← Back
Three families
704 EAST 51 STREET
BROOKLYN · BIN 3105739
💬 Discuss this project
1935Year Built
2Stories
C0Building Class
R4Zoning
3,356 sfGross Floor Area
3Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Three families · 2,250 sf lot · 1.49 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectrical
Roof4p · 2 filings · 8 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TOM PETERSEN ARCHITECT, LLC203/02/2026
WITHDRAWN112/29/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SOLAR CONTRACTING LLCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
THOMAS PETERSEN ARCHITECT7854203/02/2026
Building Lifecycle
All (33)Filed (3)Permit Issued (1)Signed Off (1)Violation (10)Objection (16)Special Inspection (2)
05/05/2026
Signed off — Alteration
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONIC GENERATING SYSTEM.ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEING APPROVED AND/OR PERMITTED BY THENYC DEPARTMENT OF BUILDINGS.*NO CHANGE TO USE, EGRESS OR OCCUPANCY.*
B01303174-I1
03/09/2026
Objection resolved — Addressed
03/06/2026
Objection raised — Fire_Protection
03/02/2026
Filed — Alteration
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONIC GENERATING SYSTEM.ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEING APPROVED AND/OR PERMITTED BY THENYC DEPARTMENT OF BUILDINGS.*NO CHANGE TO USE, EGRESS OR OCCUPANCY.*
B01303174-P1
02/20/2026
Objection raised — Energy
02/20/2026
Objection raised — Structural
02/20/2026
Objection raised — Cost
02/20/2026
Objection raised — Energy
02/20/2026
Objection raised — Inspections
02/20/2026
Objection raised — Structural
02/03/2026
Objection resolved — Addressed
01/22/2026
Objection raised — Admin
01/05/2026
Permit issued — Solar
B01303174-I1-SL
12/29/2025
Filed — Alteration
We are proposing to remove an existing skylight on the flat roof at this location and to fill in the opening with new roof construction, to be completely air-tight and water-tight
B01338916-I1
12/22/2025
Objection resolved — Addressed
12/22/2025
Objection resolved — Addressed
12/22/2025
Special inspection requirement — Wood – Seismic Resistance
12/22/2025
Special inspection requirement — Final
11/13/2025
Objection resolved — Addressed
11/03/2025
Objection raised — Electrical
11/03/2025
Objection raised — Other
11/03/2025
Objection raised — Other
10/22/2025
Filed — Alteration
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONIC GENERATING SYSTEM.ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEING APPROVED AND/OR PERMITTED BY THENYC DEPARTMENT OF BUILDINGS.*NO CHANGE TO USE, EGRESS OR OCCUPANCY.*
B01303174-I1
04/09/2024
Violation issued (HPD, closed)
A
03/22/2023
Violation issued (HPD, closed)
A
11/04/2022
Violation issued (HPD, closed)
I
02/24/2022
Violation issued (HPD, closed)
A
02/24/2022
Violation issued (HPD, closed)
I
04/08/2021
Violation issued (HPD, closed)
A
04/08/2021
Violation issued (HPD, closed)
I
11/07/2016
Violation issued (HPD, closed)
I
10/08/2015
Violation issued (HPD, closed)
I
02/18/2015
Violation issued (HPD, closed)
I
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSOLAR CONTRACTING LLC01/05/2026
2 projects · most recent 03/30/2026
FiledStatusContractorScope
03/30/2026CompleteSOLAR ELEC CONTRACTNG LLC6 meters, 3 new_meters
10/14/2025CompleteVILLAGE ELECTL CONTRS INC—
1 project · most recent 12/29/2025
Wood
FiledStatusContractorScope
12/29/2025——Wood
1 project · most recent 03/02/2026
FiledStatusContractorScope
03/02/2026Signed-offSOLAR CONTRACTING LLC56 panels, 24.08 kw, 1,067.97 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
12/22/2025Wood – Seismic Resistance—special
12/22/2025Final—progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/18/2026B01303174-P1Request digital key ↗
08/18/2026B01303174-I1Request digital key ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/18/2026B01303174-P1Open ↗
08/18/2026B01303174-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/18/2026B01303174-P1Open ↗
08/18/2026B01303174-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/18/2026B01303174-I1Open ↗