Four families
128 EAST 57 STREET
BROOKLYN · BIN 3102396
💬 Discuss this project
1930Year Built
2Stories
C3Building Class
R5Zoning
3,200 sfGross Floor Area
4Units
Rent Stabilized5 Open Violations 4 unresolved · 1 paperwork only ▸FDNY Report ↗
Four families · Owner of record: 128 EAST 57TH STREET LLC. · 3,000 sf lot · 1.07 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalGeneral
Roof3p · 1 filing · 20 docs
Floor 22p · 1 filing · 20 docs
Floor 12p · 1 filing · 20 docs
Cellar5p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PETERS LENNOX 1103/22/2026
PETERS LENNOX OR OWNER OF103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KMP DESIGN & ENGINEERING PLLC706/13/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KMP DESIGN ENGINEERING1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PHILLIPS CARPENTERS & CL*General Contractor607/08/2026
DJ INTERNATIONAL PLBG INCPlumbing407/08/2026
VERE PADMOREElectrical103/21/2026
VERE ELECTRIC CORP 002467General Contractor103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KMP DESIGN & ENGINEERING1630506/13/2025
IP CONCRETE TESTING AND I6252108/04/2021
Building Lifecycle
All (118)Filed (7)Permit Issued (4)Signed Off (2)Violation (51)Inspection (8)Objection (16)Special Inspection (30)
05/04/2026
Violation issued (HPD, closed)
A
03/13/2026
Signed off — Alteration
TO MAKE CELLAR AS ACCESSORY USE TO (2) TWO APARTMENTS AT 1ST FLOOR, REMOVE PARTITION WALL IN ONE OF APARTMENTS AT 2ND FLOOR TO CREATE LIVING ROOM. THIS FILING ADDRESSES ECB VIOLATION 35421889R.
B00549369-I1
11/21/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
10/10/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
09/22/2025
Permit issued — General Construction
B00549369-I1-GC
08/15/2025
Special inspection requirement — Maintenance information
INDARDEO PARBHUNATH
08/15/2025
Special inspection requirement — Air barrier - visual inspection
INDARDEO PARBHUNATH
08/15/2025
Special inspection requirement — Fenestration air leakage
INDARDEO PARBHUNATH
08/15/2025
Special inspection requirement — Insulation placement and R values
INDARDEO PARBHUNATH
08/15/2025
Special inspection requirement — Fenestration areas
INDARDEO PARBHUNATH
08/15/2025
Special inspection requirement — Energy Code Compliance Inspections
INDARDEO PARBHUNATH
08/15/2025
Special inspection requirement — Fire-Resistance Rated Construction
INDARDEO PARBHUNATH
08/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
08/15/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
INDARDEO PARBHUNATH
07/07/2025
Special inspection requirement — Maintenance information
06/13/2025
Filed — Alteration
TO MAKE CELLAR AS ACCESSORY USE TO (2) TWO APARTMENTS AT 1ST FLOOR, REMOVE PARTITION WALL IN ONE OF APARTMENTS AT 2ND FLOOR TO CREATE LIVING ROOM. THIS FILING ADDRESSES ECB VIOLATION 35421889R.
B00549369-P4
06/09/2025
Violation issued (HPD, closed)
A
05/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
KENNETH PHILOGENE
05/21/2025
Special inspection requirement — Energy Code Compliance Inspections
KENNETH PHILOGENE
05/21/2025
Special inspection requirement — Fire-Resistance Rated Construction
KENNETH PHILOGENE
05/21/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
KENNETH PHILOGENE
05/21/2025
Special inspection requirement — Insulation placement and R values
KENNETH PHILOGENE
05/21/2025
Special inspection requirement — Fenestration areas
KENNETH PHILOGENE
05/21/2025
Special inspection requirement — Fenestration air leakage
KENNETH PHILOGENE
05/21/2025
Special inspection requirement — Air barrier - visual inspection
KENNETH PHILOGENE
02/11/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
02/07/2025
Signed off — Alteration
B00569395-I1
01/14/2025
Permit issued — General Construction
B00549369-I1-GC
11/26/2024
Filed — Alteration
TO MAKE CELLAR AS ACCESSORY USE TO (2) TWO APARTMENTS AT 1ST FLOOR, REMOVE PARTITION WALL IN ONE OF APARTMENTS AT 2ND FLOOR TO CREATE LIVING ROOM. THIS FILING ADDRESSES ECB VIOLATION 35421889R.
B00549369-P3
11/11/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
KENNETH PHILOGENE
11/11/2024
Special inspection requirement — Insulation placement and R values
KENNETH PHILOGENE
11/11/2024
Special inspection requirement — Air barrier - visual inspection
KENNETH PHILOGENE
11/11/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
KENNETH PHILOGENE
11/11/2024
Special inspection requirement — Fenestration air leakage
KENNETH PHILOGENE
11/11/2024
Special inspection requirement — Fenestration areas
KENNETH PHILOGENE
11/11/2024
Special inspection requirement — Fire-Resistance Rated Construction
KENNETH PHILOGENE
11/11/2024
Special inspection requirement — Energy Code Compliance Inspections
KENNETH PHILOGENE
09/03/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/11/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/29/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/09/2024
Violation issued (HPD, closed)
A
03/12/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/12/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/13/2024
Permit issued — Plumbing
B00569395-I1-PL
12/01/2023
Permit issued — General Construction
B00549369-I1-GC
03/22/2023
Violation issued (HPD, closed)
A
11/04/2022
Violation issued (HPD, closed)
I
03/22/2022
Objection resolved — Addressed
03/09/2022
Objection raised — Scope
03/03/2022
Filed — Alteration
TO MAKE CELLAR AS ACCESSORY USE TO (2) TWO APARTMENTS AT 1ST FLOOR, REMOVE PARTITION WALL IN ONE OF APARTMENTS AT 2ND FLOOR TO CREATE LIVING ROOM. THIS FILING ADDRESSES ECB VIOLATION 35421889R.
B00549369-P2
02/24/2022
Violation issued (HPD, closed)
A
02/24/2022
Special inspection requirement — Energy Code Compliance Inspections
KENNETH PHILOGENE
02/24/2022
Special inspection requirement — Fire-Resistance Rated Construction
KENNETH PHILOGENE
02/24/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
KENNETH PHILOGENE
02/24/2022
Special inspection requirement — Air barrier - visual inspection
KENNETH PHILOGENE
02/09/2022
Objection raised — Scope
02/09/2022
Objection resolved — Addressed
02/03/2022
Filed — Alteration
MECHANICAL WORK TYPE ONLY IN CONJUNCTION WITH #B00549369. INTERIOR RENOVATION TO MAKE CELLAR AS ACCESSORY USE OF TWO APARTMENTS AT 1ST FLOOR.
B00569398-I1
12/13/2021
Filed — Alteration
TO MAKE CELLAR AS ACCESSORY USE TO (2) TWO APARTMENTS AT 1ST FLOOR, REMOVE PARTITION WALL IN ONE OF APARTMENTS AT 2ND FLOOR TO CREATE LIVING ROOM. THIS FILING ADDRESSES ECB VIOLATION 35421889R.
B00549369-P1
11/30/2021
Filed — Alteration
B00569395-I1
Latest 60 of 118 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offPHILLIPS CARPENTERS & CL*09/22/2025
DOB NOWGeneral ConstructionSigned-offPHILLIPS CARPENTERS & CL*01/14/2025
DOB NOWPlumbingSigned-offDJ INTERNATIONAL PLBG INC02/13/2024
DOB NOWGeneral ConstructionSigned-offPHILLIPS CARPENTERS & CL*12/01/2023
1 project · most recent 02/03/2022
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
02/03/2022——Air Conditioning Systems
Cooling
Cooper & Hunter SOPHIA MULTI-ZONE INVERTER 36,000 BTU · Heat Pump Outdoor ×4
1 project · most recent 11/14/2023
General Wiring
FiledStatusContractorScope
11/14/2023Permit IssuedVERE ELECTRIC CORP.General Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
11/21/2025Pass-Final General Construction Non-Directive 14PassView ↗
10/10/2025Fail-Final General Construction Non-Directive 14FailView ↗
02/11/2025Fail-Final General Construction Non-Directive 14FailView ↗
09/03/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/11/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/29/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/12/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/12/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 34
DateRequirementInspectorRole
08/15/2025Maintenance informationINDARDEO PARBHUNATHenergy_progress
08/15/2025Air barrier - visual inspectionINDARDEO PARBHUNATHenergy_progress
08/15/2025Fenestration air leakageINDARDEO PARBHUNATHenergy_progress
08/15/2025Insulation placement and R valuesINDARDEO PARBHUNATHenergy_progress
08/15/2025Fenestration areasINDARDEO PARBHUNATHenergy_progress
08/15/2025Energy Code Compliance InspectionsINDARDEO PARBHUNATHprogress
08/15/2025Fire-Resistance Rated ConstructionINDARDEO PARBHUNATHprogress
08/15/2025Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
08/15/2025Fenestration and door U-factor and product ratingsINDARDEO PARBHUNATHenergy_progress
07/07/2025Maintenance information—energy_progress
05/21/2025Fire-Resistant Penetrations and JointsKENNETH PHILOGENEspecial
05/21/2025Energy Code Compliance InspectionsKENNETH PHILOGENEprogress
05/21/2025Fire-Resistance Rated ConstructionKENNETH PHILOGENEprogress
05/21/2025Fenestration and door U-factor and product ratingsKENNETH PHILOGENEenergy_progress
05/21/2025Insulation placement and R valuesKENNETH PHILOGENEenergy_progress
05/21/2025Fenestration areasKENNETH PHILOGENEenergy_progress
05/21/2025Fenestration air leakageKENNETH PHILOGENEenergy_progress
05/21/2025Air barrier - visual inspectionKENNETH PHILOGENEenergy_progress
11/11/2024Fire-Resistant Penetrations and JointsKENNETH PHILOGENEspecial
11/11/2024Insulation placement and R valuesKENNETH PHILOGENEenergy_progress
11/11/2024Air barrier - visual inspectionKENNETH PHILOGENEenergy_progress
11/11/2024Fenestration and door U-factor and product ratingsKENNETH PHILOGENEenergy_progress
11/11/2024Fenestration air leakageKENNETH PHILOGENEenergy_progress
11/11/2024Fenestration areasKENNETH PHILOGENEenergy_progress
11/11/2024Fire-Resistance Rated ConstructionKENNETH PHILOGENEprogress
Latest 25 of 34.
▾Documents — 42 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
09/01/2026B00549369-P4Request digital key ↗
09/01/2026B00549369-P3Request digital key ↗
09/01/2026B00549369-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications26
▸DOB NOWProgress Inspector Seal & Signature16
09/01/2026B00549369-I1Open ↗
09/01/2026B00549369-I1Open ↗
09/01/2026B00549369-P3Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
09/01/2026B00549369-P4Open ↗
09/01/2026B00549369-P3Open ↗
09/01/2026B00549369-P2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026B00549369-I1Open ↗
09/01/2026B00549369-P3Open ↗
08/28/2026B00549369-P4Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
09/01/2026B00549369-P3Open ↗
09/01/2026B00549369-P4Open ↗
09/01/2026B00549369-P1Open ↗
Showing 3 of 7 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026B00569395-I1Open ↗
08/13/2026B00549369-I1Open ↗