← Back
One family attached or semi-detached
185 MAPLE STREET
BROOKLYN · BIN 3114768
💬 Discuss this project
1910Year Built
2Stories
A5Building Class
R2Zoning
1,768 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
One family attached or semi-detached · 2,000 sf lot · 0.88 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Floor 218p · 1 filing · 19 docs
Floor 118p · 1 filing · 19 docs
Sub-Basement13p · 1 filing · 19 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EP ENGINEERING LLC203/14/2025
YOSHINORI NITO ENGINEERING AND DESI203/26/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RAMPULLA ASSOCIATES ARCHITECTS803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PRIVILEGE CONSTRUCTION COGeneral Contractor407/08/2026
ALMA PLBG SPRINKLER INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
YOSHINORI NITO ENGINEERIN4702103/26/2024
Building Lifecycle
All (12)Filed (4)Permit Issued (3)Violation (1)Inspection (2)Special Inspection (2)
05/13/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/12/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/31/2025
Permit issued — Plumbing
B00988166-S2-PL
03/14/2025
Filed — Alteration
Partial Gut renovation of an existing townhouse including new plumbing fixtures and rough-in
B00988166-P1
10/03/2024
Permit issued — Structural
B00988166-S1-ST
07/29/2024
Permit issued — General Construction
B00988166-I1-GC
03/26/2024
Filed — Alteration
Partial Gut renovation of an existing townhouse including new plumbing fixtures and rough-in
B00988166-S1
03/26/2024
Filed — Alteration
Partial Gut renovation of an existing townhouse including new plumbing fixtures and rough-in
B00988166-S2
03/26/2024
Filed — Alteration
Partial Gut renovation of an existing townhouse including new plumbing fixtures and rough-in
B00988166-I1
02/21/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
YOSHINORI NITO
02/21/2024
Special inspection requirement — Final
YOSHINORI NITO
11/28/1988
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offSMART PLUMBING & HTG CORP03/31/2025
DOB NOWStructuralPermit IssuedPRIVILEGE CONSTRUCTION CO10/03/2024
DOB NOWGeneral ConstructionPermit IssuedPRIVILEGE CONSTRUCTION CO07/29/2024
1 project · most recent 03/14/2025
Water/Sanitary
FiledStatusContractorScope
03/14/2025Signed-offALMA PLBG SPRINKLER INCWater/Sanitary
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
05/13/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/12/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
02/21/2024Structural Stability – Alterations of existing buildingsYOSHINORI NITOspecial
02/21/2024FinalYOSHINORI NITOprogress
▾Documents — 19 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/25/2026B00988166-S1Request digital key ↗
08/25/2026B00988166-S2Request digital key ↗
08/25/2026B00988166-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits4
▸DOB NOWLPC Approval/Permit4
08/13/2026B00988166-S2Open ↗
08/13/2026B00988166-S1Open ↗
08/13/2026B00988166-I1Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/25/2026B00988166-S1Open ↗
08/25/2026B00988166-S2Open ↗
08/25/2026B00988166-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature1
08/24/2026B00988166-S1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/24/2026B00988166-S1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/25/2026B00988166-S2Open ↗
08/25/2026B00988166-S1Open ↗
08/25/2026B00988166-I1Open ↗
Showing 3 of 4 on file for this type
▸Other Documents1
▸DOB NOWProof of Historic Building1
08/13/2026B00988166-I1Open ↗