DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
DOB03/31/2021FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB12/29/2020DOOR ZONE RESTRICTOR NOT WORKING TAMPERED WITH DISABLE (CU). PROVIDE A FIRE RATED FLOOR IN CAB (CU).ESCAPE HATCH OPEN SEAL (CU). RUPTURE VALVE NEEDS TO BE CLEAN OR REPLACE RUSTED OUT AND TESTED WITH THE LOAD (C$600 due
DOB04/05/2019VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST
DOB09/15/2017VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2016 INSPECTION/TEST
DOB12/01/2016VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2015 INSPECTION/TEST
DOB06/10/2015VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2014 INSPECTION/TEST
DOB03/03/2015VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
DOB10/31/2014VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2013 INSPECTION/TEST
DOB03/31/2014VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2012 INSPECTION/TEST
DOB12/13/2011VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
DOB11/15/2011V-DOB VIOLATION - ACTIVE
DOB12/31/2009V-DOB VIOLATION - ACTIVE
DOB01/03/2008V-DOB VIOLATION - ACTIVE
DOB01/19/2007V-DOB VIOLATION - ACTIVE
DOB01/19/2007V-DOB VIOLATION - ACTIVE
DOB02/07/2000V-DOB VIOLATION - ACTIVE
DOB02/07/2000V-DOB VIOLATION - ACTIVE
DOB07/25/1994V-DOB VIOLATION - ACTIVE
DOB07/25/1994V-DOB VIOLATION - ACTIVE
ECB05/26/2026NOTED: 1-STORY BRICK BUILDING, EXTERIOR BRICK MASONRY DISPLACEMENT UPPER PORTION OF THE BUILDING FACADE NEAR THE PARAPET AREA EXPOSE. 4. BRICK DISPLACED, LOOSE, AND SEPARATED FROM THE MASONRY WALL STRUCTURAL HOHearing held — result not yet published$1K proposed
ECB11/15/201697#05. FAILURE TO MAINTAIN ELEVATOR DEVICE, RESPONDENT FAILED TO ALLOW MANDATORY ROUTINE INSP BY THE DEPT OR APPROVED AGENCY PER 28-304.6.1 & APPENDIX K OF THE BLDG CODE, REMEDY: ARRANGE FOR & PERMIT THE DEPT TNothing owed — awaiting certificate of correction