← Back
Three families
881 LINDEN BOULEVARD
BROOKLYN · BIN 3101573
💬 Discuss this project
1920Year Built
2Stories
C0Building Class
R6Zoning
2,508 sfGross Floor Area
3Units
Rent Stabilized1 Open Violation ▸FDNY Report ↗
Three families · Owner of record: 881 LINDEN RESIDENCE LLC · 3,000 sf lot · 0.84 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionGeneral
Floor 212p · 1 filing · 20 docs
Floor 112p · 1 filing · 20 docs
Basement19p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
STY1607/08/2026
881 LINDEN RESIDENCE LLC103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/17/2024$1.2M—Private party → 881 LINDEN RESIDENCE LLC$478/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LEANDRO NILS DICKSON ARCHITECT, LLC905/13/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPEDITING 4 U903/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AB CONTRACTING USA INCGeneral Contractor307/08/2026
B&B MECH PLBG & HTG LLCPlumbing207/08/2026
TARGET PIPING NY LLCFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616805/13/2025
Building Lifecycle
All (119)Filed (9)Permit Issued (6)Signed Off (5)Violation (3)Inspection (10)Objection (56)Special Inspection (30)
01/06/2026
Violation issued (HPD, closed)
C
01/06/2026
Violation issued (HPD, open)
C
05/25/2025
Signed off — Alteration CO
SUBSEQUENT MECHANICAL APPLICATION FILED HEREWITH.
B01070742-S3
05/25/2025
Signed off — Alteration CO
SUBSEQUENT MECHANICAL APPLICATION FILED HEREWITH.
B01070742-S2
05/23/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
05/19/2025
Signed off — Alteration CO
SUBSEQUENT MECHANICAL APPLICATION FILED HEREWITH.
B01070742-S1
05/19/2025
Signed off — Alteration CO
SUBSEQUENT MECHANICAL APPLICATION FILED HEREWITH.
B01070742-S5
05/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
05/16/2025
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
05/16/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
05/16/2025
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
05/16/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
05/13/2025
Filed — Alteration CO
SUBSEQUENT MECHANICAL APPLICATION FILED HEREWITH.
B01070742-P3
05/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
05/09/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
05/09/2025
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
05/09/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
05/09/2025
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
05/08/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
05/08/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/08/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
05/05/2025
Special inspection requirement — Heating Systems
FAHAD FATEH
05/05/2025
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
05/05/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
05/05/2025
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
05/05/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
04/25/2025
Filed — Alteration CO
SUBSEQUENT MECHANICAL APPLICATION FILED HEREWITH.
B01070742-P2
04/24/2025
Special inspection requirement — Heating Systems
FAHAD FATEH
04/24/2025
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
04/24/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
04/24/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
04/24/2025
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
04/04/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/01/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/01/2025
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
03/28/2025
Filed — Alteration CO
SUBSEQUENT MECHANICAL APPLICATION FILED HEREWITH.
B01070742-P1
03/27/2025
Signed off — Alteration
FENCE APPLICATION FILED IN CONJUNCTION WITH ALTERATION CO JOB #B01070742.
B01084126-I1
03/19/2025
Special inspection requirement — Heating Systems
FAHAD FATEH
03/19/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
03/19/2025
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
03/19/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
03/19/2025
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
03/18/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/18/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/13/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
01/06/2025
Permit issued — Boiler Equipment
B01070742-S5-BE
01/03/2025
Permit issued — Mechanical Systems
B01070742-S1-MS
12/30/2024
Permit issued — Plumbing
B01070742-S2-PL
12/19/2024
Permit issued — Sprinklers
B01070742-S3-EW-SP
12/18/2024
Permit issued — General Construction
B01070742-I1-GC
11/14/2024
Filed — Alteration CO
SUBSEQUENT MECHANICAL APPLICATION FILED HEREWITH.
B01070742-S1
11/13/2024
Filed — Alteration CO
SUBSEQUENT MECHANICAL APPLICATION FILED HEREWITH.
B01070742-S2
11/13/2024
Filed — Alteration CO
SUBSEQUENT MECHANICAL APPLICATION FILED HEREWITH.
B01070742-S5
11/05/2024
Filed — Alteration CO
SUBSEQUENT MECHANICAL APPLICATION FILED HEREWITH.
B01070742-S3
10/31/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
10/31/2024
Special inspection requirement — Post-installed Anchors
FAHAD FATEH
10/09/2024
Objection resolved — Addressed
10/09/2024
Objection resolved — Addressed
10/09/2024
Objection resolved — Addressed
09/16/2024
Special inspection requirement — Sprinkler Systems
FAHAD FATEH
Latest 60 of 119 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offTARGET PIPING NY LLC01/06/2025
DOB NOWMechanical SystemsSigned-offAB CONTRACTING USA01/03/2025
DOB NOWPlumbingSigned-offTARGET PIPING NY LLC12/30/2024
DOB NOWSprinklersSigned-offTARGET PIPING NY LLC12/19/2024
DOB NOWGeneral ConstructionPermit IssuedAB CONTRACTING USA12/18/2024
DOB NOWConstruction FenceSigned-offAB CONTRACTING USA08/06/2024
1 project · most recent 12/19/2024
General Wiring
FiledStatusContractorScope
12/19/2024CompleteS&R ELECTRICAL & MECHANICGeneral Wiring
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
05/23/2025Fail-Final General Construction Non-Directive 14FailView ↗
05/08/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
05/08/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/08/2025Pass-Final Boiler Equipment InspectionPassView ↗
04/04/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/01/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/01/2025Pass-Final SP - Up to 9 Requested FloorsPassView ↗
03/18/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/18/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/13/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 41
DateRequirementInspectorRole
05/16/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
05/16/2025HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
05/16/2025Maintenance informationFAHAD FATEHenergy_progress
05/16/2025HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
05/16/2025HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
05/09/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
05/09/2025HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
05/09/2025HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
05/09/2025Maintenance informationFAHAD FATEHenergy_progress
05/09/2025HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
05/05/2025Heating SystemsFAHAD FATEHspecial
05/05/2025HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
05/05/2025HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
05/05/2025HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
05/05/2025Maintenance informationFAHAD FATEHenergy_progress
04/24/2025Heating SystemsFAHAD FATEHspecial
04/24/2025HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
04/24/2025Maintenance informationFAHAD FATEHenergy_progress
04/24/2025HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
04/24/2025HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
03/19/2025Heating SystemsFAHAD FATEHspecial
03/19/2025HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
03/19/2025HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
03/19/2025Maintenance informationFAHAD FATEHenergy_progress
03/19/2025HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
Latest 25 of 41.
▾Documents — 45 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/23/2026B01070742-S5Request digital key ↗
08/23/2026B01070742-P1Request digital key ↗
08/23/2026B01070742-P2Request digital key ↗
Showing 3 of 9 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B01070742-I1Open ↗
▸Seals & Professional Certifications24
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/24/2026B01084126-I1Open ↗
08/13/2026B01070742-S3Open ↗
08/13/2026B01070742-S2Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/23/2026B01070742-S5Open ↗
09/21/2026B01070742-S3Open ↗
09/02/2026B01070742-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/23/2026B01070742-S5Open ↗
09/02/2026B01070742-I1Open ↗
09/02/2026B01070742-I1Open ↗
Showing 3 of 7 on file for this type
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026B01070742-I1Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/13/2026B01070742-S5Open ↗
08/13/2026B01070742-S3Open ↗
08/13/2026B01070742-S2Open ↗
Showing 3 of 8 on file for this type
▸Other Documents2
▸DOB NOWProperty Ownership Certification1
08/13/2026B01070742-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026B01070742-I1Open ↗