← Back
Two family frame
5102 BEVERLEY ROAD
BROOKLYN · BIN 3105335
💬 Discuss this project
1930Year Built
2.5Stories
B2Building Class
R4Zoning
3,000 sfGross Floor Area
2Units
Two family frame · 2,240 sf lot · 1.34 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Cellar2p · 2 filings · 11 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/29/2021$650K—Private party → CRRMJ LLC$217/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SUPERIOR HOME INSPECTION SERVICES205/04/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
S Y CONSULTING VIOLATIONS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KBJ CONSTRUCTION CORPGeneral Contractor203/21/2026
ALL PRO PLBG & HTG INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SUPERIOR - HOME INSPECTIO1804205/04/2021
Building Lifecycle
All (16)Filed (2)Permit Issued (3)Signed Off (2)Inspection (5)Special Inspection (4)
09/01/2021
Signed off — Alteration
REPLACE EXISTING BATHROOM FIXTURES ON FIRST FLOOR AND TWO CELLAR HALF BATHROOMS ON EXISTING ROUGH-IN. REPLACE TWO EXISTING METER BARS WITH TWO NEW 1 INCH METER BARS. REPLACE ONE BOILER AND ONE HOT WATER HEATER. INSTALL ONE NEW BOILER AND HOT WATER HEATER
B00508214-I1
09/01/2021
Signed off — Alteration
REPLACE SHEETROCK PARTITIONS AND CEILINGS IN EXISTING FIRST FLOOR HALF BATHROOM AND TWO CELLAR HALF BATHROOMS. NO CHANGE IN USE EGRESS, BULK OR OCCUPANCY.
B00508200-I1
08/26/2021
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/05/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/11/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/11/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/11/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/09/2021
Permit issued — Plumbing
B00508214-I1-PL
05/18/2021
Permit issued — Plumbing
B00508214-I1-PL
05/17/2021
Permit issued — General Construction
B00508200-I1-GC
05/04/2021
Filed — Alteration
REPLACE EXISTING BATHROOM FIXTURES ON FIRST FLOOR AND TWO CELLAR HALF BATHROOMS ON EXISTING ROUGH-IN. REPLACE TWO EXISTING METER BARS WITH TWO NEW 1 INCH METER BARS. REPLACE ONE BOILER AND ONE HOT WATER HEATER. INSTALL ONE NEW BOILER AND HOT WATER HEATER
B00508214-I1
05/04/2021
Filed — Alteration
REPLACE SHEETROCK PARTITIONS AND CEILINGS IN EXISTING FIRST FLOOR HALF BATHROOM AND TWO CELLAR HALF BATHROOMS. NO CHANGE IN USE EGRESS, BULK OR OCCUPANCY.
B00508200-I1
05/03/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Steven Williams
05/03/2021
Special inspection requirement — Maintenance information
Steven Williams
05/03/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Steven Williams
04/21/2021
Special inspection requirement — Final
Steven Williams
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offALL PRO PLBG & HTG INC06/09/2021
DOB NOWPlumbingSigned-offALL PRO PLBG & HTG INC05/18/2021
DOB NOWGeneral ConstructionSigned-offKBJ CONSTRUCTION CORP05/17/2021
2 projects · most recent 09/07/2021
General Wiring
FiledStatusContractorScope
09/07/2021CompleteDYNAMO ELECTRICAL CORPGeneral Wiring
08/31/2021CompleteDYNAMO ELECTRICAL CORP3 meters, 3 new_meters
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
08/26/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/05/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/11/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/11/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/11/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
05/03/2021Fire-Resistant Penetrations and JointsSteven Williamsspecial
05/03/2021Maintenance informationSteven Williamsenergy_progress
05/03/2021Fire-Resistant Penetrations and JointsSteven Williamsspecial
04/21/2021FinalSteven Williamsprogress
▾Documents — 11 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
09/01/2026B00508200-I1Request digital key ↗
09/01/2026B00508214-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature2
09/01/2026B00508200-I1Open ↗
09/01/2026B00508214-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/27/2026B00508200-I1Open ↗
08/26/2026B00508214-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/27/2026B00508200-I1Open ↗
08/26/2026B00508214-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
09/01/2026B00508200-I1Open ↗
09/01/2026B00508214-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
09/01/2026B00508214-I1Open ↗