DOB02/24/2026AT 3316 CHURCH AVENUE, ERECT APPROX 25 LF OF SIDEWALK SHED AT EXPOSURE 1
DOB02/24/2026ERECT APPROX 30 LF OF TIGHT-BOARD CONSTRUCTION FENCE AT EXP 1
DOB02/21/2026REQUESTING ENGINNERS REPORT FOR STRUCTURAL STABILITY OF CORNICE. UPON INSPECTION OBSERVED CORNICE DISLODGED AND LOOSE POTENTIAL OF COLLAPSIN G..OWNER TO HIRE NYSPE TO SUBMIT REPORT TO ERTINSPECTIONS@BUILDINGS.NY C.GOV ADDRESSING ALL CONDITIONS WITH PLANS , PHOTOS AND TIME FRAME FOR REPAIRS TO BE COMPLETED
DOB02/21/2026STRUCTURE RENDERED NON COMPLIANT.AT TIME OF INSPECTION OBSERVED BUILDI NG SUSTAINED EXTENSIVE FIRE, WATER AND SMOKE DAMAGE CAILING DAMAGE BRO KEN AND MISSING WINDOWS,OPEN ROOF EXPOSE TO ALL ELEMENTS DUE TO FIRE AT 3322 CHURCH AVENUE.ALSO CORNICE DAMAGE . MAINTAIN BUILDING IN CODE COMPLAINT MANNER
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
DOB08/16/1993V-DOB VIOLATION - ACTIVE
ECB08/01/2019SEC. 28-201.1 FAILURE TO PROVIDE VENTILATION TO GAS METER ROOM PER P115.6(1968)CODE,FGC APPENDIX E(E4)(2014)CODE. NOTED: AT CELLAR LEVEL GAS METER ROOM DOES NOT HAVE FRESH AIR VENTILATION IN THAT AREA.Nothing owed — awaiting certificate of correction