← Back
Single or multiple dwelling with stores or offices
3424 CHURCH AVENUE
BROOKLYN · BIN 3109425
💬 Discuss this project
1931Year Built
2Stories
S9Building Class
R5Zoning
4,000 sfGross Floor Area
6Units
Rent Stabilized26 Open Violations 25 unresolved · 1 paperwork only ▸FDNY Report ↗
Single or multiple dwelling with stores or offices · Owner of record: HUMBLE PIE REALTY, LLC · 2,290 sf lot · 1.75 FAR built · Flood zone X
Locations of Work
Plumbing
Cellar2p · 1 filing · 5 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SUPERIOR HOME INSPECTION SERVICES501/15/2026
ASR ENGINEERING PC204/09/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TOPLINE NYC INCGeneral Contractor307/30/2026
FRANCIS RICHARDSElectrical203/21/2026
HERMAN LAMBEYElectrical203/21/2026
SHA HOME IMPROVEMENTS INCGeneral Contractor203/21/2026
ACTIVE PLBG & HTG CORPPlumbing107/08/2026
DIEPPA, ANDRESElectrical103/21/2026
CERRITO, ROBERTElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SUPERIOR - HOME INSPECTIO1804501/15/2026
MCHENERY TESTING LAB9181101/14/2025
SYED ENGINEERING, P.C.7054104/08/2024
Building Lifecycle
All (112)Filed (7)Permit Issued (5)Signed Off (2)Violation (60)Inspection (5)Objection (16)Special Inspection (17)
07/29/2026
Permit issued — General Construction
B01346539-I1-GC
02/18/2026
Objection resolved — Addressed
02/18/2026
Objection resolved — Addressed
02/09/2026
Objection resolved — Addressed
02/04/2026
Objection raised — Scope
02/04/2026
Objection raised — Admin
02/04/2026
Objection raised — Admin
01/15/2026
Filed — Alteration
AS PER PLANS, AT EXPOSURES 1 & 2, REPLACE DAMAGED AND DEFECTIVE BRICKWORK ABOVE OR AROUND 3 SECOND FLOOR WINDOWS. REPLACE RUSTED LINTELS AT SAME. THIS APPLICATION SUPERSEDES JOB #B01031916-I1. NO CHANGE IN USE, EGRESS, BULK OR OCCUPANCY.
B01346539-I1
01/14/2026
Special inspection requirement — Fenestration air leakage
Steven Williams
01/14/2026
Special inspection requirement — Energy Code Compliance Inspections
Steven Williams
01/14/2026
Special inspection requirement — Tenant Protection Plan Compliance
Steven Williams
01/14/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Steven Williams
01/14/2026
Special inspection requirement — Masonry
Steven Williams
10/22/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/03/2025
Violation issued (FDNY_ORDER, closed)
10/03/2025
Violation issued (FDNY_ORDER, closed)
10/03/2025
Violation issued (FDNY_ORDER, closed)
04/16/2025
Signed off — Alteration
AT EXP. 1, REPL. STOREFRONT WINDOW, ROLL DOWN GATE, FRAMING, DOOR & BRICKWORK CAUSED BY CAR ACCIDENT. AT EXP. 2, REPAIR/REPLACE FENCE & BRICKWORK DAMAGED BY SAME. ALSO, REPAIR CRACKS FOUND IN THE AREA OF CONCERN & ANY DAMAGED CINDER BLOCK UNDERLAY.
B01164794-I1
04/14/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/27/2025
Permit issued — General Construction
B01164794-I1-GC
01/21/2025
Objection raised — Inspections
01/21/2025
Objection resolved — Addressed
01/21/2025
Objection raised — Scope
01/21/2025
Objection resolved — Addressed
01/21/2025
Objection raised — Other
01/21/2025
Objection resolved — Addressed
01/21/2025
Objection raised — Inspections
01/21/2025
Objection resolved — Addressed
01/21/2025
Objection raised — Scope
01/21/2025
Objection resolved — Addressed
01/21/2025
Special inspection requirement — Energy Code Compliance Inspections
Steven Williams
01/14/2025
Filed — Alteration
AT EXP. 1, REPL. STOREFRONT WINDOW, ROLL DOWN GATE, FRAMING, DOOR & BRICKWORK CAUSED BY CAR ACCIDENT. AT EXP. 2, REPAIR/REPLACE FENCE & BRICKWORK DAMAGED BY SAME. ALSO, REPAIR CRACKS FOUND IN THE AREA OF CONCERN & ANY DAMAGED CINDER BLOCK UNDERLAY.
B01164794-I1
01/09/2025
Special inspection requirement — Masonry
Steven Williams
01/09/2025
Special inspection requirement — Tenant Protection Plan Compliance
TREVOR O. FLOWERS
01/09/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Steven Williams
01/09/2025
Special inspection requirement — Fenestration air leakage
Steven Williams
11/18/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/18/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/18/2024
Permit issued — General Construction
B01031916-I1-GC
04/12/2024
Permit issued — Sidewalk Shed
B01031748-I1-SH
04/09/2024
Filed — Alteration
B01031748-I1
04/08/2024
Filed — Alteration
PROPOSED OF RUSTED WINDOW LINTELS AND CRACKED BRICKS TO BE DONE AS NEEDED AS PER PLANS .NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01031916-I1
04/08/2024
Special inspection requirement — Masonry
RAFI HAMID
04/08/2024
Special inspection requirement — Final
RAFI HAMID
04/08/2024
Special inspection requirement — Tenant Protection Plan Compliance
RAFI HAMID
02/23/2022
Violation issued (HPD, closed)
A
01/18/2022
Signed off — Alteration
INSTALL 1-50 LB GREASE TRAP, 1-150 LB GREASE TRAP & 6 NEW FL. DRAINS IN OPEN CELLAR FL. CAP & REMOVE BACKFLOW IN WRONG LOCATION. INSTALL NEW CHECK VALVE BETWEEN BOILER & BACKFLOW. NO EXISTING BUILDING MATERIALS TO BE DISTURBED UNDER THIS APPLICATION.
B00601395-I1
12/03/2021
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/03/2021
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/02/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/02/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/04/2021
Permit issued — Plumbing
B00601395-I1-PL
10/19/2021
Filed — Alteration
FORM NEW CONCRETE PAD UNDER EXISTING BOILER. NO EXISTING BUILDING MATERIALS TO BE DISTURBED UNDER THIS APPLICATION. NO CHANGE IN USE, EGRESS, BULK OR OCCUPANCY.
B00614392-I1
10/19/2021
Special inspection requirement — Concrete - Cast-In-Place
Steven Williams
10/19/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Steven Williams
10/19/2021
Special inspection requirement — Final
Steven Williams
10/18/2021
Filed — Alteration
INSTALL 1-50 LB GREASE TRAP, 1-150 LB GREASE TRAP & 6 NEW FL. DRAINS IN OPEN CELLAR FL. CAP & REMOVE BACKFLOW IN WRONG LOCATION. INSTALL NEW CHECK VALVE BETWEEN BOILER & BACKFLOW. NO EXISTING BUILDING MATERIALS TO BE DISTURBED UNDER THIS APPLICATION.
B00601395-P1
10/18/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Steven Williams
09/28/2021
Filed — Alteration
INSTALL 1-50 LB GREASE TRAP, 1-150 LB GREASE TRAP & 6 NEW FL. DRAINS IN OPEN CELLAR FL. CAP & REMOVE BACKFLOW IN WRONG LOCATION. INSTALL NEW CHECK VALVE BETWEEN BOILER & BACKFLOW. NO EXISTING BUILDING MATERIALS TO BE DISTURBED UNDER THIS APPLICATION.
B00601395-I1
04/07/2021
Violation issued (HPD, closed)
A
Latest 60 of 112 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedTOPLINE NYC INC07/29/2026
DOB NOWGeneral ConstructionSigned-offSHA HOME IMPROVEMENTS INC02/27/2025
DOB NOWGeneral ConstructionPermit IssuedTOPLINE NYC INC04/18/2024
DOB NOWSidewalk ShedPermit IssuedTOPLINE NYC INC04/12/2024
DOB NOWPlumbingSigned-offACTIVE PLBG & HTG CORP11/04/2021
BISPLISSUEDDJ INTERNATIONAL PLBG INC03/01/2012
BISFPISSUEDLUND FIRE PROD. CO INC07/22/1999
BISFPISSUEDLUND FIRE PRODUCTS CO., INC.11/07/1994
BISOTISSUEDNA08/03/1994
1 project · most recent 04/15/2024
FiledStatusContractorScope
04/15/2024Permit IssuedRICHARD NEU—
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
04/14/2025Pass-Final General Construction Non-Directive 14PassView ↗
12/03/2021Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/03/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/02/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/02/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
01/14/2026Fenestration air leakageSteven Williamsenergy_progress
01/14/2026Energy Code Compliance InspectionsSteven Williamsprogress
01/14/2026Tenant Protection Plan ComplianceSteven Williamsspecial
01/14/2026Structural Stability – Alterations of existing buildingsSteven Williamsspecial
01/14/2026MasonrySteven Williamsspecial
01/21/2025Energy Code Compliance InspectionsSteven Williamsprogress
01/09/2025MasonrySteven Williamsspecial
01/09/2025Tenant Protection Plan ComplianceTREVOR O. FLOWERSspecial
01/09/2025Structural Stability – Alterations of existing buildingsSteven Williamsspecial
01/09/2025Fenestration air leakageSteven Williamsenergy_progress
04/08/2024MasonryRAFI HAMIDspecial
04/08/2024FinalRAFI HAMIDprogress
04/08/2024Tenant Protection Plan ComplianceRAFI HAMIDspecial
10/19/2021Concrete - Cast-In-PlaceSteven Williamsspecial
10/19/2021Fire-Resistant Penetrations and JointsSteven Williamsspecial
10/19/2021FinalSteven Williamsprogress
10/18/2021Fire-Resistant Penetrations and JointsSteven Williamsspecial
▾Documents — 45 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
09/01/2026B00601395-I1Request digital key ↗
09/01/2026B00601395-P1Request digital key ↗
09/01/2026B00614392-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
08/15/2012320440135Open ↗
02/27/2012320440135Open ↗
▸BISWORK PERMIT APPLICATION1
03/06/2012320440135Open ↗
▸Seals & Professional Certifications26
▸DOB NOWSpecial Inspector Seal & Signature10
09/01/2026B01164794-I1Open ↗
09/01/2026B01164794-I1Open ↗
08/28/2026B01031916-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
09/01/2026B00601395-I1Open ↗
09/01/2026B00601395-P1Open ↗
09/01/2026B00614392-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026B01164794-I1Open ↗
09/01/2026B01164794-I1Open ↗
08/28/2026B01031916-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
02/27/2012320440135Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
02/27/2012320440135Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
02/27/2012320440135Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING1
02/27/2012320440135Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
06/25/2012320440135Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
02/27/2012320440135Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/18/2026B01346539-I1Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY1
02/27/2012320440135Open ↗
▸Approvals, Objections & Sign-offs1
▸BISADMINISTRATIVE OBJECTIONS1
02/27/2012320440135Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
02/27/2012320440135Open ↗
▸Filing & Intake Forms2
▸BISADDITIONAL INFORMATION1
08/16/2012320440135Open ↗
▸BISEFILING COVER SHEET1
02/27/2012320440135Open ↗