← Back
Two family brick
158 EAST 88 STREET
BROOKLYN · BIN 3104695
💬 Discuss this project
1940Year Built
1Stories
B1Building Class
R5Zoning
1,701 sfGross Floor Area
2Units
Two family brick · 2,200 sf lot · 0.77 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalPlumbing
Floor 14p · 1 filing · 20 docs
Basement7p · 2 filings · 20 docs
Sub-Basement9p · 1 filing · 18 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GREEN RIVER ENVIRONMENTAL ENGINEERI112/18/2025
KMP DESIGN & ENGINEERING PLLC504/11/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KMP DESIGN ENGINEERING403/21/2026
NY State Solar LLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
THEU BUILDING HOME ENTERPGeneral Contractor303/21/2026
PLUMB-IT MECHANICAL INCPlumbing207/08/2026
NYSS LLCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GREEN RIVER ENVIRONMENTAL7841112/18/2025
KMP DESIGN & ENGINEERING1630504/11/2024
Building Lifecycle
All (72)Filed (6)Permit Issued (4)Signed Off (1)Inspection (6)Objection (26)Special Inspection (29)
02/02/2026
Signed off — Alteration
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS.
B01336083-I1
12/18/2025
Filed — Alteration
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS.
B01336083-I1
12/18/2025
Permit issued — Solar
B01336083-I1-SL
12/18/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
ROBERT MASONE
12/18/2025
Special inspection requirement — Air barrier - visual inspection
ROBERT MASONE
12/17/2025
Special inspection requirement — Energy Code Compliance Inspections
ROBERT MASONE
12/17/2025
Special inspection requirement — Final
ROBERT MASONE
12/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ROBERT MASONE
11/29/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/06/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/26/2024
Special inspection requirement — Maintenance information
KENNETH PHILOGENE
04/26/2024
Special inspection requirement — HVAC-R and service water heating system controls
KENNETH PHILOGENE
04/26/2024
Special inspection requirement — HVAC-R and service water heating equipment
KENNETH PHILOGENE
04/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
KENNETH PHILOGENE
04/21/2024
Objection resolved — Addressed
04/19/2024
Objection raised — Scope
04/11/2024
Filed — Alteration
PLUMBING WORK TYPE ONLY, IN CONJUNCTION WITH #B00578180-I1, CONVERSION OF EXISTING 1 FAMILY TO 2FAMILY WITH NEW APARTMENT AT BASEMENT LEVEL.
B00580889-P2
02/09/2024
Special inspection requirement — HVAC-R and service water heating equipment
KENNETH PHILOGENE
02/09/2024
Special inspection requirement — Maintenance information
KENNETH PHILOGENE
02/09/2024
Special inspection requirement — HVAC-R and service water heating system controls
KENNETH PHILOGENE
02/09/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
KENNETH PHILOGENE
02/07/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/19/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/19/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/11/2023
Permit issued — Plumbing
B00580889-I1-PL
09/07/2023
Special inspection requirement — Fenestration air leakage
KENNETH PHILOGENE
09/07/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
KENNETH PHILOGENE
09/07/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
KENNETH PHILOGENE
09/07/2023
Special inspection requirement — Energy Code Compliance Inspections
KENNETH PHILOGENE
09/07/2023
Special inspection requirement — Fire-Resistance Rated Construction
KENNETH PHILOGENE
09/07/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
KENNETH PHILOGENE
09/07/2023
Special inspection requirement — Lighting in dwelling units
KENNETH PHILOGENE
09/07/2023
Special inspection requirement — Interior lighting power
KENNETH PHILOGENE
09/01/2023
Objection resolved — Addressed
08/29/2023
Objection raised — Scope
08/24/2023
Filed — Alteration CO
CONVERSION OF EXISTING 1 FAMILY TO 2 FAMILY TO HAVE A NEW APARTMENT AT BASEMENT LEVEL.
B00578180-P1
08/24/2023
Filed — Alteration
PLUMBING WORK TYPE ONLY, IN CONJUNCTION WITH #B00578180-I1, CONVERSION OF EXISTING 1 FAMILY TO 2FAMILY WITH NEW APARTMENT AT BASEMENT LEVEL.
B00580889-P1
08/18/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
KENNETH PHILOGENE
08/18/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
KENNETH PHILOGENE
08/18/2023
Special inspection requirement — Interior lighting power
KENNETH PHILOGENE
08/18/2023
Special inspection requirement — Lighting in dwelling units
KENNETH PHILOGENE
08/18/2023
Special inspection requirement — Fenestration air leakage
KENNETH PHILOGENE
08/18/2023
Special inspection requirement — Fire-Resistance Rated Construction
KENNETH PHILOGENE
08/18/2023
Special inspection requirement — Energy Code Compliance Inspections
KENNETH PHILOGENE
08/18/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
KENNETH PHILOGENE
01/11/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/27/2022
Permit issued — Plumbing
B00580889-I1-PL
09/08/2022
Permit issued — General Construction
B00578180-I1-GC
12/17/2021
Filed — Alteration
PLUMBING WORK TYPE ONLY, IN CONJUNCTION WITH #B00578180-I1, CONVERSION OF EXISTING 1 FAMILY TO 2FAMILY WITH NEW APARTMENT AT BASEMENT LEVEL.
B00580889-I1
10/18/2021
Objection raised — Other
10/18/2021
Objection resolved — Addressed
10/18/2021
Objection raised — Other
10/18/2021
Objection resolved — Addressed
10/18/2021
Objection raised — Other
10/18/2021
Objection resolved — Addressed
10/18/2021
Objection raised — Other
10/18/2021
Objection resolved — Addressed
10/18/2021
Objection raised — Other
10/18/2021
Objection resolved — Addressed
10/18/2021
Objection raised — Other
Latest 60 of 72 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offNYSS LLC12/18/2025
DOB NOWPlumbingPermit IssuedJVR PLBG AND HEATING INC12/11/2023
DOB NOWPlumbingPermit IssuedJVR PLBG AND HEATING INC10/27/2022
DOB NOWGeneral ConstructionPermit IssuedTHEU BUILDING HOME ENTERP09/08/2022
1 project · most recent 04/11/2024
Gas Water/Sanitary
FiledStatusContractorScope
04/11/2024Permit IssuedJVR PLBG AND HEATING INCGas, Water/Sanitary
2 projects · most recent 12/18/2025
General Wiring
FiledStatusContractorScope
12/18/2025CompleteNY SOLAR ELECTRICAL LLC—
04/13/2023Permit IssuedV. VASS ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
11/29/2024Pass-Final CND-Occupancy InspectionPassView ↗
05/06/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/07/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/19/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/19/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/11/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
12/18/2025Structural Stability – Alterations of existing buildingsROBERT MASONEspecial
12/18/2025Air barrier - visual inspectionROBERT MASONEenergy_progress
12/17/2025Energy Code Compliance InspectionsROBERT MASONEprogress
12/17/2025FinalROBERT MASONEprogress
12/17/2025Fire-Resistant Penetrations and JointsROBERT MASONEspecial
04/26/2024Maintenance informationKENNETH PHILOGENEenergy_progress
04/26/2024HVAC-R and service water heating system controlsKENNETH PHILOGENEenergy_progress
04/26/2024HVAC-R and service water heating equipmentKENNETH PHILOGENEenergy_progress
04/26/2024Fire-Resistant Penetrations and JointsKENNETH PHILOGENEspecial
02/09/2024HVAC-R and service water heating equipmentKENNETH PHILOGENEenergy_progress
02/09/2024Maintenance informationKENNETH PHILOGENEenergy_progress
02/09/2024HVAC-R and service water heating system controlsKENNETH PHILOGENEenergy_progress
02/09/2024Fire-Resistant Penetrations and JointsKENNETH PHILOGENEspecial
09/07/2023Fenestration air leakageKENNETH PHILOGENEenergy_progress
09/07/2023Fire-Resistant Penetrations and JointsKENNETH PHILOGENEspecial
09/07/2023Structural Stability – Alterations of existing buildingsKENNETH PHILOGENEspecial
09/07/2023Energy Code Compliance InspectionsKENNETH PHILOGENEprogress
09/07/2023Fire-Resistance Rated ConstructionKENNETH PHILOGENEprogress
09/07/2023Fenestration and door U-factor and product ratingsKENNETH PHILOGENEenergy_progress
09/07/2023Lighting in dwelling unitsKENNETH PHILOGENEenergy_progress
09/07/2023Interior lighting powerKENNETH PHILOGENEenergy_progress
08/18/2023Fire-Resistant Penetrations and JointsKENNETH PHILOGENEspecial
08/18/2023Fenestration and door U-factor and product ratingsKENNETH PHILOGENEenergy_progress
08/18/2023Interior lighting powerKENNETH PHILOGENEenergy_progress
08/18/2023Lighting in dwelling unitsKENNETH PHILOGENEenergy_progress
Latest 25 of 29.
▾Documents — 50 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/25/2026B00580889-I1Request digital key ↗
08/25/2026B00580889-P1Request digital key ↗
08/19/2026B01336083-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications33
▸DOB NOWProgress Inspector Seal & Signature20
09/12/2026B01336083-I1Open ↗
09/12/2026B01336083-I1Open ↗
09/01/2026B00580889-P2Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/12/2026B01336083-I1Open ↗
09/01/2026B00580889-P2Open ↗
08/26/2026B00580889-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/26/2026B00578180-I1Open ↗
08/26/2026B00578180-P1Open ↗
08/25/2026B00580889-P2Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/13/2026B00578180-P1Open ↗
08/13/2026B00578180-I1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/25/2026B00580889-I1Open ↗
08/25/2026B00580889-P1Open ↗
08/19/2026B01336083-I1Open ↗
Showing 3 of 6 on file for this type
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B01336083-I1Open ↗
▸Other Documents2
▸DOB NOWProperty Ownership Certification2
08/14/2026B00578180-I1Open ↗
08/14/2026B00578180-P1Open ↗