Primarily 2 family with 1 store or office
645 ROGERS AVENUE
BROOKLYN · BIN 3116049
💬 Discuss this project
1899Year Built
3Stories
S2Building Class
R6Zoning
3,000 sfGross Floor Area
3Units
Rent Stabilized51 Open Violations ▸FDNY Report ↗
Primarily 2 family with 1 store or office · 1,272 sf lot · 2.36 FAR built · Flood zone X
Locations of Work
ArchitectureFire ProtectionCivilGeneral
Floor 314p · 1 filing · 20 docs
Floor 214p · 1 filing · 20 docs
Floor 117p · 2 filings · 20 docs
Cellar14p · 1 filing · 20 docs
1 job · most recent 05/03/2024
Sprinkler System
FiledStatusContractorScope
05/03/2024Signed-offRRP PLUMBING CORPSprinkler System
1 job · most recent 05/03/2024
Gas Water/Sanitary
FiledStatusContractorScope
05/03/2024Signed-offAMERICAN STANDARD P&H CORGas, Water/Sanitary
2 jobs · most recent 01/24/2025
General Wiring
FiledStatusContractorScope
01/24/2025CompleteERIC & NG ELEC'L, INC.General Wiring
12/05/2024CompleteGOODALL ELECTRIC CORPGeneral Wiring
Building Lifecycle
All (180)Filed (7)Permit Issued (6)Signed Off (3)Violation (60)Inspection (10)Objection (64)Special Inspection (30)
10/01/2025
Signed off — Alteration
INTERIOR RENOVATION 1ST FLOOR OF EXISTING 3 STORY BUILDING. CONSTRUCTION WORK AS PER PLAN. INSTALL NEW PARTITION. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01225718-I1
08/21/2025
Permit issued — General Construction
B01225718-I1-GC
07/23/2025
Objection resolved — Addressed
07/23/2025
Objection resolved — Addressed
07/23/2025
Objection resolved — Addressed
07/23/2025
Objection resolved — Addressed
07/16/2025
Objection raised — Fire_Protection
07/16/2025
Objection raised — Scope
07/16/2025
Objection raised — Scope
07/03/2025
Objection resolved — Addressed
06/16/2025
Objection raised — Admin
06/16/2025
Objection raised — Admin
06/10/2025
Violation issued (HPD, closed)
A
06/05/2025
Filed — Alteration
INTERIOR RENOVATION 1ST FLOOR OF EXISTING 3 STORY BUILDING. CONSTRUCTION WORK AS PER PLAN. INSTALL NEW PARTITION. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01225718-I1
05/14/2025
Special inspection requirement — Final
Eric Sun
05/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
05/14/2025
Special inspection requirement — Fire-Resistance Rated Construction
Eric Sun
05/14/2025
Special inspection requirement — Tenant Protection Plan Compliance
Eric Sun
04/18/2025
Violation issued (ECB, closed)
Construction
11/29/2024
Violation issued (HPD, closed)
I
08/20/2024
Signed off — Alteration CO
TO CONVERT FIRST FLOOR RESIDENTIAL AREA(ONE FAMILY) TO COMMERCIAL AREA(BUSINESS) WITH MINOR CONSTRUCTION WORK AS PER PLAN. OBTAINING NEW CERTIFICATE OF OCCUPANCY.
B00597495-S1
07/16/2024
Signed off — Alteration CO
TO CONVERT FIRST FLOOR RESIDENTIAL AREA(ONE FAMILY) TO COMMERCIAL AREA(BUSINESS) WITH MINOR CONSTRUCTION WORK AS PER PLAN. OBTAINING NEW CERTIFICATE OF OCCUPANCY.
B00597495-S2
07/10/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
07/10/2024
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
07/10/2024
Special inspection requirement — Fire-Resistance Rated Construction
CHRISTIAN LOZADA
07/10/2024
Special inspection requirement — Fenestration air leakage
CHRISTIAN LOZADA
07/10/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
CHRISTIAN LOZADA
07/10/2024
Special inspection requirement — Fenestration areas
CHRISTIAN LOZADA
07/10/2024
Special inspection requirement — Metering
CHRISTIAN LOZADA
07/10/2024
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
07/10/2024
Special inspection requirement — Lighting controls
CHRISTIAN LOZADA
07/10/2024
Special inspection requirement — Interior lighting power
CHRISTIAN LOZADA
07/10/2024
Special inspection requirement — Air barrier - visual inspection
CHRISTIAN LOZADA
07/02/2024
Objection resolved — Addressed
05/09/2024
Objection raised — Scope
05/03/2024
Filed — Alteration CO
TO CONVERT FIRST FLOOR RESIDENTIAL AREA(ONE FAMILY) TO COMMERCIAL AREA(BUSINESS) WITH MINOR CONSTRUCTION WORK AS PER PLAN. OBTAINING NEW CERTIFICATE OF OCCUPANCY.
B00597495-P3
04/15/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/11/2024
Violation issued (HPD, closed)
A
11/29/2023
Violation issued (HPD, open)
C
11/29/2023
Violation issued (HPD, closed)
C
11/29/2023
Violation issued (HPD, open)
C
11/29/2023
Violation issued (HPD, open)
C
11/29/2023
Violation issued (HPD, open)
C
11/29/2023
Violation issued (HPD, open)
C
11/29/2023
Violation issued (HPD, open)
B
11/29/2023
Violation issued (HPD, open)
C
11/29/2023
Violation issued (HPD, open)
A
11/16/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
10/31/2023
Permit issued — Boiler Equipment
B00597495-S2-BE
10/26/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/17/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/13/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/25/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/19/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/27/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/27/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/27/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/24/2023
Violation issued (HPD, open)
B
06/24/2023
Violation issued (HPD, closed)
C
06/24/2023
Violation issued (HPD, open)
C
Latest 60 of 180 events.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/29/2021$1.2M—Private party → Private party$406/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NIC 88 CORP106/05/2025
CL ENGINEERING P.C.305/03/2024
HUAN DESIGN INC.306/23/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONSTRUCTION603/21/2026
BASIC GROUPS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AMERICAN STANDARD P&H CORORP.Plumbing207/08/2026
GOODALL ELECTRIC CORPElectrical103/22/2026
AMERICAN STANDARD PLUMBING &Fire Protection107/08/2026
RRP PLUMBING CORPFire Protection107/08/2026
CUBE BUILDERS GROUP NYGeneral Contractor107/08/2026
LT PRO CONSTRUCTION INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NIC DESIGN INC9758106/05/2025
CL ENGINEERING P.C.6781505/03/2024
NKM ENGINEERING PLLC6244106/23/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offCUBE BUILDERS GROUP NY08/21/2025
DOB NOWBoiler EquipmentSigned-offAMERICAN STANDARD P&H CORORP.10/31/2023
DOB NOWSprinklersSigned-offRALPH W. LANDOLFI JR.06/21/2023
DOB NOWGeneral ConstructionPermit IssuedLT PRO CONSTRUCTION INC10/31/2022
DOB NOWSprinklersSigned-offAMERICAN STANDARD PLUMBIN10/28/2022
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.10/28/2022
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
04/15/2024Pass-Final CND-Occupancy InspectionPassView ↗
11/16/2023Pass-Final Boiler Equipment InspectionPassView ↗
10/26/2023Pass-Final CND-Occupancy InspectionPassView ↗
10/17/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/13/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/25/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/19/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/27/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/27/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/27/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
05/14/2025FinalEric Sunprogress
05/14/2025Fire-Resistant Penetrations and JointsEric Sunspecial
05/14/2025Fire-Resistance Rated ConstructionEric Sunprogress
05/14/2025Tenant Protection Plan ComplianceEric Sunspecial
07/10/2024Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
07/10/2024Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
07/10/2024Fire-Resistance Rated ConstructionCHRISTIAN LOZADAprogress
07/10/2024Fenestration air leakageCHRISTIAN LOZADAenergy_progress
07/10/2024Fenestration and door U-factor and product ratingsCHRISTIAN LOZADAenergy_progress
07/10/2024Fenestration areasCHRISTIAN LOZADAenergy_progress
07/10/2024MeteringCHRISTIAN LOZADAenergy_progress
07/10/2024Maintenance informationCHRISTIAN LOZADAenergy_progress
07/10/2024Lighting controlsCHRISTIAN LOZADAenergy_progress
07/10/2024Interior lighting powerCHRISTIAN LOZADAenergy_progress
07/10/2024Air barrier - visual inspectionCHRISTIAN LOZADAenergy_progress
06/21/2023Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
06/21/2023Tenant Protection Plan ComplianceNARESH MAHANGUspecial
06/21/2023Heating SystemsNARESH MAHANGUspecial
11/10/2022Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
11/10/2022HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
11/10/2022Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
11/10/2022Sprinkler SystemsCHRISTIAN LOZADAspecial
07/25/2022Maintenance informationCHRISTIAN LOZADAenergy_progress
07/25/2022Air barrier - visual inspectionCHRISTIAN LOZADAenergy_progress
07/25/2022Fenestration and door U-factor and product ratingsCHRISTIAN LOZADAenergy_progress
Latest 25 of 33.
▾Documents — 52 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/27/2026B00597495-S2Request digital key ↗
08/27/2026B00597495-P2Request digital key ↗
08/27/2026B00597495-S1Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026B00597495-P1Open ↗
08/13/2026B00597495-I1Open ↗
08/13/2026B00597495-P3Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00597495-I1Open ↗
▸Seals & Professional Certifications21
▸DOB NOWProgress Inspector Seal & Signature8
08/28/2026B00597495-P1Open ↗
08/28/2026B00597495-P1Open ↗
08/27/2026B00597495-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/21/2026B01225718-I1Open ↗
08/13/2026B00597495-S1Open ↗
08/13/2026B00597495-P3Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/23/2026B00597495-S2Open ↗
08/28/2026B00597495-P1Open ↗
08/27/2026B00597495-I1Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/13/2026B00597495-P3Open ↗
08/13/2026B00597495-I1Open ↗
08/13/2026B00597495-P1Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/21/2026B01225718-I1Open ↗
08/13/2026B00597495-P1Open ↗
08/13/2026B00597495-P3Open ↗
Showing 3 of 7 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00597495-I1Open ↗
▸Other Documents9
▸DOB NOWProperty Ownership Certification5
08/13/2026B00597495-P1Open ↗
08/13/2026B00597495-P2Open ↗
08/13/2026B00597495-P3Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWInitial Survey3
08/13/2026B00597495-P1Open ↗
08/13/2026B00597495-P3Open ↗
08/13/2026B00597495-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00597495-I1Open ↗