| Firm | Filings | Most Recent |
|---|---|---|
| A&D ENGINEERING, PLLC | 2 | 05/08/2023 |
| ARC ARCHITECTURE + DESIGN STUDIO | 3 | 11/17/2022 |
| R & O ENGINEERING | 3 | 11/15/2022 |
| Representative | Filings | Most Recent |
|---|---|---|
| ARC ARCHITECTURE + DESIGN STUDIO | 5 | 03/21/2026 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 05/08/2023 | — | — | Air Conditioning Systems, Heating and Air Conditioning Systems, Ventilation Systems | Ventilation Renewaire ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/08/2023 | — | — | Sprinkler System |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/08/2023 | — | — | Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/08/2023 | — | — | Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/08/2023 | — | — | Fence |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 11/03/2023 | Subsurface Investigations (Borings/Test Pits) | — | special |
| 05/10/2023 | Exterior Insulation and Finish Systems (EIFS) | — | special |
| 05/10/2023 | Wall Panels, Curtain Walls, and Veneers | — | special |
| 05/10/2023 | Fire-Resistant Penetrations and Joints | — | special |
| 12/29/2022 | Shutoff dampers | — | energy_progress |
| 12/29/2022 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 12/29/2022 | Energy Code Compliance Inspections | — | progress |
| 12/29/2022 | Maintenance information | — | energy_progress |
| 12/29/2022 | HVAC-R and service water heating system controls | — | energy_progress |
| 12/29/2022 | HVAC-R and service water heating equipment | — | energy_progress |
| 12/28/2022 | Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation | — | special |
| 12/28/2022 | HVAC-R and service water heating equipment | — | energy_progress |
| 12/28/2022 | HVAC-R and service water heating system controls | — | energy_progress |
| 12/28/2022 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 12/28/2022 | Energy Code Compliance Inspections | — | progress |
| 12/28/2022 | Maintenance information | — | energy_progress |
| 12/27/2022 | Final | — | progress |
| 12/27/2022 | Mechanical Systems | — | special |
| 12/01/2022 | Sprinkler Systems | — | special |
| 11/14/2022 | Subsurface Conditions – Fill Placement & In-Place Density | — | special |
| 11/14/2022 | Excavations - Sheeting, Shoring, and Bracing | — | special |
| 11/14/2022 | Structural Stability – Alterations of existing buildings | — | special |
| 11/14/2022 | Structural Steel - Details | — | special |
| 11/14/2022 | Subgrade Inspections | — | special |
| 11/14/2022 | Concrete - Cast-In-Place | — | special |