← Back
Miscellaneous one family
2158 BEVERLEY ROAD
BROOKLYN · BIN 3118869
💬 Discuss this project
1930Year Built
2.5Stories
A9Building Class
R6BZoning
1,900 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Miscellaneous one family · Owner of record: CASCADE FUNDING MORTGAGE TRUST HB13 · 1,650 sf lot · 1.15 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/04/2025$552K—CASCADE FUNDING MORTGAGE TRUST HB13 → HOMEFITS LLC$291/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ASR ENGINEERING PC506/17/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ACE GROUP NY CORPGeneral Contractor204/09/2026
ALL PRO PLBG & HTG INCPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ASR ENGINEERING PC8404306/17/2026
Building Lifecycle
All (58)Filed (5)Permit Issued (3)Signed Off (3)Violation (1)Inspection (3)Objection (13)Special Inspection (30)
07/29/2026
Signed off — Alteration
PLUMBING APPLICATION FOR INTERIOR RENOVATION OF AN EXISTING (1) ONE FAMILY DWELLING. FILED IN CONJUNCTION WITH ALTERATION APPLICATION # B01317375-I1. CAP AND REMOVE GAS BOILER, HWH, REPLACE AND INSTALL NEW PLUMBING FIXTURES AS PER PLANS.
B01317375-S1
07/07/2026
Signed off — Alteration
PLUMBING APPLICATION FOR INTERIOR RENOVATION OF AN EXISTING (1) ONE FAMILY DWELLING. FILED IN CONJUNCTION WITH ALTERATION APPLICATION # B01317375-I1. CAP AND REMOVE GAS BOILER, HWH, REPLACE AND INSTALL NEW PLUMBING FIXTURES AS PER PLANS.
B01317375-I1
06/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
AKM RAHMAN
06/22/2026
Special inspection requirement — HVAC-R and service water heating equipment
AKM RAHMAN
06/22/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
AKM RAHMAN
06/22/2026
Special inspection requirement — HVAC-R and service water heating system controls
AKM RAHMAN
06/22/2026
Special inspection requirement — Maintenance information
AKM RAHMAN
06/22/2026
Special inspection requirement — Energy Code Compliance Inspections
AKM RAHMAN
06/17/2026
Filed — Alteration
PLUMBING APPLICATION FOR INTERIOR RENOVATION OF AN EXISTING (1) ONE FAMILY DWELLING. FILED IN CONJUNCTION WITH ALTERATION APPLICATION # B01317375-I1. CAP AND REMOVE GAS BOILER, HWH, REPLACE AND INSTALL NEW PLUMBING FIXTURES AS PER PLANS.
B01317375-P1
06/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
AKM RAHMAN
06/16/2026
Special inspection requirement — HVAC-R and service water heating equipment
AKM RAHMAN
06/16/2026
Special inspection requirement — Energy Code Compliance Inspections
AKM RAHMAN
06/16/2026
Special inspection requirement — Maintenance information
AKM RAHMAN
06/16/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
AKM RAHMAN
06/16/2026
Special inspection requirement — HVAC-R and service water heating system controls
AKM RAHMAN
05/26/2026
Signed off — Alteration
INSTALL NEW TEMPORARY WOOD CONSTRUCTION FENCE AS PER DRAWINGS.
B01313949-I1
02/26/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/26/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/26/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/08/2026
Permit issued — Plumbing
B01317375-S1-PL
12/24/2025
Permit issued — General Construction
B01317375-I1-GC
12/23/2025
Objection resolved — Addressed
12/16/2025
Objection resolved — Addressed
12/12/2025
Objection resolved — Addressed
12/12/2025
Objection resolved — Addressed
12/12/2025
Objection resolved — Addressed
12/12/2025
Objection resolved — Addressed
11/25/2025
Objection raised — Admin
11/25/2025
Objection raised — Cost
11/25/2025
Objection raised — Inspections
11/24/2025
Objection raised — Scope
11/24/2025
Objection raised — Scope
11/24/2025
Objection raised — Admin
11/18/2025
Filed — Alteration
PLUMBING APPLICATION FOR INTERIOR RENOVATION OF AN EXISTING (1) ONE FAMILY DWELLING. FILED IN CONJUNCTION WITH ALTERATION APPLICATION # B01317375-I1. CAP AND REMOVE GAS BOILER, HWH, REPLACE AND INSTALL NEW PLUMBING FIXTURES AS PER PLANS.
B01317375-S1
11/13/2025
Filed — Alteration
PLUMBING APPLICATION FOR INTERIOR RENOVATION OF AN EXISTING (1) ONE FAMILY DWELLING. FILED IN CONJUNCTION WITH ALTERATION APPLICATION # B01317375-I1. CAP AND REMOVE GAS BOILER, HWH, REPLACE AND INSTALL NEW PLUMBING FIXTURES AS PER PLANS.
B01317375-I1
11/13/2025
Objection raised — Other
11/12/2025
Special inspection requirement — Interior lighting power
AKM RAHMAN
11/12/2025
Special inspection requirement — Air barrier - visual inspection
AKM RAHMAN
11/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
AKM RAHMAN
11/11/2025
Special inspection requirement — Energy Code Compliance Inspections
AKM RAHMAN
11/11/2025
Special inspection requirement — Fire-Resistance Rated Construction
AKM RAHMAN
11/11/2025
Special inspection requirement — Fenestration air leakage
AKM RAHMAN
11/11/2025
Special inspection requirement — Fenestration areas
AKM RAHMAN
11/11/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
AKM RAHMAN
11/11/2025
Special inspection requirement — Insulation placement and R values
AKM RAHMAN
11/08/2025
Filed — Alteration
FILING FOR INTERIOR RENOVATION OF EXIST 2 STORY, ATTIC AND CELLAR (1) ONE FAMILY DWELLING UNIT. NEW PARTITION WALLS, FINISH FLOORING, NEW INTERIOR DOORS, NEW TILES AND NEW PLUMBING FIXTURES AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
B01314642-I1
11/07/2025
Permit issued — Construction Fence
B01313949-I1-FN
11/06/2025
Filed — Alteration
INSTALL NEW TEMPORARY WOOD CONSTRUCTION FENCE AS PER DRAWINGS.
B01313949-I1
11/05/2025
Special inspection requirement — Interior lighting power
11/05/2025
Special inspection requirement — Fenestration areas
11/05/2025
Special inspection requirement — Fenestration air leakage
11/05/2025
Special inspection requirement — Air barrier - visual inspection
11/05/2025
Special inspection requirement — Insulation placement and R values
11/05/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
11/05/2025
Special inspection requirement — Fire-Resistance Rated Construction
11/05/2025
Special inspection requirement — Energy Code Compliance Inspections
11/05/2025
Special inspection requirement — Footing and Foundation
03/22/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offALL PRO PLBG & HTG INC01/08/2026
DOB NOWGeneral ConstructionSigned-offACE GROUP NY CORP12/24/2025
DOB NOWConstruction FenceSigned-offACE GROUP NY CORP11/07/2025
1 project · most recent 06/17/2026
Gas Water/Sanitary
FiledStatusContractorScope
06/17/2026Signed-offALL PRO PLBG & HTG INCGas, Water/Sanitary
1 project · most recent 07/09/2026
General Wiring
FiledStatusContractorScope
07/09/2026CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
1 project · most recent 11/08/2025
Concrete Wood
FiledStatusContractorScope
11/08/2025——Concrete, Wood
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
02/26/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/26/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/26/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 34
DateRequirementInspectorRole
06/22/2026Fire-Resistant Penetrations and JointsAKM RAHMANspecial
06/22/2026HVAC-R and service water heating equipmentAKM RAHMANenergy_progress
06/22/2026HVAC-R and service water piping design and insulationAKM RAHMANenergy_progress
06/22/2026HVAC-R and service water heating system controlsAKM RAHMANenergy_progress
06/22/2026Maintenance informationAKM RAHMANenergy_progress
06/22/2026Energy Code Compliance InspectionsAKM RAHMANprogress
06/16/2026Fire-Resistant Penetrations and JointsAKM RAHMANspecial
06/16/2026HVAC-R and service water heating equipmentAKM RAHMANenergy_progress
06/16/2026Energy Code Compliance InspectionsAKM RAHMANprogress
06/16/2026Maintenance informationAKM RAHMANenergy_progress
06/16/2026HVAC-R and service water piping design and insulationAKM RAHMANenergy_progress
06/16/2026HVAC-R and service water heating system controlsAKM RAHMANenergy_progress
11/12/2025Interior lighting powerAKM RAHMANenergy_progress
11/12/2025Air barrier - visual inspectionAKM RAHMANenergy_progress
11/11/2025Fire-Resistant Penetrations and JointsAKM RAHMANspecial
11/11/2025Energy Code Compliance InspectionsAKM RAHMANprogress
11/11/2025Fire-Resistance Rated ConstructionAKM RAHMANprogress
11/11/2025Fenestration air leakageAKM RAHMANenergy_progress
11/11/2025Fenestration areasAKM RAHMANenergy_progress
11/11/2025Fenestration and door U-factor and product ratingsAKM RAHMANenergy_progress
11/11/2025Insulation placement and R valuesAKM RAHMANenergy_progress
11/05/2025Interior lighting power—energy_progress
11/05/2025Fenestration areas—energy_progress
11/05/2025Fenestration air leakage—energy_progress
11/05/2025Air barrier - visual inspection—energy_progress
Latest 25 of 34.
▾Documents — 34 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/20/2026B01313949-I1Request digital key ↗
08/19/2026B01317375-S1Request digital key ↗
08/19/2026B01317375-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications26
▸DOB NOWProgress Inspector Seal & Signature18
08/25/2026B01317375-P1Open ↗
08/25/2026B01317375-P1Open ↗
08/25/2026B01317375-P1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/19/2026B01317375-S1Open ↗
08/19/2026B01317375-I1Open ↗
08/19/2026B01317375-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/25/2026B01317375-P1Open ↗
08/24/2026B01317375-S1Open ↗
08/24/2026B01317375-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/19/2026B01317375-I1Open ↗
08/19/2026B01317375-P1Open ↗
08/19/2026B01317375-S1Open ↗