← Back
One story retail building
846 FLATBUSH AVENUE
BROOKLYN · BIN 3116576
💬 Discuss this project
1914Year Built
1Stories
K1Building Class
R7AZoning
4,960 sfGross Floor Area
4Units
0 Open ViolationsFDNY Report ↗
One story retail building · Owner of record: 846 FLATBUSH AVE RLTY CP · 6,380 sf lot · 0.78 FAR built · Flood zone X
Locations of Work
MechanicalPlumbingFire Protection
Roof3p · 1 filing · 16 docs
Floor 83p · 1 filing · 16 docs
Floor 72p · 1 filing · 16 docs
Floor 6
Floor 5
Floor 4
Floor 3
Floor 21p · 1 filing · 16 docs
Floor 13p · 1 filing · 16 docs
Cellar3p · 1 filing · 16 docs
1 job · most recent 11/05/2025
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
11/05/2025——Air Conditioning Systems, Heating Systems
Cooling
Daikin 4MXS36WMVJU9 36,000 BTU · Heat Pump Outdoor ×16
RXTQ36TBVJUB 34,200 BTU · Vrf Outdoor ×14
RZQ18TBVJU 18,000 BTU · Heat Pump Outdoor ×9
2MXS18WMVJU9 17,500 BTU · Heat Pump Outdoor ×4
RXSQ24TBVJUB 23,000 BTU · Heat Pump Outdoor ×3
RXTQ48TBVJUB 45,500 BTU · Vrf Outdoor ×3
RZQ30TBVJU 18,000 BTU · Heat Pump Outdoor ×1
Heating
Daikin 4MXS36WMVJU9 36,000 BTU · Heat Pump Outdoor ×16
RXTQ36TBVJUB 37,000 BTU · Vrf Outdoor ×14
RZQ18TBVJU 20,000 BTU · Heat Pump Outdoor ×9
2MXS18WMVJU9 18,500 BTU · Heat Pump Outdoor ×4
RXSQ24TBVJUB 25,800 BTU · Heat Pump Outdoor ×3
RXTQ48TBVJUB 49,500 BTU · Vrf Outdoor ×3
RZQ30TBVJU 34,800 BTU · Heat Pump Outdoor ×1
1 job · most recent 11/05/2025
Storm Water/Sanitary
FiledStatusContractorScope
11/05/2025——Storm, Water/Sanitary
1 job · most recent 12/16/2025
General Wiring
FiledStatusContractorScope
12/16/2025Permit IssuedS&R ELECTRICAL & MECHANICGeneral Wiring
1 job · most recent 11/05/2025
FiledStatusContractorScope
11/05/2025———
Building Lifecycle
All (43)Filed (4)Violation (10)Objection (10)Special Inspection (19)
02/16/2026
Objection resolved — Addressed
01/23/2026
Objection resolved — Addressed
01/20/2026
Objection resolved — Addressed
12/25/2025
Objection raised — Other
12/17/2025
Objection resolved — Addressed
12/05/2025
Objection raised — Energy
11/05/2025
Filed — New Building
PL APPLICATION HEREBY FILED IN CONJUCTION TO JOB NUMBER B01201815
B01201815-S4
11/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
11/04/2025
Special inspection requirement — HVAC-R and service water heating equipment
11/04/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
11/04/2025
Special inspection requirement — HVAC-R and service water heating system controls
11/04/2025
Special inspection requirement — Maintenance information
10/20/2025
Objection resolved — Addressed
10/08/2025
Objection raised — Other
09/26/2025
Objection raised — Other
09/10/2025
Filed — New Building
PL APPLICATION HEREBY FILED IN CONJUCTION TO JOB NUMBER B01201815
B01201815-S2
09/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/05/2025
Special inspection requirement — Post-installed Anchors
09/05/2025
Special inspection requirement — Mechanical Systems
09/05/2025
Special inspection requirement — Energy Code Compliance Inspections
09/05/2025
Special inspection requirement — Final
09/05/2025
Special inspection requirement — HVAC-R and service water heating equipment
09/05/2025
Special inspection requirement — HVAC-R and service water heating system controls
09/05/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
09/05/2025
Special inspection requirement — Shutoff dampers
09/05/2025
Special inspection requirement — Duct leakage testing, insulation and design
09/05/2025
Special inspection requirement — Maintenance information
09/03/2025
Filed — New Building
PL APPLICATION HEREBY FILED IN CONJUCTION TO JOB NUMBER B01201815
B01201815-S1
09/03/2025
Special inspection requirement — Sprinkler Systems
09/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/03/2025
Special inspection requirement — Post-installed Anchors
05/19/2025
Objection raised — Other
04/22/2025
Filed — New Building
PL APPLICATION HEREBY FILED IN CONJUCTION TO JOB NUMBER B01201815
B01201815-I1
06/08/2010
Violation issued (FDNY_NOV, closed)
11/03/1993
Violation issued (ECB, closed)
Construction
03/11/1993
Violation issued (ECB, closed)
Construction
03/11/1993
Violation issued (ECB, closed)
Construction
11/07/1990
Violation issued (ECB, closed)
Construction
11/07/1990
Violation issued (DOB, closed)
VW*-VIOLATION - WORK W/O PERMIT DISMISSED
11/07/1990
Violation issued (ECB, closed)
Construction
03/31/1990
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/22/1989
Violation issued (ECB, closed)
Construction
09/13/1988
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
FOREST BAY CONST CORP203/22/2026
OWNER OF 846 FLATBUSH103/22/2026
TO THE OWNER OF THE PREMI203/22/2026
RASKINRISERS803/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
VASILIOS ARTEMIOU PE311/05/2025
BAOBAB ARCHITECTS P.C.104/22/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ELLIPSES DESIGN403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
S&R ELECTRICAL & MECHANICElectrical103/22/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISPLISSUEDTHE PLUMBING COMPANY, INC.05/03/2006
BISOTISSUEDNEW EMPIRE CONST INC04/07/2006
BISEQISSUEDNEW EMPIRE CONST INC04/07/2006
BISEQISSUEDNEW EMPIRE CONST INC03/31/2006
BISOTISSUEDNEW EMPIRE CONST INC03/31/2006
BISPLISSUEDGRAFES ENDE INC DBA ADCO PLBG06/22/2001
BIS—ISSUEDBOWING BUILDERS CORP06/15/2000
BIS—ISSUEDBOWING BUILDERS CORP12/10/1999
BISPLISSUEDH & J PLUMBING CORP.10/12/1993
BIS—ISSUEDFOREST BAY CONSTRUCTION CORP01/26/1993
BISEQRE-ISSUEDYORK SCAFFOLDING INC01/14/1993
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
11/04/2025Fire-Resistant Penetrations and Joints—special
11/04/2025HVAC-R and service water heating equipment—energy_progress
11/04/2025HVAC-R and service water piping design and insulation—energy_progress
11/04/2025HVAC-R and service water heating system controls—energy_progress
11/04/2025Maintenance information—energy_progress
09/05/2025Fire-Resistant Penetrations and Joints—special
09/05/2025Post-installed Anchors—special
09/05/2025Mechanical Systems—special
09/05/2025Energy Code Compliance Inspections—progress
09/05/2025Final—progress
09/05/2025HVAC-R and service water heating equipment—energy_progress
09/05/2025HVAC-R and service water heating system controls—energy_progress
09/05/2025HVAC-R and service water piping design and insulation—energy_progress
09/05/2025Shutoff dampers—energy_progress
09/05/2025Duct leakage testing, insulation and design—energy_progress
09/05/2025Maintenance information—energy_progress
09/03/2025Sprinkler Systems—special
09/03/2025Fire-Resistant Penetrations and Joints—special
09/03/2025Post-installed Anchors—special
▾Documents — 16 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/15/2026B01201815-S1Request digital key ↗
08/15/2026B01201815-S4Request digital key ↗
08/14/2026B01201815-S2Request digital key ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026B01201815-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B01201815-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026B01201815-I1Open ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/21/2026B01201815-S4Open ↗
08/21/2026B01201815-S2Open ↗
08/21/2026B01201815-I1Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026B01201815-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/14/2026B01201815-I1Open ↗
▸Other Documents3
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B01201815-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/14/2026B01201815-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026B01201815-I1Open ↗