← Back
Two family frame
113 EAST 45 STREET
BROOKLYN · BIN 3107639
💬 Discuss this project
1950Year Built
1Stories
B2Building Class
R6Zoning
1,720 sfGross Floor Area
2Units
Two family frame · 2,000 sf lot · 0.86 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 7 docs
Basement1p · 1 filing · 7 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SQUARE ARCH, LLC109/03/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SOURCE ELECTRIC INCElectrical103/22/2026
SUSTAINABLE STRATEGIESGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SQ. ARCH, LLC4802109/03/2025
Building Lifecycle
All (7)Filed (1)Signed Off (1)Special Inspection (5)
04/13/2026
Signed off — Alteration
INSTALLATION OF SOLAR ELECTRIC GENERATION SYSTEM FOR UTILITY INTERCONNECTION
B01281151-I1
09/03/2025
Filed — Alteration
INSTALLATION OF SOLAR ELECTRIC GENERATION SYSTEM FOR UTILITY INTERCONNECTION
B01281151-I1
09/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Chun Feng
09/03/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Chun Feng
09/03/2025
Special inspection requirement — Energy Code Compliance Inspections
Chun Feng
09/03/2025
Special inspection requirement — Final
Chun Feng
09/03/2025
Special inspection requirement — Air barrier - visual inspection
Chun Feng
Nothing on file for this building.
1 project · most recent 01/12/2026
FiledStatusContractorScope
01/12/2026CompleteSOURCE ELECTRIC INC1 meters
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
09/03/2025Fire-Resistant Penetrations and JointsChun Fengspecial
09/03/2025Structural Stability – Alterations of existing buildingsChun Fengspecial
09/03/2025Energy Code Compliance InspectionsChun Fengprogress
09/03/2025FinalChun Fengprogress
09/03/2025Air barrier - visual inspectionChun Fengenergy_progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/20/2026B01281151-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
08/25/2026B01281151-I1Open ↗
08/25/2026B01281151-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026B01281151-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/25/2026B01281151-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B01281151-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/20/2026B01281151-I1Open ↗