← Back
One family attached or semi-detached
591 EAST 92 STREET
BROOKLYN · BIN 3103436
💬 Discuss this project
1940Year Built
1Stories
A5Building Class
R5Zoning
2,299 sfGross Floor Area
1Units
One family attached or semi-detached · 2,750 sf lot · 0.84 FAR built · Flood zone X
Locations of Work
ElectricalGeneral
Roof2p · 1 filing · 11 docs
1 job · most recent 07/31/2025
FiledStatusContractorScope
07/31/2025CompleteMAK ELECTRICAL CONTR CORP1 meters
1 job · most recent 03/13/2026
FiledStatusContractorScope
03/13/2026Permit IssuedPATRIOT ENERGY SOL CO30 panels, 10.94 kw, 1,349 roof_area_sqft
Building Lifecycle
All (7)Filed (2)Permit Issued (1)Special Inspection (4)
03/13/2026
Filed — Alteration
ROOFTOP SOLAR PANEL INSTALLATION
B01261520-P1
08/07/2025
Permit issued — Solar
B01261520-I1-SL
08/04/2025
Filed — Alteration
ROOFTOP SOLAR PANEL INSTALLATION
B01261520-I1
07/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
VYACHESLAV NECHAYEV
07/25/2025
Special inspection requirement — Energy Code Compliance Inspections
VYACHESLAV NECHAYEV
07/25/2025
Special inspection requirement — Final
VYACHESLAV NECHAYEV
07/25/2025
Special inspection requirement — Air barrier - visual inspection
VYACHESLAV NECHAYEV
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ETRECTE LLC203/13/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PATRIOT ENERGY SOLUTIONS CORP403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PATRIOT ENERGY SOL COGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ETRECTE LLC8116203/13/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedPATRIOT ENERGY SOL CO08/07/2025
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
07/25/2025Fire-Resistant Penetrations and JointsVYACHESLAV NECHAYEVspecial
07/25/2025Energy Code Compliance InspectionsVYACHESLAV NECHAYEVprogress
07/25/2025FinalVYACHESLAV NECHAYEVprogress
07/25/2025Air barrier - visual inspectionVYACHESLAV NECHAYEVenergy_progress
▾Documents — 11 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/18/2026B01261520-I1Request digital key ↗
08/18/2026B01261520-P1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026B01261520-I1Open ↗
09/01/2026B01261520-I1Open ↗
09/01/2026B01261520-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026B01261520-I1Open ↗
08/13/2026B01261520-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/01/2026B01261520-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026B01261520-P1Open ↗
08/13/2026B01261520-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B01261520-I1Open ↗