← Back
Three families
39 HAWTHORNE STREET
BROOKLYN · BIN 3115537
💬 Discuss this project
1905Year Built
2Stories
C0Building Class
R6Zoning
3,177 sfGross Floor Area
3Units
Rent Stabilized26 Open Violations ▸FDNY Report ↗
Three families · 2,500 sf lot · 1.27 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Permit Issued — active, not yet Signed-off
CellarUnder Construction1p · 1 filing · 20 docs
BasementUnder Construction1p · 1 filing · 20 docs
Sub-BasementUnder Construction5p · 1 filing · 20 docs
2 jobs · most recent 03/31/2026
Gas Water/Sanitary
FiledStatusContractorScope
03/31/2026Permit IssuedH BRONNER & SON PLBG & HTGas, Water/Sanitary
08/22/2023——Gas, Water/Sanitary
1 job · most recent 10/02/2025
General Wiring
FiledStatusContractorScope
10/02/2025Permit IssuedCONDE ELECTRIC INCGeneral Wiring
1 job · most recent 03/31/2026
Steel
FiledStatusContractorScope
03/31/2026Permit IssuedNEIL INNOVATIVE CONST.INCSteel
Building Lifecycle
All (83)Filed (7)Permit Issued (4)Violation (28)Inspection (1)Objection (26)Special Inspection (17)
06/10/2026
Permit issued — General Construction
B01188212-I1-GC
05/04/2026
Violation issued (HPD, open)
A
04/15/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/31/2026
Filed — Alteration
Renovation of an existing basement with plumbing and partition work. No change in use, occupancy or exit.
B01188212-P3
03/27/2026
Filed — Alteration
Renovation of an existing basement with plumbing and partition work. No change in use, occupancy or exit.
B01188212-P1
03/27/2026
Filed — Alteration
Renovation of an existing basement with plumbing and partition work. No change in use, occupancy or exit.
B01188212-P2
12/29/2025
Permit issued — Structural
B01188212-S2-ST
11/25/2025
Objection resolved — Addressed
11/20/2025
Violation issued (HPD, open)
I
11/13/2025
Objection resolved — Addressed
10/30/2025
Permit issued — Plumbing
B01188212-S1-PL
10/03/2025
Objection resolved — Addressed
10/03/2025
Special inspection requirement — Structural Steel - Welding
XIONGCAI GU
09/16/2025
Objection resolved — Addressed
09/15/2025
Objection raised — Structural
09/15/2025
Objection raised — Scope
09/15/2025
Objection raised — Scope
09/15/2025
Objection raised — Scope
09/02/2025
Filed — Alteration
Renovation of an existing basement with plumbing and partition work. No change in use, occupancy or exit.
B01188212-S2
09/02/2025
Special inspection requirement — Structural Steel - Details
Mohammad Baalbaki
08/25/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mohammad Baalbaki
08/25/2025
Special inspection requirement — Final
Barry Berg
08/13/2025
Permit issued — General Construction
B01188212-I1-GC
07/01/2025
Objection resolved — Addressed
06/09/2025
Violation issued (HPD, open)
A
05/08/2025
Objection resolved — Addressed
04/23/2025
Objection resolved — Addressed
04/09/2025
Objection raised — Cost
04/09/2025
Objection raised — Scope
04/09/2025
Objection raised — Plumbing
03/31/2025
Filed — Alteration
Renovation of an existing basement with plumbing and partition work. No change in use, occupancy or exit.
B01188212-S1
03/30/2025
Objection resolved — Addressed
03/19/2025
Objection raised — Scope
03/11/2025
Filed — Alteration
Renovation of an existing basement with plumbing and partition work. No change in use, occupancy or exit.
B01188212-I1
11/27/2024
Violation issued (HPD, open)
I
04/10/2024
Violation issued (HPD, open)
A
11/21/2023
Violation issued (HPD, open)
I
11/02/2023
Objection raised — Admin
11/02/2023
Objection raised — Scope
11/02/2023
Objection raised — Accessibility
11/02/2023
Objection raised — Inspections
11/02/2023
Objection raised — Structural
11/02/2023
Objection raised — Other
11/02/2023
Objection raised — Energy
11/02/2023
Objection raised — Inspections
11/02/2023
Objection raised — Structural
11/02/2023
Objection raised — Scope
08/22/2023
Filed — Alteration
Existing three-family, two-story and basement dwelling, work includes horizontal enlargement in basement at rear and renovation of existing cellar and basement; NO work for the rest of the building. No change in use, occupancy or exit.
B00915072-I1
08/06/2023
Special inspection requirement — Interior lighting power
08/06/2023
Special inspection requirement — Air barrier - visual inspection
08/06/2023
Special inspection requirement — Lighting controls
08/06/2023
Special inspection requirement — Duct leakage testing, insulation and design
08/06/2023
Special inspection requirement — Masonry
08/06/2023
Special inspection requirement — Fenestration air leakage
08/06/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
08/06/2023
Special inspection requirement — Lighting in dwelling units
08/06/2023
Special inspection requirement — Insulation placement and R values
08/06/2023
Special inspection requirement — Fenestration areas
08/06/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
08/06/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Latest 60 of 83 events.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/30/2023$1.9M—THE DECLARATION OF TRUST OF JUDITH W. GREGG → Private party$604/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GEE2000 ARCHITECT P.C.603/31/2026
B&Z ENGINEERING CONSULTANTS109/02/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
B A INSPECTIONS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NEIL INNOVATIVE CONST.INCGeneral Contractor306/28/2026
CONDE ELECTRIC INCElectrical103/22/2026
H BRONNER & SON PLBG & HTGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GEE2000 ARCHITECT P.C.691203/27/2026
BAALBAKI&ASSOCIATES ENGIN1858109/02/2025
G ENGINEERING PC7778109/02/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedNEIL INNOVATIVE CONST.INC06/10/2026
DOB NOWStructuralPermit IssuedNEIL INNOVATIVE CONST12/29/2025
DOB NOWPlumbingPermit IssuedH BRONNER & SON PLBG & HT10/30/2025
DOB NOWGeneral ConstructionPermit IssuedNEIL INNOVATIVE CONST08/13/2025
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
04/15/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
10/03/2025Structural Steel - WeldingXIONGCAI GUspecial
09/02/2025Structural Steel - DetailsMohammad Baalbakispecial
08/25/2025Structural Stability – Alterations of existing buildingsMohammad Baalbakispecial
08/25/2025FinalBarry Bergprogress
08/06/2023Interior lighting power—energy_progress
08/06/2023Air barrier - visual inspection—energy_progress
08/06/2023Lighting controls—energy_progress
08/06/2023Duct leakage testing, insulation and design—energy_progress
08/06/2023Masonry—special
08/06/2023Fenestration air leakage—energy_progress
08/06/2023Fenestration and door U-factor and product ratings—energy_progress
08/06/2023Lighting in dwelling units—energy_progress
08/06/2023Insulation placement and R values—energy_progress
08/06/2023Fenestration areas—energy_progress
08/06/2023Structural Stability – Alterations of existing buildings—special
08/06/2023Fire-Resistant Penetrations and Joints—special
08/06/2023Energy Code Compliance Inspections—progress
▾Documents — 30 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/27/2026B00915072-S1Request digital key ↗
08/27/2026B00915072-I1Request digital key ↗
08/20/2026B01188212-P3Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026B00915072-I1Open ↗
▸Seals & Professional Certifications12
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/20/2026B01188212-P3Open ↗
08/20/2026B01188212-P2Open ↗
08/20/2026B01188212-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/25/2026B01188212-S2Open ↗
08/25/2026B01188212-S2Open ↗
08/25/2026B01188212-S2Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/25/2026B01188212-S2Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/20/2026B01188212-P3Open ↗
08/20/2026B01188212-P2Open ↗
08/20/2026B01188212-P1Open ↗
Showing 3 of 8 on file for this type
▸Other Documents1
▸DOB NOWSite Survey: Initial1
08/13/2026B00915072-I1Open ↗