← Back
Elevator cooperative
135 HAWTHORNE STREET
BROOKLYN · BIN 3115589
💬 Discuss this project
1939Year Built
6Stories
D4Building Class
R6Zoning
63,576 sfGross Floor Area
60Units
LL97 CoveredRent Stabilized12 Open Violations ▸FDNY Report ↗
Elevator cooperative · Owner of record: 125/135 HAWTHORNE ST OWNERS CORP · 14,705 sf lot · 4.32 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MAXX PROPERTIES507/08/2026
JJS BUILDERS407/08/2026
125 135 HAWTHORNE ST OWNERS1203/22/2026
125 HAWTHORNE ST CORP103/22/2026
135 HAWTHORNE ST OWNERS103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DAVIS ARCHITECTURE STUDIO, PLLC.107/01/2023
HAIDER ENGINEERING, P.E.104/08/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HAIDER ENGINEERING, P.E.103/21/2026
GREEN LIGHT EXPEDITING LLC203/21/2026
HAIDER ENGINEERING P E103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MNK ENTERPRISES LLCGeneral Contractor407/08/2026
CRAFTSMANSHIP CORPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ANS CONSULTANTS, INC.1768107/01/2023
Building Lifecycle
All (72)Filed (2)Permit Issued (3)Signed Off (2)Violation (60)Special Inspection (5)
05/08/2026
Violation issued (HPD, closed)
B
04/22/2026
Violation issued (HPD, closed)
C
03/20/2026
Violation issued (HPD, open)
C
03/20/2026
Violation issued (HPD, open)
C
03/20/2026
Violation issued (HPD, open)
C
08/30/2023
Signed off — Alteration
PERFORM MINOR INTERIOR PARTITION DEMOLITION & CONSTRUCTION INCONJUNCTION WITH APT#6H RENOVATION. MODIFY BEDROOM & BATHROOM ENTRY. INSTALL CLOSETS & LIGHTING. PLUMBING WORK FILED SEPARATELY. NO CHANGE TO USE, EGRESS, OCCUPANCY OR FIRE PROTECTION.
B00894918-I1
07/12/2023
Permit issued — General Construction
B00894918-I1-GC
07/01/2023
Filed — Alteration
PERFORM MINOR INTERIOR PARTITION DEMOLITION & CONSTRUCTION INCONJUNCTION WITH APT#6H RENOVATION. MODIFY BEDROOM & BATHROOM ENTRY. INSTALL CLOSETS & LIGHTING. PLUMBING WORK FILED SEPARATELY. NO CHANGE TO USE, EGRESS, OCCUPANCY OR FIRE PROTECTION.
B00894918-I1
06/26/2023
Special inspection requirement — Tenant Protection Plan Compliance
ATULKUMAR SHAH, PE
06/26/2023
Special inspection requirement — Energy Code Compliance Inspections
JOSHUA DAVIS
06/26/2023
Special inspection requirement — Final
JOSHUA DAVIS
06/26/2023
Special inspection requirement — Fire-Resistance Rated Construction
JOSHUA DAVIS
06/26/2023
Special inspection requirement — Interior lighting power
JOSHUA DAVIS
04/01/2023
Violation issued (HPD, closed)
A
04/01/2023
Violation issued (HPD, closed)
A
04/01/2023
Violation issued (HPD, open)
C
04/01/2023
Violation issued (HPD, open)
C
04/01/2023
Violation issued (HPD, open)
C
04/01/2023
Violation issued (HPD, closed)
C
04/01/2023
Violation issued (HPD, closed)
A
04/01/2023
Violation issued (HPD, closed)
A
04/01/2023
Violation issued (HPD, closed)
C
04/01/2023
Violation issued (HPD, closed)
A
04/01/2023
Violation issued (HPD, closed)
A
04/01/2023
Violation issued (HPD, closed)
A
06/29/2022
Signed off — Alteration
B00152014-I1
08/08/2021
Violation issued (HPD, open)
C
06/25/2020
Violation issued (HPD, open)
C
06/25/2020
Violation issued (HPD, open)
C
05/31/2020
Violation issued (HPD, closed)
A
05/31/2020
Violation issued (HPD, closed)
A
05/31/2020
Violation issued (HPD, closed)
A
05/31/2020
Violation issued (HPD, closed)
A
05/31/2020
Violation issued (HPD, closed)
C
05/31/2020
Violation issued (HPD, closed)
A
05/31/2020
Violation issued (HPD, closed)
C
05/31/2020
Violation issued (HPD, closed)
A
05/31/2020
Violation issued (HPD, closed)
B
05/31/2020
Violation issued (HPD, closed)
A
05/31/2020
Violation issued (HPD, closed)
A
05/31/2020
Violation issued (HPD, closed)
A
05/31/2020
Violation issued (HPD, closed)
A
05/31/2020
Violation issued (HPD, closed)
C
05/31/2020
Violation issued (HPD, closed)
C
05/31/2020
Violation issued (HPD, open)
C
05/31/2020
Violation issued (HPD, open)
C
05/31/2020
Violation issued (HPD, open)
C
05/08/2020
Permit issued — Sidewalk Shed
B00152014-I1-SH
03/31/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/19/2019
Violation issued (HPD, closed)
C
07/02/2019
Violation issued (ECB, closed)
Construction
07/02/2019
Violation issued (ECB, closed)
Construction
07/02/2019
Violation issued (ECB, closed)
Construction
07/02/2019
Violation issued (ECB, closed)
Construction
07/02/2019
Violation issued (ECB, closed)
Construction
04/09/2019
Permit issued — Sidewalk Shed
B00152014-I1-SH
04/08/2019
Filed — Alteration
B00152014-I1
03/20/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/05/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/26/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 72 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offCRAFTSMANSHIP CORP07/12/2023
DOB NOWSidewalk ShedSigned-offMNK ENTERPRISES LLC05/08/2020
DOB NOWSidewalk ShedSigned-offMNK ENTERPRISES LLC04/09/2019
BISOTISSUEDVERTEX RESTORATION CORP07/28/2020
BISOTISSUEDVERTEX RESTORATION CORP04/17/2019
BISOTISSUEDERIC WHITENIGHT07/16/2015
BISOTISSUEDVERTEX RESTORATION CORP09/13/2007
BISFSISSUEDBAYRIDGE FUEL CORP.03/28/2006
BISFSISSUEDA.L. EASTMOND & SONS INC.12/02/2003
BISPLISSUEDJOSEPH FERRIGNO P&H CO10/28/2002
BISFSISSUEDSTAR INDUSTRIAL SVC CO INC10/28/2002
2 projects · most recent 09/06/2023
FiledStatusContractorScope
09/06/2023CompleteR & T ELECTRICAL CORP—
04/08/2019Permit IssuedRICHARD NEU—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
06/26/2023Tenant Protection Plan ComplianceATULKUMAR SHAH, PEspecial
06/26/2023Energy Code Compliance InspectionsJOSHUA DAVISprogress
06/26/2023FinalJOSHUA DAVISprogress
06/26/2023Fire-Resistance Rated ConstructionJOSHUA DAVISprogress
06/26/2023Interior lighting powerJOSHUA DAVISenergy_progress
▾Documents — 75 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00152014-I1Request digital key ↗
▸DOB NOWPlans/Sketch1
08/27/2026B00894918-I1Request digital key ↗
▸Applications & Permits10
▸BISWORK PERMIT APPLICATION6
07/28/2020340749051Open ↗
07/02/2019340672196Open ↗
04/17/2019340672196Open ↗
Showing 3 of 6 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION4
07/23/2020340749051Open ↗
04/15/2019340672196Open ↗
03/26/2015321095523Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications18
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
12/08/2015321095523Open ↗
12/08/2015321095523Open ↗
07/17/2013320706544Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
07/23/2020340749051Open ↗
04/15/2019340672196Open ↗
08/24/2007310010528Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
07/23/2020340749051Open ↗
04/15/2019340672196Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
07/23/2020340749051Open ↗
04/15/2019340672196Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
09/02/2026B00152014-I1Open ↗
08/13/2026B00894918-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/23/2026B00894918-I1Open ↗
08/23/2026B00894918-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
08/24/2007310010528Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
08/24/2007310010528Open ↗
▸BISPC FULL REPORT1
08/24/2007310010528Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026B00894918-I1Open ↗
▸Safety & Tenant Protection2
▸BISTENANT PROTECTION PLAN AND NOTES2
07/23/2020340749051Open ↗
04/15/2019340672196Open ↗
▸Environmental & Asbestos6
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
07/23/2020340749051Open ↗
04/15/2019340672196Open ↗
03/26/2015321095523Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
08/24/2007310010528Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B00894918-I1Open ↗
▸Energy Compliance13
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
08/24/2021340672196Open ↗
03/09/2021340749051Open ↗
07/23/2020340749051Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
08/24/2021340672196Open ↗
03/09/2021340749051Open ↗
12/08/2015321095523Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
03/26/2015321095523Open ↗
07/17/2013320706544Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
07/23/2020340749051Open ↗
04/15/2019340672196Open ↗
▸BISNYCECC ANALYSIS2
07/23/2020340749051Open ↗
04/15/2019340672196Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY4
08/24/2021340672196Open ↗
03/09/2021340749051Open ↗
07/23/2020340749051Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs6
▸BISADMINISTRATIVE OBJECTIONS3
03/26/2015321095523Open ↗
07/17/2013320706544Open ↗
08/24/2007310010528Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
08/24/2021340672196Open ↗
03/09/2021340749051Open ↗
12/08/2015321095523Open ↗
▸Cost, Insurance & Ownership9
▸BISCOST AFFIDAVIT9
08/24/2021340672196Open ↗
03/09/2021340749051Open ↗
07/23/2020340749051Open ↗
Showing 3 of 9 on file for this type
▸Filing & Intake Forms4
▸BISEFILING JOB APPLICATION COVER SHEET2
07/23/2020340749051Open ↗
04/15/2019340672196Open ↗
▸BISEFILING COVER SHEET2
03/26/2015321095523Open ↗
07/17/2013320706544Open ↗
▸Other Documents1
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
08/13/2026B00152014-I1Open ↗