Three families
639 ROCKAWAY PARKWAY
BROOKLYN · BIN 3105187
💬 Discuss this project
1920Year Built
2Stories
C0Building Class
R6Zoning
3,900 sfGross Floor Area
3Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Three families · 2,750 sf lot · 1.42 FAR built · Flood zone X
Locations of Work
ArchitectureFire ProtectionCivil
Permit Issued — active, not yet Signed-off
Floor 2Under Construction11p · 1 filing · 20 docs
Floor 1Under Construction13p · 1 filing · 20 docs
BasementUnder Construction12p · 1 filing · 20 docs
1 job · most recent 07/22/2026
Sprinkler System
FiledStatusContractorScope
07/22/2026Signed-offARCO PLBG AND HTG INCSprinkler System
1 job · most recent 07/22/2026
Gas Water/Sanitary
FiledStatusContractorScope
07/22/2026Signed-offPIPE SOLUTIONS ADVIS INCGas, Water/Sanitary
1 job · most recent 11/27/2025
General Wiring
FiledStatusContractorScope
11/27/2025CompleteAG POWER ELECTRIC CORPGeneral Wiring
1 job · most recent 07/22/2026
Fence
FiledStatusContractorScope
07/22/2026Signed-offREVAMP NYC CORPFence
Building Lifecycle
All (95)Filed (8)Permit Issued (5)Signed Off (3)Violation (13)Inspection (6)Objection (30)Special Inspection (30)
08/10/2026
Objection resolved — Resolved
08/06/2026
Objection raised — Other
07/22/2026
Filed — Alteration CO
SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01290227-I1
B01290227-P6
07/21/2026
Special inspection requirement — Permanent certificate
Shahrish Shuvo
07/21/2026
Special inspection requirement — Air barrier - visual inspection
Shahrish Shuvo
07/21/2026
Special inspection requirement — Maintenance information
Shahrish Shuvo
07/21/2026
Special inspection requirement — Fenestration areas
Shahrish Shuvo
07/21/2026
Special inspection requirement — Interior lighting power
Shahrish Shuvo
07/21/2026
Special inspection requirement — Fenestration air leakage
Shahrish Shuvo
07/21/2026
Special inspection requirement — Metering
Shahrish Shuvo
07/21/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Shahrish Shuvo
07/21/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Shahrish Shuvo
07/21/2026
Special inspection requirement — Insulation placement and R values
Shahrish Shuvo
07/01/2026
Signed off — Alteration CO
SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01290227-I1
B01290227-S2
06/04/2026
Signed off — Alteration CO
SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01290227-I1
B01290227-S5
06/03/2026
Signed off — Alteration CO
SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01290227-I1
B01290227-S3
06/03/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/01/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/01/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/01/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/27/2026
Special inspection requirement — Energy Code Compliance Inspections
Shahrish Shuvo
05/27/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Shahrish Shuvo
05/27/2026
Special inspection requirement — HVAC-R and service water heating equipment
Shahrish Shuvo
05/27/2026
Special inspection requirement — Maintenance information
Shahrish Shuvo
05/27/2026
Special inspection requirement — HVAC-R and service water heating system controls
Shahrish Shuvo
05/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
05/26/2026
Violation issued (ECB, closed)
Construction
05/26/2026
Violation issued (ECB, closed)
Unknown
05/21/2026
Permit issued — Construction Fence
B01290227-S5-FN
05/19/2026
Filed — Alteration CO
SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01290227-I1
B01290227-S5
05/15/2026
Violation issued (ECB, closed)
Unknown
05/15/2026
Violation issued (ECB, closed)
Construction
05/13/2026
Filed — Alteration CO
SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01290227-I1
B01290227-P4
05/12/2026
Violation issued (ECB, closed)
Site Safety
05/12/2026
Violation issued (ECB, closed)
Construction
05/12/2026
Special inspection requirement — Energy Code Compliance Inspections
Shahrish Shuvo
05/12/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Shahrish Shuvo
05/12/2026
Special inspection requirement — HVAC-R and service water heating equipment
Shahrish Shuvo
05/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
05/12/2026
Special inspection requirement — HVAC-R and service water heating system controls
Shahrish Shuvo
05/12/2026
Special inspection requirement — Maintenance information
Shahrish Shuvo
05/08/2026
Permit issued — Mechanical Systems
B01290227-S3-MS
05/07/2026
Permit issued — Sprinklers
B01290227-S2-EW-SP
05/07/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/06/2026
Special inspection requirement — Sprinkler Systems
Shahrish Shuvo
05/06/2026
Special inspection requirement — Post-installed Anchors
Shahrish Shuvo
05/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
04/22/2026
Filed — Alteration CO
SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01290227-I1
B01290227-P1
04/22/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/22/2026
Special inspection requirement — Sprinkler Systems
Shahrish Shuvo
04/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
04/22/2026
Special inspection requirement — Post-installed Anchors
Shahrish Shuvo
04/15/2026
Permit issued — General Construction
B01290227-I1-GC
04/15/2026
Permit issued — Plumbing
B01290227-S4-PL
03/20/2026
Special inspection requirement — Ventilation and air distribution system
Shahrish Shuvo
03/02/2026
Filed — Alteration CO
SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01290227-I1
B01290227-S3
02/04/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Shahrish Shuvo
01/22/2026
Filed — Alteration CO
SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01290227-I1
B01290227-S4
01/16/2026
Objection resolved — Addressed
12/24/2025
Objection resolved — Addressed
Latest 60 of 95 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RUBI MANAGEMENT1609/14/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/03/2026$1.1M—— → —$283/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BORIS BALKHIYEV, PE207/22/2026
SHAHRISH SHUVO ENGINEERING P.C.105/19/2026
MOHAMMAD AHEAD, PE305/13/2026
VASILIOS ARTEMIOU PE204/22/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPRESS FILING INC803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
REVAMP NYC CORPGeneral Contractor307/08/2026
ARCO PLBG AND HTG INCFire Protection107/03/2026
PIPE SOLUTIONS ADVIS INCPlumbing106/17/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SHAHRISH SHUVO ENGINEERIN8524707/22/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offREVAMP NYC CORP05/21/2026
DOB NOWMechanical SystemsSigned-offREVAMP NYC CORP05/08/2026
DOB NOWSprinklersSigned-offARCO PLBG AND HTG INC05/07/2026
DOB NOWGeneral ConstructionPermit IssuedREVAMP NYC CORP04/15/2026
DOB NOWPlumbingSigned-offPIPE SOLUTIONS ADVIS INC04/15/2026
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
06/03/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/01/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/01/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/01/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/07/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/22/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 39
DateRequirementInspectorRole
07/21/2026Permanent certificateShahrish Shuvoenergy_progress
07/21/2026Air barrier - visual inspectionShahrish Shuvoenergy_progress
07/21/2026Maintenance informationShahrish Shuvoenergy_progress
07/21/2026Fenestration areasShahrish Shuvoenergy_progress
07/21/2026Interior lighting powerShahrish Shuvoenergy_progress
07/21/2026Fenestration air leakageShahrish Shuvoenergy_progress
07/21/2026MeteringShahrish Shuvoenergy_progress
07/21/2026Structural Stability – Alterations of existing buildingsShahrish Shuvospecial
07/21/2026Fenestration and door U-factor and product ratingsShahrish Shuvoenergy_progress
07/21/2026Insulation placement and R valuesShahrish Shuvoenergy_progress
05/27/2026Energy Code Compliance InspectionsShahrish Shuvoprogress
05/27/2026HVAC-R and service water piping design and insulationShahrish Shuvoenergy_progress
05/27/2026HVAC-R and service water heating equipmentShahrish Shuvoenergy_progress
05/27/2026Maintenance informationShahrish Shuvoenergy_progress
05/27/2026HVAC-R and service water heating system controlsShahrish Shuvoenergy_progress
05/27/2026Fire-Resistant Penetrations and JointsShahrish Shuvospecial
05/12/2026Energy Code Compliance InspectionsShahrish Shuvoprogress
05/12/2026HVAC-R and service water piping design and insulationShahrish Shuvoenergy_progress
05/12/2026HVAC-R and service water heating equipmentShahrish Shuvoenergy_progress
05/12/2026Fire-Resistant Penetrations and JointsShahrish Shuvospecial
05/12/2026HVAC-R and service water heating system controlsShahrish Shuvoenergy_progress
05/12/2026Maintenance informationShahrish Shuvoenergy_progress
05/06/2026Sprinkler SystemsShahrish Shuvospecial
05/06/2026Post-installed AnchorsShahrish Shuvospecial
05/06/2026Fire-Resistant Penetrations and JointsShahrish Shuvospecial
Latest 25 of 39.
▾Documents — 43 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/17/2026B01290227-S3Request digital key ↗
08/17/2026B01290227-S2Request digital key ↗
08/17/2026B01290227-S4Request digital key ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications22
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/17/2026B01290227-S2Open ↗
08/17/2026B01290227-I1Open ↗
08/17/2026B01290227-P6Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/05/2026B01290227-P6Open ↗
08/26/2026B01290227-S3Open ↗
08/26/2026B01290227-S3Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/05/2026B01290227-P6Open ↗
09/01/2026B01290227-S2Open ↗
09/01/2026B01290227-P1Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist2
08/15/2026B01290227-P6Open ↗
08/15/2026B01290227-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B01290227-I1Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/17/2026B01290227-S2Open ↗
08/17/2026B01290227-P4Open ↗
08/17/2026B01290227-P1Open ↗
Showing 3 of 7 on file for this type
▸Other Documents3
▸DOB NOWProperty Ownership Certification2
08/15/2026B01290227-P6Open ↗
08/15/2026B01290227-I1Open ↗
▸DOB NOWFinal Survey1
08/15/2026B01290227-I1Open ↗