← Back
Primarily 2 family with 1 store or office
4613 CHURCH AVENUE
BROOKLYN · BIN 3109217
💬 Discuss this project
1931Year Built
2Stories
S2Building Class
R5Zoning
2,600 sfGross Floor Area
3Units
Rent Stabilized3 Open Violations ▸FDNY Report ↗
Primarily 2 family with 1 store or office · 2,088 sf lot · 1.25 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 11p · 1 filing · 3 docs
Cellar2p · 3 filings · 7 docs
1 job · most recent 01/11/2025
Heating and Air Conditioning Systems
FiledStatusContractorScope
01/11/2025——Heating and Air Conditioning Systems
1 job · most recent 01/11/2025
Water/Sanitary
FiledStatusContractorScope
01/11/2025——Water/Sanitary
Building Lifecycle
All (65)Filed (3)Violation (22)Objection (34)Special Inspection (6)
11/24/2025
Violation issued (HPD, open)
I
03/06/2025
Objection raised — Other
03/06/2025
Objection raised — Other
03/06/2025
Objection raised — Other
03/06/2025
Objection resolved — Addressed
02/21/2025
Objection raised — Other
02/21/2025
Objection raised — Other
02/20/2025
Objection resolved — Resolved
02/11/2025
Objection resolved — Addressed
02/11/2025
Objection resolved — Addressed
02/11/2025
Objection resolved — Addressed
02/11/2025
Objection resolved — Addressed
02/11/2025
Objection resolved — Addressed
01/28/2025
Objection resolved — Addressed
01/28/2025
Objection resolved — Addressed
01/28/2025
Objection resolved — Addressed
01/28/2025
Objection resolved — Addressed
01/28/2025
Objection resolved — Addressed
01/28/2025
Objection resolved — Addressed
01/17/2025
Objection resolved — Addressed
01/16/2025
Objection raised — Plumbing
01/16/2025
Objection raised — Plumbing
01/16/2025
Objection raised — Plumbing
01/16/2025
Objection raised — Other
01/16/2025
Objection raised — Plumbing
01/16/2025
Objection raised — Plumbing
01/14/2025
Objection raised — Admin
01/11/2025
Filed — Alteration
RENOVATION OF EXISTING USE GROUP 6 STORE 6 NEW GAS FIXTURES NEW 2, 3 POT SINK 3 NEW HAND SINK NEW ICE SINK AND NEW FLOOR DRAIN. NO CHANGE TO USE EGRESS OR OCCUPANCY.
B01115826-I1
01/11/2025
Filed — Alteration
NEW KITCHEN HOOD OVER EXISTING FIXTURES ALL AS PER PLAN
B01115801-I1
12/03/2024
Violation issued (HPD, open)
I
10/31/2024
Objection raised — Other
10/31/2024
Objection raised — Other
10/31/2024
Objection raised — Other
10/31/2024
Objection raised — Other
10/31/2024
Objection raised — Other
10/31/2024
Objection raised — Other
10/31/2024
Objection raised — Other
10/31/2024
Objection raised — Other
10/24/2024
Filed — Alteration
PLANS FILE TO RENOVATE EXISTING EATING AND DRINKING ESTABLISHMENT WITH NEW KITCHEN FIXTURES AND RENOVATION OF EXISTING BAR ALL AS PER PLAN NO CHANGE TO USE OR OCCUPANCY
B01127492-I1
10/24/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
10/24/2024
Special inspection requirement — Energy Code Compliance Inspections
10/24/2024
Special inspection requirement — Final
10/22/2024
Special inspection requirement — Fire-Resistance Rated Construction
09/23/2024
Special inspection requirement — Mechanical Systems
09/23/2024
Special inspection requirement — Final
12/02/2023
Violation issued (HPD, closed)
B
12/02/2023
Violation issued (HPD, closed)
B
02/12/2020
Violation issued (HPD, closed)
I
02/07/2020
Violation issued (HPD, closed)
C
02/07/2020
Violation issued (HPD, closed)
C
02/07/2020
Violation issued (HPD, closed)
B
02/07/2020
Violation issued (HPD, closed)
B
02/07/2020
Violation issued (HPD, closed)
B
02/07/2020
Violation issued (HPD, closed)
B
02/07/2020
Violation issued (HPD, closed)
B
02/07/2020
Violation issued (HPD, closed)
B
02/07/2020
Violation issued (HPD, closed)
B
01/20/2012
Violation issued (HPD, closed)
B
01/31/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/16/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 65 events.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MCCRAY ARCHITECT P.C.301/11/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARCHVISION DESIGN STUDIO303/21/2026
D W G SERVICES303/21/2026
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
10/24/2024Fire-Resistant Penetrations and Joints—special
10/24/2024Energy Code Compliance Inspections—progress
10/24/2024Final—progress
10/22/2024Fire-Resistance Rated Construction—progress
09/23/2024Mechanical Systems—special
09/23/2024Final—progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/23/2026B01115826-I1Request digital key ↗
08/23/2026B01115801-I1Request digital key ↗
08/15/2026B01127492-I1Request digital key ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/23/2026B01115826-I1Open ↗
08/23/2026B01115801-I1Open ↗
08/13/2026B01127492-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B01127492-I1Open ↗