2
04/28/2025
Objection raised — Scope
04/25/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/23/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/10/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/04/2025
Filed — Alteration CO
SPRINKLER APPLICATION FILED HEREWITH IN CONJUNCTION TO ALT-CO APPLICATION # B01081396-I1
B01081396-P1
04/03/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
04/03/2025
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
04/03/2025
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
04/03/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
04/03/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
04/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
03/17/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/11/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/11/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/06/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/25/2025
Permit issued — Sprinklers
B01081396-S3-EW-SP
02/25/2025
Permit issued — Plumbing
B01081396-S1-PL
02/21/2025
Permit issued — Mechanical Systems
B01081396-S2-MS
02/20/2025
Permit issued — General Construction
B01081396-I1-GC
02/04/2025
Objection resolved — Addressed
09/09/2024
Filed — Alteration CO
SPRINKLER APPLICATION FILED HEREWITH IN CONJUNCTION TO ALT-CO APPLICATION # B01081396-I1
B01081396-S3
09/09/2024
Filed — Alteration CO
SPRINKLER APPLICATION FILED HEREWITH IN CONJUNCTION TO ALT-CO APPLICATION # B01081396-I1
B01081396-S2
09/09/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/06/2024
Filed — Alteration CO
SPRINKLER APPLICATION FILED HEREWITH IN CONJUNCTION TO ALT-CO APPLICATION # B01081396-I1
B01081396-S1
09/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
09/05/2024
Special inspection requirement — Post-installed Anchors
FAHAD FATEH
09/04/2024
Objection resolved — Addressed
08/27/2024
Objection raised — Other
08/20/2024
Objection resolved — Addressed
08/20/2024
Objection resolved — Addressed
08/19/2024
Objection resolved — Addressed
08/07/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/01/2024
Objection resolved — Addressed
08/01/2024
Objection resolved — Addressed
08/01/2024
Objection resolved — Addressed
07/31/2024
Objection resolved — Addressed
07/31/2024
Objection resolved — Addressed
07/31/2024
Objection resolved — Addressed
07/31/2024
Objection resolved — Addressed
07/30/2024
Objection resolved — Addressed
07/26/2024
Objection raised — Fire_Protection
07/26/2024
Objection raised — Zoning
07/26/2024
Objection raised — Zoning
07/26/2024
Objection raised — Other
07/26/2024
Objection raised — Fire_Protection
07/26/2024
Objection raised — Zoning
07/26/2024
Objection raised — Accessibility
Latest 60 of 78 events.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/30/2024$925K—Private party → 236 EAST 91 LLC$275/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
XPDITE GROUP LLC404/04/2025
VASILIOS ARTEMIOU PE109/09/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
XPDITE GROUP LLC (104)503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MJH CONSTRUCTION CORPGeneral Contractor307/08/2026
QUALITY PIPING, INCFire Protection107/08/2026
NESS MECHANICAL P & H INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616504/04/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offQUALITY PIPING, INC02/25/2025
DOB NOWPlumbingSigned-offNESS MECHANICAL P & H INC02/25/2025
DOB NOWMechanical SystemsSigned-offMJH CONSTRUCTION CORP02/21/2025
DOB NOWGeneral ConstructionPermit IssuedMJH CONSTRUCTION CORP02/20/2025
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
04/25/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/23/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/10/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/17/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/11/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/11/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/06/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/09/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/07/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/16/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
05/09/2025Maintenance informationFAHAD FATEHenergy_progress
05/09/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
05/09/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
05/09/2025HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
05/09/2025HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
05/09/2025HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
04/03/2025HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
04/03/2025HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
04/03/2025HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
04/03/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
04/03/2025Maintenance informationFAHAD FATEHenergy_progress
04/03/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
09/05/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
09/05/2024Post-installed AnchorsFAHAD FATEHspecial
07/26/2024Sprinkler SystemsFAHAD FATEHspecial
07/16/2024Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
07/16/2024Energy Code Compliance InspectionsFAHAD FATEHprogress
07/16/2024Fire-Resistance Rated ConstructionFAHAD FATEHprogress
07/16/2024Fenestration air leakageFAHAD FATEHenergy_progress
07/16/2024Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
07/16/2024Fenestration areasFAHAD FATEHenergy_progress
07/16/2024Interior lighting powerFAHAD FATEHenergy_progress
07/16/2024Maintenance informationFAHAD FATEHenergy_progress
07/16/2024Air barrier - visual inspectionFAHAD FATEHenergy_progress
07/16/2024MeteringFAHAD FATEHenergy_progress
▾Documents — 23 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/22/2026B01081396-S3Contact architect ↗
08/22/2026B01081396-S2Contact architect ↗
08/22/2026B01081396-S1Contact architect ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B01081396-I1Open ↗
▸Seals & Professional Certifications15
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026B01081396-P1Open ↗
09/01/2026B01081396-P1Open ↗
08/28/2026B01081396-S1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/22/2026B01081396-P1Open ↗
08/22/2026B01081396-S3Open ↗
08/22/2026B01081396-S2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026B01081396-P1Open ↗
08/28/2026B01081396-S1Open ↗
08/27/2026B01081396-I1Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026B01081396-I1Open ↗
▸Other Documents1
▸DOB NOWProperty Ownership Certification1
08/22/2026B01081396-I1Open ↗