← Back
Two family brick
119 EAST 54 STREET
BROOKLYN · BIN 3100956
💬 Discuss this project
1920Year Built
2Stories
B1Building Class
R6Zoning
2,760 sfGross Floor Area
2Units
Two family brick · 2,800 sf lot · 0.99 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
Floor 2Under Construction24p · 2 filings · 20 docs
Floor 1Under Construction22p · 1 filing · 20 docs
CellarUnder Construction27p · 1 filing · 20 docs
1 job · most recent 08/11/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/11/2025Permit IssuedNULITE FUEL OIL CO., LTDHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Fujitsu AOUH30KUAS1 35,000 BTU · Condensing Unit ×2
Ventilation
Fujitsu AMUH30KUAS1 870 CFM · Ahu ×2
1 job · most recent 05/09/2025
Sprinkler System
FiledStatusContractorScope
05/09/2025Permit IssuedDYNAMIC PLBNG & SPRKR CORSprinkler System
1 job · most recent 05/09/2025
Gas Water/Sanitary
FiledStatusContractorScope
05/09/2025Permit IssuedDYNAMIC PLBG & SPRKLR CORGas, Water/Sanitary
1 job · most recent 01/16/2026
General Wiring
FiledStatusContractorScope
01/16/2026Permit IssuedTRIPLE T ELECTRIC INCGeneral Wiring
Building Lifecycle
All (107)Filed (6)Permit Issued (10)Inspection (6)Objection (65)Special Inspection (20)
09/23/2026
Permit issued — Sprinklers
B08026890-S2-EW-SP
08/12/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/07/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
07/17/2026
Permit issued — General Construction
B01265852-I1-GC
07/16/2026
Permit issued — Mechanical Systems
B01265852-I1-MS
06/03/2026
Permit issued — General Construction
B08026890-I1-GC
03/30/2026
Permit issued — General Construction
B08026890-I1-GC
11/24/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/17/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/17/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/15/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/04/2025
Permit issued — General Construction
B08026890-I1-GC
09/03/2025
Permit issued — Plumbing
B08026890-S3-PL
08/28/2025
Permit issued — Sprinklers
B08026890-S2-EW-SP
08/18/2025
Permit issued — General Construction
B01265852-I1-GC
08/15/2025
Permit issued — General Construction
B01265852-I1-MS
08/11/2025
Filed — Alteration
INSTALL TWO (2) SPLIT AC SYSTEMS TO SERVE 2ND FLOOR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01265852-I1
08/04/2025
Special inspection requirement — Mechanical Systems
Joseph Bazini
08/04/2025
Special inspection requirement — Final
Joseph Bazini
07/01/2025
Objection resolved — Addressed
05/28/2025
Special inspection requirement — Fenestration areas
SERGEY BOLOTOV
05/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SERGEY BOLOTOV
05/28/2025
Special inspection requirement — Tenant Protection Plan Compliance
SERGEY BOLOTOV
05/28/2025
Special inspection requirement — Energy Code Compliance Inspections
SERGEY BOLOTOV
05/27/2025
Objection resolved — Addressed
05/20/2025
Objection raised — Admin
05/20/2025
Objection raised — Plumbing
05/09/2025
Filed — Alteration CO
Install sprinkler system as per plans.
B08026890-S3
05/09/2025
Special inspection requirement — Maintenance information
SERGEY BOLOTOV
05/09/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
SERGEY BOLOTOV
05/09/2025
Special inspection requirement — HVAC-R and service water heating system controls
SERGEY BOLOTOV
05/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SERGEY BOLOTOV
05/09/2025
Special inspection requirement — Tenant Protection Plan Compliance
SERGEY BOLOTOV
05/09/2025
Special inspection requirement — Energy Code Compliance Inspections
SERGEY BOLOTOV
05/09/2025
Special inspection requirement — HVAC-R and service water heating equipment
SERGEY BOLOTOV
03/25/2025
Objection resolved — Addressed
03/24/2025
Objection resolved — Resolved
03/24/2025
Objection resolved — Resolved
03/24/2025
Objection resolved — Resolved
03/24/2025
Objection resolved — Resolved
03/24/2025
Objection resolved — Addressed
03/24/2025
Objection resolved — Resolved
03/24/2025
Objection resolved — Addressed
03/22/2025
Filed — Alteration CO
Install sprinkler system as per plans.
B08026890-S2
03/10/2025
Filed — Alteration CO
Install sprinkler system as per plans.
B08026890-P1
03/08/2025
Special inspection requirement — Fenestration areas
03/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/08/2025
Special inspection requirement — Tenant Protection Plan Compliance
03/08/2025
Special inspection requirement — Energy Code Compliance Inspections
02/05/2025
Objection resolved — Addressed
02/05/2025
Objection resolved — Addressed
02/05/2025
Objection resolved — Addressed
02/05/2025
Objection resolved — Addressed
02/05/2025
Objection resolved — Addressed
02/05/2025
Objection resolved — Addressed
08/30/2024
Objection raised — Structural
08/30/2024
Objection raised — Admin
08/30/2024
Objection raised — Structural
08/30/2024
Objection raised — Admin
08/30/2024
Objection raised — Other
Latest 60 of 107 events.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/29/2015$565K—Private party → Private party$205/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BAZINI ENGINEERING, P.C.108/11/2025
JT ENGINEERING, PC105/09/2025
WAVIC ENGINEERING PLLC103/22/2025
LONG ISLAND ENGINEERING & ARCHITECT303/10/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NULITE FUEL OIL CO., LTDGeneral Contractor507/19/2026
DYNAMIC PLBNG & SPRKR CORFire Protection209/24/2026
V'S CREATIVE DESIGNGeneral Contractor207/08/2026
TRIPLE T ELECTRIC INCElectrical103/22/2026
G-UNIQUE REMODELING ANDGeneral Contractor104/09/2026
DYNAMIC PLBG & SPRKLR CORPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BAZINI ENGINEERING, P.C.1808108/11/2025
SJS INSPECTIONS AND CONSU8286305/09/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedDYNAMIC PLBNG & SPRKR COR09/23/2026
DOB NOWGeneral ConstructionPermit IssuedNULITE FUEL OIL CO., LTD07/17/2026
DOB NOWMechanical SystemsPermit IssuedNULITE FUEL OIL CO., LTD07/16/2026
DOB NOWGeneral ConstructionPermit IssuedV'S CREATIVE DESIGN06/03/2026
DOB NOWGeneral ConstructionPermit IssuedG-UNIQUE REMODELING AND03/30/2026
DOB NOWGeneral ConstructionPermit IssuedV'S CREATIVE DESIGN09/04/2025
DOB NOWPlumbingPermit IssuedCITYWIDE PLBG HTG & SPKLS09/03/2025
DOB NOWSprinklersPermit IssuedCITYWIDE PLBG, HTG &SPRKL08/28/2025
DOB NOWGeneral ConstructionPermit IssuedNULITE FUEL OIL CO., LTD08/18/2025
DOB NOWGeneral ConstructionPermit IssuedNULITE FUEL OIL CO., LTD08/15/2025
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
08/12/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/07/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
11/24/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/17/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/17/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/15/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
08/04/2025Mechanical SystemsJoseph Bazinispecial
08/04/2025FinalJoseph Baziniprogress
05/28/2025Fenestration areasSERGEY BOLOTOVenergy_progress
05/28/2025Fire-Resistant Penetrations and JointsSERGEY BOLOTOVspecial
05/28/2025Tenant Protection Plan ComplianceSERGEY BOLOTOVspecial
05/28/2025Energy Code Compliance InspectionsSERGEY BOLOTOVprogress
05/09/2025Maintenance informationSERGEY BOLOTOVenergy_progress
05/09/2025HVAC-R and service water piping design and insulationSERGEY BOLOTOVenergy_progress
05/09/2025HVAC-R and service water heating system controlsSERGEY BOLOTOVenergy_progress
05/09/2025Fire-Resistant Penetrations and JointsSERGEY BOLOTOVspecial
05/09/2025Tenant Protection Plan ComplianceSERGEY BOLOTOVspecial
05/09/2025Energy Code Compliance InspectionsSERGEY BOLOTOVprogress
05/09/2025HVAC-R and service water heating equipmentSERGEY BOLOTOVenergy_progress
03/08/2025Fenestration areas—energy_progress
03/08/2025Fire-Resistant Penetrations and Joints—special
03/08/2025Tenant Protection Plan Compliance—special
03/08/2025Energy Code Compliance Inspections—progress
08/09/2023Fire-Resistant Penetrations and Joints—special
08/09/2023Tenant Protection Plan Compliance—special
07/20/2023Sprinkler Systems—special
▾Documents — 41 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/21/2026B08026890-P1Request digital key ↗
08/21/2026B08026890-P4Request digital key ↗
08/21/2026B08026890-S2Request digital key ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications18
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/21/2026B08026890-P1Open ↗
08/21/2026B08026890-S1Open ↗
08/21/2026B08026890-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/23/2026B01265852-I1Open ↗
09/01/2026B01265852-P1Open ↗
08/25/2026B08026890-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/23/2026B01265852-I1Open ↗
09/01/2026B01265852-P1Open ↗
08/25/2026B08026890-I1Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist3
08/21/2026B08026890-P4Open ↗
08/13/2026B08026890-I1Open ↗
08/13/2026B08026890-P1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B08026890-I1Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/21/2026B08026890-P4Open ↗
08/21/2026B08026890-S2Open ↗
08/21/2026B08026890-P1Open ↗
Showing 3 of 8 on file for this type
▸Other Documents3
▸DOB NOWProperty Ownership Certification3
08/21/2026B08026890-P1Open ↗
08/21/2026B08026890-P4Open ↗
08/14/2026B08026890-I1Open ↗