← Back
Four families
237 EAST 94 STREET
BROOKLYN · BIN 3100633
💬 Discuss this project
1931Year Built
2Stories
C3Building Class
R6Zoning
3,280 sfGross Floor Area
4Units
Rent Stabilized22 Open Violations 20 unresolved · 2 paperwork only ▸FDNY Report ↗
Four families · 2,500 sf lot · 1.31 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 210p · 1 filing · 20 docs
Floor 19p · 1 filing · 20 docs
Basement15p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TAQWA REALTY INVESTMENT907/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TSL ARCHITECT,P.C.510/24/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NOEL BUILDING CONSULTING INC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A.N.C. CONTRACTING CO.,INGeneral Contractor107/08/2026
AMM GEN'L CONTRACTING INCPlumbing107/08/2026
PROCORE MECHANICAL CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519410/24/2024
Building Lifecycle
All (85)Filed (5)Permit Issued (3)Signed Off (1)Violation (60)Inspection (6)Special Inspection (10)
05/04/2026
Violation issued (HPD, closed)
A
04/22/2026
Signed off — Alteration CO
Please update the plan to reflect the replacement of the gas stove with an electric one in the basement unit and the addition of a wall-mounted HVAC split system. This application will not require any new gas installations.
B00777399-S1
03/31/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/18/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/13/2026
Violation issued (HPD, open)
C
03/13/2026
Violation issued (HPD, open)
C
12/26/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/22/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/27/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/09/2025
Violation issued (HPD, closed)
A
05/21/2025
Permit issued — Plumbing
B00777399-S1-PL
10/25/2024
Special inspection requirement — Maintenance information
TAI LAWAL
10/25/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
10/24/2024
Filed — Alteration CO
Please update the plan to reflect the replacement of the gas stove with an electric one in the basement unit and the addition of a wall-mounted HVAC split system. This application will not require any new gas installations.
B00777399-P3
10/02/2024
Filed — Alteration CO
Please update the plan to reflect the replacement of the gas stove with an electric one in the basement unit and the addition of a wall-mounted HVAC split system. This application will not require any new gas installations.
B00777399-P2
08/30/2024
Special inspection requirement — Maintenance information
TAI LAWAL
08/30/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
11/17/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/06/2023
Permit issued — Plumbing
B00777399-S1-PL
06/18/2023
Filed — Alteration CO
Please update the plan to reflect the replacement of the gas stove with an electric one in the basement unit and the addition of a wall-mounted HVAC split system. This application will not require any new gas installations.
B00777399-S1
06/15/2023
Violation issued (HPD, closed)
B
06/15/2023
Violation issued (HPD, closed)
C
06/15/2023
Violation issued (HPD, closed)
C
06/15/2023
Violation issued (HPD, open)
C
06/15/2023
Violation issued (HPD, open)
C
06/15/2023
Violation issued (HPD, open)
C
06/15/2023
Violation issued (HPD, closed)
B
06/15/2023
Violation issued (HPD, closed)
C
06/15/2023
Violation issued (HPD, closed)
B
04/18/2023
Permit issued — General Construction
B00777399-I1-GC-CX
04/11/2023
Special inspection requirement — Final
TAI LAWAL
04/11/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
04/11/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
04/07/2023
Filed — Alteration CO
Please update the plan to reflect the replacement of the gas stove with an electric one in the basement unit and the addition of a wall-mounted HVAC split system. This application will not require any new gas installations.
B00777399-P1
04/07/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
04/07/2023
Special inspection requirement — Final
TAI LAWAL
04/07/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
03/22/2023
Violation issued (HPD, closed)
A
11/07/2022
Violation issued (HPD, closed)
I
08/11/2022
Filed — Alteration CO
Please update the plan to reflect the replacement of the gas stove with an electric one in the basement unit and the addition of a wall-mounted HVAC split system. This application will not require any new gas installations.
B00777399-I1
02/24/2022
Violation issued (HPD, closed)
I
02/24/2022
Violation issued (HPD, closed)
A
07/01/2021
Violation issued (HPD, open)
A
07/01/2021
Violation issued (HPD, closed)
B
07/01/2021
Violation issued (HPD, open)
A
07/01/2021
Violation issued (HPD, open)
A
04/08/2021
Violation issued (HPD, closed)
A
06/14/2018
Violation issued (HPD, closed)
B
06/14/2018
Violation issued (HPD, closed)
B
06/14/2018
Violation issued (HPD, closed)
A
06/14/2018
Violation issued (HPD, closed)
A
06/14/2018
Violation issued (HPD, closed)
B
05/23/2018
Violation issued (HPD, open)
A
05/23/2018
Violation issued (HPD, open)
A
05/23/2018
Violation issued (HPD, open)
A
01/27/2017
Violation issued (HPD, closed)
B
01/27/2017
Violation issued (HPD, closed)
B
01/27/2017
Violation issued (HPD, closed)
A
01/27/2017
Violation issued (HPD, closed)
B
01/27/2017
Violation issued (HPD, closed)
B
Latest 60 of 85 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offPROCORE MECHANICAL CORP05/21/2025
DOB NOWPlumbingSigned-offAMM GEN'L CONTRACTING INC11/06/2023
DOB NOWGeneral ConstructionPermit IssuedA.N.C. CONTRACTING CO.,IN04/18/2023
1 project · most recent 10/24/2024
Water/Sanitary
FiledStatusContractorScope
10/24/2024Signed-offRGL PRO CONTRACTING LLCWater/Sanitary
4 projects · most recent 01/09/2026
General Wiring
FiledStatusContractorScope
01/09/2026Permit IssuedWCK ELECTRIC CORP.General Wiring
08/30/2025Permit IssuedR.A. PHILLIPS ELEC'L CONTGeneral Wiring
04/23/2024Permit IssuedWCK ELECTRIC CORP.General Wiring
06/29/2021Permit IssuedWCK ELECTRIC CORP.General Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
03/31/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/18/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/26/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/22/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/27/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/17/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
10/25/2024Maintenance informationTAI LAWALenergy_progress
10/25/2024Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
08/30/2024Maintenance informationTAI LAWALenergy_progress
08/30/2024Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
04/11/2023FinalTAI LAWALprogress
04/11/2023Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
04/11/2023Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
04/07/2023Fire-Resistant Penetrations and Joints—special
04/07/2023FinalTAI LAWALprogress
04/07/2023Structural Stability – Alterations of existing buildings—special
▾Documents — 28 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/27/2026B00777399-P2Request digital key ↗
08/27/2026B00777399-S1Request digital key ↗
08/27/2026B00777399-P3Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications12
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/27/2026B00777399-P2Open ↗
08/27/2026B00777399-S1Open ↗
08/27/2026B00777399-P3Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/31/2026B00777399-I1Open ↗
08/31/2026B00777399-I1Open ↗
08/28/2026B00777399-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/31/2026B00777399-I1Open ↗
08/28/2026B00777399-S1Open ↗
08/24/2026B00777399-P2Open ↗
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist2
08/13/2026B00777399-P1Open ↗
08/13/2026B00777399-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00777399-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/27/2026B00777399-S1Open ↗
08/27/2026B00777399-P3Open ↗
08/27/2026B00777399-P2Open ↗
Showing 3 of 5 on file for this type
▸Other Documents3
▸DOB NOWProperty Ownership Certification2
08/27/2026B00777399-P1Open ↗
08/27/2026B00777399-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00777399-I1Open ↗