DOB08/14/2025ENGR RPR INDENTIFIES UNDESIGNED,UNPERMITTED GUT RENO,SHORING, EXCAVATION &FDN WORK.BLDG COMPROMISED REQ'D TEMP STABILIZATION & BIWKLY INSPCTN.COMPLY W CODE.RETAIN NYS PE&GC 2 STABILIZE BLDG,PRE- FILE PLANS BY 815,PLANS BY 818,STRT BY 8/25,DAILY WRK RPRTS,INSPTN
ECB08/05/2025FAILURE TO SAFEGUARD THE PUBLIC AND PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS. AT TIME OF INSPECTION, OBSERVED OPEN & UNGUARDED EXCAVATED PIT LOCATED AT REAR YARD OF THE BUILDING EXP3 APPROX. 13'FT(L) X 30'F$10K due
ECB08/05/2025WORK WITHOUT PERMIT. ATOI, OBSERVED LARGE EXCAVATED PIT LOCATED AT REAR YARD OF THE BUILDING EXPOSURE 3 APPROX. 13'FT(L) X 30'FT(W), AND 6'FT DEEP WITH UNCAPPED REBARS PROTRUDING APPROX. 4'FT FROM BOTTOM OF THE$12K due
DOB08/05/2025WORK WITHOUT PERMIT. ATOI, OBSERVED LARGE UNSUPPORTED EXCAVATED PIT AT REAR YARD OF THE BUILDING EXPOSURE 3 APPROX. 13'FT(L) X 30'FT(W), AND 6'FT DEEP WITH UNCAPPED REBARS PROTRUDING APPROX. 4'FT FROM BOTTOM OF THE PIT. NO SOE AT REAR & LEFT-SIDES. CREATING AN IMMEDIATELY HAZARDOUS CONDITION. NO PERMITS OR RECORDS ON BIS/DOB NOW FOR WORKED