← Back
Two family frame
50 RUGBY ROAD
BROOKLYN · BIN 3116420
💬 Discuss this project
1899Year Built
2.75Stories
B2Building Class
R3XZoning
2,460 sfGross Floor Area
2Units
Two family frame · 5,000 sf lot · 0.49 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalGeneral
Roof3p · 2 filings · 20 docs
Floor 38p · 3 filings · 20 docs
Floor 28p · 2 filings · 20 docs
Floor 18p · 3 filings · 20 docs
Cellar5p · 2 filings · 20 docs
Basement3p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/13/2021$2.0M—50 RUGBY ROAD LLC → Private party$813/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JULIE MEE SCHMIDT ARCHITECTURE PLLC402/09/2024
CUONO ENGINEERING PLLC301/30/2023
NEW AGE ENGINEERING PLLC102/23/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AZAR ASSOCIATES703/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AROUND THE CLOCK CNSN GRPGeneral Contractor707/08/2026
AMC PLBG, HTG & CLNG, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CHANG PARK ARCH. P.C.663702/09/2024
NEW AGE ENGINEERING PLLC7746102/23/2022
Building Lifecycle
All (71)Filed (8)Permit Issued (4)Signed Off (3)Inspection (4)Objection (26)Special Inspection (26)
06/17/2024
Signed off — Alteration
MINOR NON-STRUCTURAL PARTITION REMOVL, NEW FINISH FLOORING, NEW PARTITIONS, DROPED CEILINGS, FINISHES AND CABINETS, NO CHANGE TO OCCUPANCY USE OR EGRESS
B00650572-I1
03/14/2024
Objection resolved — Addressed
03/06/2024
Objection resolved — Addressed
02/16/2024
Objection raised — Scope
02/16/2024
Objection raised — Scope
02/09/2024
Filed — Alteration
MINOR NON-STRUCTURAL PARTITION REMOVL, NEW FINISH FLOORING, NEW PARTITIONS, DROPED CEILINGS, FINISHES AND CABINETS, NO CHANGE TO OCCUPANCY USE OR EGRESS
B00650572-P2
02/09/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Chang Park
02/09/2024
Special inspection requirement — Final
Chang Park
02/09/2024
Special inspection requirement — Lighting in dwelling units
Chang Park
02/09/2024
Special inspection requirement — Interior lighting power
Chang Park
02/09/2024
Special inspection requirement — Lighting controls
Chang Park
12/28/2023
Signed off — Alteration
PLUMBING MODIFCIATIONS PER PLANS NO CHANGE TO OCCUPANCY USE OR EGRESS
B00650577-I1
11/29/2023
Objection resolved — Addressed
08/30/2023
Objection raised — Zoning
08/25/2023
Filed — Alteration
MINOR NON-STRUCTURAL PARTITION REMOVL, NEW FINISH FLOORING, NEW PARTITIONS, DROPED CEILINGS, FINISHES AND CABINETS, NO CHANGE TO OCCUPANCY USE OR EGRESS
B00650572-P1
02/03/2023
Signed off — Alteration
INTERIOR RENOVATION OF EXISTING HOUSE INCLUDING:REMOVAL OF LOAD BEARING WALLS ON FIRST AND THIRD FLOORS; INSTALLATION OF NEW HEADERS & POSTS AT THE PROPOSED WALL DEMOLITION AND ENLARGED OPENING NO CHANGE IN OCCUPANCY USE OR EGRESS
B00652934-I1
01/31/2023
Special inspection requirement — Structural Steel - High Strength Bolting
Chang Park
01/31/2023
Special inspection requirement — Structural Steel - Welding
Chang Park
01/31/2023
Special inspection requirement — Structural Cold-Formed Steel
Chang Park
01/31/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Chang Park
01/31/2023
Special inspection requirement — Structural Steel - Details
Chang Park
01/31/2023
Special inspection requirement — Structural Wood Frame
Chang Park
01/31/2023
Special inspection requirement — Final
CIRO CUONO
01/30/2023
Filed — Alteration
INTERIOR RENOVATION OF EXISTING HOUSE INCLUDING:REMOVAL OF LOAD BEARING WALLS ON FIRST AND THIRD FLOORS; INSTALLATION OF NEW HEADERS & POSTS AT THE PROPOSED WALL DEMOLITION AND ENLARGED OPENING NO CHANGE IN OCCUPANCY USE OR EGRESS
B00652934-P2
01/26/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Chang Park
01/26/2023
Special inspection requirement — Structural Steel - Details
Chang Park
01/26/2023
Special inspection requirement — Structural Steel - High Strength Bolting
Chang Park
01/26/2023
Special inspection requirement — Structural Steel - Welding
Chang Park
01/26/2023
Special inspection requirement — Final
CIRO CUONO
01/26/2023
Special inspection requirement — Structural Wood Frame
Chang Park
01/26/2023
Special inspection requirement — Structural Cold-Formed Steel
Chang Park
11/14/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/14/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/26/2022
Filed — Alteration
INTERIOR RENOVATION OF EXISTING HOUSE INCLUDING:REMOVAL OF LOAD BEARING WALLS ON FIRST AND THIRD FLOORS; INSTALLATION OF NEW HEADERS & POSTS AT THE PROPOSED WALL DEMOLITION AND ENLARGED OPENING NO CHANGE IN OCCUPANCY USE OR EGRESS
B00652934-P1
10/04/2022
Permit issued — Structural
B00652934-I1-ST
05/06/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/06/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/22/2022
Permit issued — Plumbing
B00650577-I1-PL
03/21/2022
Objection resolved — Addressed
03/21/2022
Objection resolved — Addressed
03/21/2022
Objection resolved — Addressed
02/28/2022
Objection raised — Admin
02/28/2022
Objection raised — Admin
02/28/2022
Objection raised — Admin
02/26/2022
Permit issued — Mechanical Systems
B00662439-I1-MS
02/23/2022
Filed — Alteration
INTERIOR RENOVATION OF EXISTING HOUSE INCLUDING:REMOVAL OF LOAD BEARING WALLS ON FIRST AND THIRD FLOORS; INSTALLATION OF NEW HEADERS & POSTS AT THE PROPOSED WALL DEMOLITION AND ENLARGED OPENING NO CHANGE IN OCCUPANCY USE OR EGRESS
B00652934-I1
02/23/2022
Filed — Alteration
INSTALL NEW HVAC SPLIT SYSTEM AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
B00662439-I1
02/23/2022
Special inspection requirement — HVAC-R and service water heating equipment
Stephen Shishko
02/23/2022
Special inspection requirement — HVAC-R and service water heating system controls
Stephen Shishko
02/23/2022
Special inspection requirement — Maintenance information
Stephen Shishko
01/13/2022
Special inspection requirement — Final
Stephen Shishko
01/13/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stephen Shishko
01/13/2022
Special inspection requirement — Mechanical Systems
Stephen Shishko
01/12/2022
Permit issued — General Construction
B00650572-I1-GC
01/07/2022
Objection resolved — Addressed
01/07/2022
Objection resolved — Addressed
01/07/2022
Objection resolved — Addressed
01/07/2022
Objection resolved — Addressed
01/07/2022
Objection resolved — Addressed
01/07/2022
Objection resolved — Addressed
Latest 60 of 71 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offAROUND THE CLOCK CNSN GRP10/04/2022
DOB NOWPlumbingSigned-offAMC PLBG, HTG & CLNG, INC04/22/2022
DOB NOWMechanical SystemsPermit IssuedAROUND THE CLOCK CNSN GRP02/26/2022
DOB NOWGeneral ConstructionSigned-offAROUND THE CLOCK CNSN GRP01/12/2022
1 project · most recent 02/23/2022
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
02/23/2022Permit IssuedAROUND THE CLOCK CNSN GRPAir Conditioning Systems, Heating Systems
Cooling
Mitsubishi Electric MSZ-GL12NA-U1 12,000 BTU · Ahu ×4
MSZ-GL18NA-U1 18,000 BTU · Ahu ×4
MXZ-4C36NA2-U1 35,400 BTU · Condensing Unit ×3
MSZ-GL06NA-U1 6,000 BTU · Ahu ×2
MXZ-2C20NA2-U1 18,000 BTU · Condensing Unit ×2
MUZ-GL24NA-U2 22,400 BTU · Condensing Unit ×1
Heating
Mitsubishi Electric MSZ-GL12NA-U1 14,400 BTU · Ahu ×4
MSZ-GL18NA-U1 21,600 BTU · Ahu ×4
MXZ-4C36NA2-U1 36,000 BTU · Condensing Unit ×3
MSZ-GL06NA-U1 7,200 BTU · Ahu ×2
MUZ-GL24NA-U2 27,600 BTU · Condensing Unit ×1
MXZ-2C20NA2-U4 22,000 BTU · Condensing Unit ×1
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
11/14/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/14/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/06/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/06/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
02/09/2024Fire-Resistant Penetrations and JointsChang Parkspecial
02/09/2024FinalChang Parkprogress
02/09/2024Lighting in dwelling unitsChang Parkenergy_progress
02/09/2024Interior lighting powerChang Parkenergy_progress
02/09/2024Lighting controlsChang Parkenergy_progress
01/31/2023Structural Steel - High Strength BoltingChang Parkspecial
01/31/2023Structural Steel - WeldingChang Parkspecial
01/31/2023Structural Cold-Formed SteelChang Parkspecial
01/31/2023Structural Stability – Alterations of existing buildingsChang Parkspecial
01/31/2023Structural Steel - DetailsChang Parkspecial
01/31/2023Structural Wood FrameChang Parkprogress
01/31/2023FinalCIRO CUONOprogress
01/26/2023Structural Stability – Alterations of existing buildingsChang Parkspecial
01/26/2023Structural Steel - DetailsChang Parkspecial
01/26/2023Structural Steel - High Strength BoltingChang Parkspecial
01/26/2023Structural Steel - WeldingChang Parkspecial
01/26/2023FinalCIRO CUONOprogress
01/26/2023Structural Wood FrameChang Parkprogress
01/26/2023Structural Cold-Formed SteelChang Parkspecial
02/23/2022HVAC-R and service water heating equipmentStephen Shishkoenergy_progress
02/23/2022HVAC-R and service water heating system controlsStephen Shishkoenergy_progress
02/23/2022Maintenance informationStephen Shishkoenergy_progress
01/13/2022FinalStephen Shishkoprogress
01/13/2022Fire-Resistant Penetrations and JointsStephen Shishkospecial
01/13/2022Mechanical SystemsStephen Shishkospecial
Latest 25 of 26.
▾Documents — 47 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/31/2026B00650577-I1Request digital key ↗
08/31/2026B00652934-P1Request digital key ↗
08/31/2026B00652934-P2Request digital key ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications34
▸DOB NOWSpecial Inspector Seal & Signature14
09/01/2026B00650577-I1Open ↗
08/31/2026B00650572-P2Open ↗
08/30/2026B00652934-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
08/31/2026B00650572-P2Open ↗
08/31/2026B00650572-P2Open ↗
08/31/2026B00650572-P2Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/31/2026B00650572-I1Open ↗
08/31/2026B00650572-P1Open ↗
08/31/2026B00650572-P2Open ↗
Showing 3 of 8 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/31/2026B00650577-I1Open ↗
08/31/2026B00662439-I1Open ↗
08/15/2026B00652934-I1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00650572-I1Open ↗