1930Year Built
3Stories
S2Building Class
R6Zoning
2,840 sfGross Floor Area
3Units
9 Open Violations 8 unresolved · 1 paperwork only ▸FDNY Report ↗
Primarily 2 family with 1 store or office · 940 sf lot · 3.02 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 13p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WINNING EXPEDITING SERVICE1407/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
WILLIAM LAMARTINA PE504/25/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WINNING EXPEDITING SERVICE1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PLBG MECHANICAL AND PIPINGGeneral Contractor303/21/2026
HIGHLAND PLUMBING LLCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
G ENGINEERING PC7778604/25/2025
Building Lifecycle
All (96)Filed (5)Permit Issued (2)Violation (53)Inspection (6)Special Inspection (30)
08/04/2025
Violation issued (HPD, closed)
I
08/02/2025
Violation issued (HPD, closed)
C
08/02/2025
Violation issued (HPD, closed)
B
08/02/2025
Violation issued (HPD, closed)
B
08/02/2025
Violation issued (HPD, closed)
C
08/02/2025
Violation issued (HPD, closed)
B
08/02/2025
Violation issued (HPD, closed)
C
08/02/2025
Violation issued (HPD, closed)
B
06/20/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
06/03/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/06/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
05/01/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIONGCAI GU
04/29/2025
Special inspection requirement — Exhaust and Vent Systems in Plenums and Ducts
XIONGCAI GU
04/29/2025
Special inspection requirement — Mechanical Systems
XIONGCAI GU
04/29/2025
Special inspection requirement — Tenant Protection Plan Compliance
XIONGCAI GU
04/29/2025
Special inspection requirement — Energy Code Compliance Inspections
WILLIAM LAMARTINA
04/29/2025
Special inspection requirement — Final
WILLIAM LAMARTINA
04/29/2025
Special inspection requirement — Shutoff dampers
WILLIAM LAMARTINA
04/29/2025
Special inspection requirement — Duct leakage testing, insulation and design
WILLIAM LAMARTINA
04/29/2025
Special inspection requirement — Maintenance information
WILLIAM LAMARTINA
04/29/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
WILLIAM LAMARTINA
04/29/2025
Special inspection requirement — Fenestration areas
WILLIAM LAMARTINA
04/29/2025
Special inspection requirement — Metering
WILLIAM LAMARTINA
04/29/2025
Special inspection requirement — Fenestration air leakage
WILLIAM LAMARTINA
04/25/2025
Filed — Alteration
RENOVATE EXISTING STORE AS DELI STORE, INSTALL EXHAUST HOOD AND VENTILATOR, PLUMBING WORK AND FIRE SUPRESSION (FP) WILL BE FILED SEPARATELY. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
B01074342-P3
01/30/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/30/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/24/2025
Permit issued — Plumbing
B01074342-S2-PL
01/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIONGCAI GU
01/10/2025
Special inspection requirement — HVAC-R and service water heating equipment
WILLIAM LAMARTINA
01/10/2025
Special inspection requirement — Maintenance information
WILLIAM LAMARTINA
01/10/2025
Special inspection requirement — HVAC-R and service water heating system controls
WILLIAM LAMARTINA
01/10/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
WILLIAM LAMARTINA
01/10/2025
Special inspection requirement — Energy Code Compliance Inspections
WILLIAM LAMARTINA
01/10/2025
Special inspection requirement — Tenant Protection Plan Compliance
XIONGCAI GU
01/08/2025
Filed — Alteration
RENOVATE EXISTING STORE AS DELI STORE, INSTALL EXHAUST HOOD AND VENTILATOR, PLUMBING WORK AND FIRE SUPRESSION (FP) WILL BE FILED SEPARATELY. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
B01074342-P2
01/07/2025
Special inspection requirement — HVAC-R and service water heating system controls
WILLIAM LAMARTINA
01/07/2025
Special inspection requirement — Tenant Protection Plan Compliance
01/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIONGCAI GU
01/07/2025
Special inspection requirement — Energy Code Compliance Inspections
WILLIAM LAMARTINA
01/07/2025
Special inspection requirement — HVAC-R and service water heating equipment
WILLIAM LAMARTINA
01/07/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
WILLIAM LAMARTINA
01/07/2025
Special inspection requirement — Maintenance information
WILLIAM LAMARTINA
12/03/2024
Violation issued (HPD, closed)
B
12/03/2024
Violation issued (HPD, closed)
A
12/03/2024
Violation issued (HPD, closed)
B
12/03/2024
Violation issued (HPD, closed)
B
12/03/2024
Violation issued (HPD, closed)
B
12/03/2024
Violation issued (HPD, closed)
B
12/03/2024
Violation issued (HPD, closed)
B
07/16/2024
Permit issued — General Construction
B01074342-I1-GC-CX
07/11/2024
Filed — Alteration
RENOVATE EXISTING STORE AS DELI STORE, INSTALL EXHAUST HOOD AND VENTILATOR, PLUMBING WORK AND FIRE SUPRESSION (FP) WILL BE FILED SEPARATELY. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
B01074342-P1
07/11/2024
Special inspection requirement — Shutoff dampers
WILLIAM LAMARTINA
07/11/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
WILLIAM LAMARTINA
07/11/2024
Special inspection requirement — HVAC-R and service water heating system controls
WILLIAM LAMARTINA
07/07/2024
Filed — Alteration
RENOVATE EXISTING STORE AS DELI STORE, INSTALL EXHAUST HOOD AND VENTILATOR, PLUMBING WORK AND FIRE SUPRESSION (FP) WILL BE FILED SEPARATELY. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
B01074342-S2
07/03/2024
Filed — Alteration
RENOVATE EXISTING STORE AS DELI STORE, INSTALL EXHAUST HOOD AND VENTILATOR, PLUMBING WORK AND FIRE SUPRESSION (FP) WILL BE FILED SEPARATELY. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
B01074342-I1
06/25/2024
Violation issued (HPD, closed)
B
06/25/2024
Violation issued (HPD, closed)
B
Latest 60 of 96 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offHIGHLAND PLUMBING LLC01/24/2025
DOB NOWGeneral ConstructionSigned-offPLBG MECHANICAL AND PIPIN07/16/2024
1 project · most recent 04/25/2025
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/25/2025Signed-offPLBG MECHANICAL AND PIPINAir Conditioning Systems, Ventilation Systems
Cooling
Ameristar M4AC3060B1000NA 60,000 BTU · Condensing Unit ×1
Copeland XFAM-022Z-CFV-081 19,000 BTU · Condensing Unit ×2
XFAM-030Z-CFV-081 27,500 BTU · Refrigeration Unit ×2
Ventilation
__Junk__ N.A 4,375 CFM · Kitchen Exhaust ×3
1 project · most recent 04/25/2025
Gas Water/Sanitary
FiledStatusContractorScope
04/25/2025Signed-offHIGHLAND PLUMBING LLCGas, Water/Sanitary
2 projects · most recent 11/20/2025
General Wiring
FiledStatusContractorScope
11/20/2025Permit IssuedALL POWER ELECT. INS CORP4 meters, 4 new_meters
10/06/2024Permit IssuedGREEN POWER ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
06/20/2025Pass-Final General Construction Non-Directive 14PassView ↗
06/03/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/06/2025Fail-Final General Construction Non-Directive 14FailView ↗
05/01/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/30/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/30/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 43
DateRequirementInspectorRole
04/29/2025Fire-Resistant Penetrations and JointsXIONGCAI GUspecial
04/29/2025Exhaust and Vent Systems in Plenums and DuctsXIONGCAI GUspecial
04/29/2025Mechanical SystemsXIONGCAI GUspecial
04/29/2025Tenant Protection Plan ComplianceXIONGCAI GUspecial
04/29/2025Energy Code Compliance InspectionsWILLIAM LAMARTINAprogress
04/29/2025FinalWILLIAM LAMARTINAprogress
04/29/2025Shutoff dampersWILLIAM LAMARTINAenergy_progress
04/29/2025Duct leakage testing, insulation and designWILLIAM LAMARTINAenergy_progress
04/29/2025Maintenance informationWILLIAM LAMARTINAenergy_progress
04/29/2025Fenestration and door U-factor and product ratingsWILLIAM LAMARTINAenergy_progress
04/29/2025Fenestration areasWILLIAM LAMARTINAenergy_progress
04/29/2025MeteringWILLIAM LAMARTINAenergy_progress
04/29/2025Fenestration air leakageWILLIAM LAMARTINAenergy_progress
01/10/2025Fire-Resistant Penetrations and JointsXIONGCAI GUspecial
01/10/2025HVAC-R and service water heating equipmentWILLIAM LAMARTINAenergy_progress
01/10/2025Maintenance informationWILLIAM LAMARTINAenergy_progress
01/10/2025HVAC-R and service water heating system controlsWILLIAM LAMARTINAenergy_progress
01/10/2025HVAC-R and service water piping design and insulationWILLIAM LAMARTINAenergy_progress
01/10/2025Energy Code Compliance InspectionsWILLIAM LAMARTINAprogress
01/10/2025Tenant Protection Plan ComplianceXIONGCAI GUspecial
01/07/2025HVAC-R and service water heating system controlsWILLIAM LAMARTINAenergy_progress
01/07/2025Tenant Protection Plan Compliance—special
01/07/2025Fire-Resistant Penetrations and JointsXIONGCAI GUspecial
01/07/2025Energy Code Compliance InspectionsWILLIAM LAMARTINAprogress
01/07/2025HVAC-R and service water heating equipmentWILLIAM LAMARTINAenergy_progress
Latest 25 of 43.
▾Documents — 49 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/24/2026B01074342-P3Request digital key ↗
08/24/2026B01074342-S2Request digital key ↗
08/24/2026B01074342-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications39
▸DOB NOWProgress Inspector Seal & Signature26
08/26/2026B01074342-I1Open ↗
08/26/2026B01074342-I1Open ↗
08/26/2026B01074342-I1Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
08/26/2026B01074342-I1Open ↗
08/26/2026B01074342-I1Open ↗
08/26/2026B01074342-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/24/2026B01074342-I1Open ↗
08/24/2026B01074342-P3Open ↗
08/24/2026B01074342-P1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/24/2026B01074342-P1Open ↗
08/24/2026B01074342-P2Open ↗
08/24/2026B01074342-S2Open ↗
Showing 3 of 5 on file for this type